메뉴 건너뛰기




Volumn 20, Issue 6-7, 1996, Pages 821-844

Perspectives on model based integration of process operations

Author keywords

[No Author keywords available]

Indexed keywords

CHEMICAL OPERATIONS; CHEMICAL PLANTS; INTEGRATION; MATHEMATICAL MODELS; MATHEMATICAL PROGRAMMING; OPERATIONS RESEARCH; PLANNING; PLANT LAYOUT; PREDICTIVE CONTROL SYSTEMS; SCHEDULING;

EID: 0030174484     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/0098-1354(95)00184-0     Document Type: Article
Times cited : (56)

References (30)
  • 1
    • 0027804571 scopus 로고
    • On the tuning of nonlinear model predictive control algorithms
    • San Francisco
    • Ali E. and E. Zafiriou. On the tuning of nonlinear model predictive control algorithms. In Proc. Americal Control Conf., San Francisco, p. 786 (1993).
    • (1993) Proc. Americal Control Conf. , pp. 786
    • Ali, E.1    Zafiriou, E.2
  • 2
    • 15844370799 scopus 로고
    • Integrated planning and scheduling under uncertainty using recursive partitioning of time and equipment aggregation
    • School of Chemical Engineering, Purdue University, West Lafayett
    • Bassett M. H., S. Subrahmanyam, J. F. Pekny and G. V. Reklaitis, Integrated planning and scheduling under uncertainty using recursive partitioning of time and equipment aggregation. School of Chemical Engineering, Purdue University, West Lafayett, Working Paper (1994).
    • (1994) Working Paper
    • Bassett, M.H.1    Subrahmanyam, S.2    Pekny, J.F.3    Reklaitis, G.V.4
  • 3
    • 15844384755 scopus 로고
    • Control of sheet and film - A critical review
    • Purdue University, W. Lafayette
    • Braatz R. D., Control of sheet and film - a critical review. In Midwest Process Control Workshop, Purdue University, W. Lafayette (1994).
    • (1994) Midwest Process Control Workshop
    • Braatz, R.D.1
  • 4
    • 0026925488 scopus 로고
    • Identification and cross-directional control of coating processes
    • Braatz R. D., M. L. Tyler, M. Morari, F. R. Pranckh and L. Sartor, Identification and cross-directional control of coating processes. AIChE Jl 38, 1329-1339 (1992).
    • (1992) AIChE Jl , vol.38 , pp. 1329-1339
    • Braatz, R.D.1    Tyler, M.L.2    Morari, M.3    Pranckh, F.R.4    Sartor, L.5
  • 6
    • 0004000855 scopus 로고
    • Chesapeake Decision Sciences, Inc., 200 South Street, New Providence, NJ 07974
    • Chesapeake Decision Sciences Inc., The CHES Problems. Chesapeake Decision Sciences, Inc., 200 South Street, New Providence, NJ 07974 (1989).
    • (1989) The CHES Problems
  • 9
    • 0024668467 scopus 로고
    • Model predictive control: Theory and practice - A survey
    • Garcia C. E., D. M. Pratt and M. Morari, Model predictive control: theory and practice - a survey. Automatica 25, 335-348 (1989).
    • (1989) Automatica , vol.25 , pp. 335-348
    • Garcia, C.E.1    Pratt, D.M.2    Morari, M.3
  • 11
    • 0027545176 scopus 로고
    • A general algorithm for short term scheduling of batch operations - I. MILP formulation
    • Kondili E., C. C. Pantelides and R. W. H. Sergent, A general algorithm for short term scheduling of batch operations - I. MILP formulation. Computers chem. Engng 17, 211-227 (1993).
    • (1993) Computers Chem. Engng , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sergent, R.W.H.3
  • 12
    • 21144482251 scopus 로고
    • A distributed exact algorithm for the multiple resource constrained sequencing problem
    • Kudva G. K. and J. F. Pekny, A distributed exact algorithm for the multiple resource constrained sequencing problem. Ann. Opers Res. 42, 25-54 (1993).
    • (1993) Ann. Opers Res. , vol.42 , pp. 25-54
    • Kudva, G.K.1    Pekny, J.F.2
  • 13
    • 0009665725 scopus 로고
    • Bridging the gap - Integration of design, operatons, scheduling and control
    • invited paper, Crested Butte, CO
    • Macchietto S. Bridging the gap - integration of design, operatons, scheduling and control. Foundations of Computer Aided Process Operations Conf. Proc., invited paper, Crested Butte, CO (1993).
    • (1993) Foundations of Computer Aided Process Operations Conf. Proc.
    • Macchietto, S.1
  • 16
    • 0026256602 scopus 로고
    • Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods
    • Pekny J. F. and D. L. Miller, Exact solution of the no-wait flowshop scheduling problem with a comparison to heuristic methods. Computers chem. Engng 15, 741-748 (1991).
    • (1991) Computers Chem. Engng , vol.15 , pp. 741-748
    • Pekny, J.F.1    Miller, D.L.2
  • 17
    • 0002259729 scopus 로고
    • Learning to solve process scheduling problems: The role of rigorous knowledge acquisition frameworks
    • Invited Paper, Crested Butte, CO
    • Pekny J. F. and M. Zentner, Learning to solve process scheduling problems: the role of rigorous knowledge acquisition frameworks. Foundations of Computer Aided Process Operations Conf. Proc. Invited Paper, Crested Butte, CO (1993).
    • (1993) Foundations of Computer Aided Process Operations Conf. Proc.
    • Pekny, J.F.1    Zentner, M.2
  • 18
    • 0007822544 scopus 로고
    • A statged primal-dual algorithm for finding a minimum cost perfect two-matching in an undirected graph
    • Pekny J. F. and D. L. Miller, A statged primal-dual algorithm for finding a minimum cost perfect two-matching in an undirected graph. ORSA Jl Comput. 6, 68-81 (1994).
    • (1994) ORSA Jl Comput. , vol.6 , pp. 68-81
    • Pekny, J.F.1    Miller, D.L.2
  • 21
    • 0028319453 scopus 로고
    • Introducing shallow knowlege in batch operations models
    • Rotstein G. E., R. Lavie and D. R. Lewin, Introducing shallow knowlege in batch operations models. Computers Chem. Engng 18S, S499-S503 (1993).
    • (1993) Computers Chem. Engng , vol.18 S
    • Rotstein, G.E.1    Lavie, R.2    Lewin, D.R.3
  • 22
    • 0026108226 scopus 로고
    • MINLP amodel for cyclic multiproduct scheduling on continuous parallel lines
    • Sahinidis N. V. and I. E. Grossmann, MINLP amodel for cyclic multiproduct scheduling on continuous parallel lines. Computers Chem. Engng 15, 85-103 (1991).
    • (1991) Computers Chem. Engng , vol.15 , pp. 85-103
    • Sahinidis, N.V.1    Grossmann, I.E.2
  • 23
    • 0026143149 scopus 로고
    • Reformulation of multiperiod MILP models for planning and scheduling of chemical processes
    • Sahinidis N. V. and I. E. Grossmann, Reformulation of multiperiod MILP models for planning and scheduling of chemical processes. Computers chem. Engng 15, 255-272 (1991).
    • (1991) Computers Chem. Engng , vol.15 , pp. 255-272
    • Sahinidis, N.V.1    Grossmann, I.E.2
  • 24
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations - II. Computational issues
    • Shah N., C. C. Pantelides and R. W. H. Sargent, A general algorithm for short-term scheduling of batch operations - II. Computational issues. Computers chem. Engng 17, 229-244 (1993).
    • (1993) Computers Chem. Engng , vol.17 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 26
    • 0027791070 scopus 로고
    • Scheduling of multipurpose batch chemical plants with resource constraints
    • Tsirukis A., S. Papageorgaki and G. V. Reklaitis, Scheduling of multipurpose batch chemical plants with resource constraints. Ind. Engng Chem. Res. 32, 3037-3050 (1993).
    • (1993) Ind. Engng Chem. Res. , vol.32 , pp. 3037-3050
    • Tsirukis, A.1    Papageorgaki, S.2    Reklaitis, G.V.3
  • 27
    • 0010440703 scopus 로고
    • An interval based mathematical model for the scheduling of resource-constrained batch chemical processes
    • Antalya, Turkey
    • Zentner M. G. and G. V. Reklaitis, An interval based mathematical model for the scheduling of resource-constrained batch chemical processes. NATO ASI on Batch Processing Systems Engineering. Antalya, Turkey (1992).
    • (1992) NATO ASI on Batch Processing Systems Engineering
    • Zentner, M.G.1    Reklaitis, G.V.2
  • 29
    • 0028546642 scopus 로고
    • Practical considerations in using model-based optimization for the scheduling and planning of batch/semi-continuous processes
    • Zentner M. G., J. F. Pekny, G. V. Reklaitis and J. Gupta, Practical considerations in using model-based optimization for the scheduling and planning of batch/semi-continuous processes. J. Proc. Cont. 4, 259-280 (1994b).
    • (1994) J. Proc. Cont. , vol.4 , pp. 259-280
    • Zentner, M.G.1    Pekny, J.F.2    Reklaitis, G.V.3    Gupta, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.