![]() |
Volumn 45, Issue 1, 2003, Pages 61-73
|
Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation
|
Author keywords
Dynamic tool allocation strategy; Operation sequence; Tool movement; Tool waiting time
|
Indexed keywords
COMPUTER SIMULATION;
INDUSTRIAL ENGINEERING;
OPERATIONS RESEARCH;
DYNAMIC TOOL ALLOCATION;
FLEXIBLE MANUFACTURING SYSTEMS;
|
EID: 0038243040
PISSN: 03608352
EISSN: None
Source Type: Journal
DOI: 10.1016/S0360-8352(03)00019-6 Document Type: Article |
Times cited : (31)
|
References (13)
|