메뉴 건너뛰기




Volumn 25, Issue 3, 2014, Pages 334-350

Adaptation of the value stream mapping approach to the design of lean engineer-to-order production systems: A case study

Author keywords

Case study; Engineer to order; Production systems; Value stream mapping

Indexed keywords

CONSTRUCTION INDUSTRY; ENGINEERS; INDUSTRIAL APPLICATIONS; MAPPING; PRODUCTION ENGINEERING;

EID: 84897381146     PISSN: 1741038X     EISSN: None     Source Type: Journal    
DOI: 10.1108/JMTM-05-2012-0054     Document Type: Article
Times cited : (60)

References (51)
  • 1
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
    • Abdulmaleka, F.A. and Rajgopal, J. (2007), "Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study", International Journal of Production Economics, Vol. 107, pp. 223-236.
    • (2007) International Journal of Production Economics , vol.107 , pp. 223-236
    • Abdulmaleka, F.A.1    Rajgopal, J.2
  • 4
    • 79953033086 scopus 로고    scopus 로고
    • Evaluating the effect of construction process characteristics to the applicability of lean principles
    • Al-Sudairi, A.A. (2007), "Evaluating the effect of construction process characteristics to the applicability of lean principles", Construction Innovation: Information, Process, Management, Vol. 7 No. 1, pp. 99-121.
    • (2007) Construction Innovation: Information, Process, Management , vol.7 , Issue.1 , pp. 99-121
    • Al-Sudairi A., .A.1
  • 5
    • 66149172233 scopus 로고    scopus 로고
    • Simulation model for the design of lean manufacturing systems-A case study
    • Anand, G. and Kodali, R. (2009), "Simulation model for the design of lean manufacturing systems-a case study", International Journal of Productivity and Quality Management, Vol. 4 No. 5, pp. 691-714.
    • (2009) International Journal of Productivity and Quality Management , vol.4 , Issue.5 , pp. 691-714
    • Anand, G.1    Kodali, R.2
  • 6
    • 0037366641 scopus 로고    scopus 로고
    • Value stream analysis of a re-engineered construction supply chain
    • Arbulu, R., Tommelein, I., Walsh, K. and Hershauer, J. (2003), "Value stream analysis of a re-engineered construction supply chain", Building Research & Information, Vol. 31 No. 2, pp. 161-171.
    • (2003) Building Research & Information , vol.31 , Issue.2 , pp. 161-171
    • Arbulu, R.1    Tommelein, I.2    Walsh, K.3    Hershauer, J.4
  • 7
    • 33746814817 scopus 로고    scopus 로고
    • A new value stream mapping approach for complex production systems
    • Braglia, M., Carmignani, G. and Zammori, F. (2006), "A new value stream mapping approach for complex production systems", International Journal of Production Research, Vol. 44 Nos 18/19, pp. 3929-3952.
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 3929-3952
    • Braglia, M.1    Carmignani, G.2    Zammori, F.3
  • 8
    • 84865400240 scopus 로고    scopus 로고
    • Measuring parameters of lean manufacturing realization
    • Chauhan, G. and Singh, T.P. (2012), "Measuring parameters of lean manufacturing realization", Measuring Business Excellence, Vol. 16 No. 3, pp. 57-71.
    • (2012) Measuring Business Excellence , vol.16 , Issue.3 , pp. 57-71
    • Chauhan, G.1    Singh, T.P.2
  • 9
    • 74549218802 scopus 로고    scopus 로고
    • From value stream mapping toward a lean/sigma continuous improvement process: An industrial case study
    • Chen, J.C., Li, Y. and Shady, B.D. (2010), "From value stream mapping toward a lean/sigma continuous improvement process: an industrial case study", International Journal of Production Research, Vol. 48 No. 4, pp. 1069-1086.
    • (2010) International Journal of Production Research , vol.48 , Issue.4 , pp. 1069-1086
    • Chen, J.C.1    Li, Y.2    Shady, B.D.3
  • 10
    • 84861892320 scopus 로고    scopus 로고
    • Lean production: Mistakes and limitations of accounting systems inside the SME sector
    • Chiarini, A. (2012), "Lean production: mistakes and limitations of accounting systems inside the SME sector", Journal of Manufacturing Technology Management, Vol. 23 No. 5, pp. 681-700.
    • (2012) Journal of Manufacturing Technology Management , vol.23 , Issue.5 , pp. 681-700
    • Chiarini, A.1
  • 11
    • 82955207650 scopus 로고    scopus 로고
    • Improvement of manufacturing operations at a pharmaceutical company: A lean manufacturing approach
    • Chowdary, B.V. and George, D. (2012), "Improvement of manufacturing operations at a pharmaceutical company: a lean manufacturing approach", Journal of Manufacturing Technology Management, Vol. 23 No. 1, pp. 56-75.
    • (2012) Journal of Manufacturing Technology Management , vol.23 , Issue.1 , pp. 56-75
    • Chowdary, B.V.1    George, D.2
  • 12
    • 84897463681 scopus 로고    scopus 로고
    • Use of value mapping tools for manufacturing systems redesign
    • Sethi, S.P., Bogataj, M. and Ros-McDonnell, L. (Eds), Springer, London
    • Dessens, L.F.R. and López, Z.I.C. (2012), "Use of value mapping tools for manufacturing systems redesign", in Sethi, S.P., Bogataj, M. and Ros-McDonnell, L. (Eds), Industrial Engineering: Innovative Networks, Springer, London, pp. 237-245.
    • (2012) Industrial Engineering: Innovative Networks , pp. 237-245
    • Dessens, L.F.R.1    López, Z.I.C.2
  • 14
    • 27644530741 scopus 로고    scopus 로고
    • Value stream macro mapping - A case study of aluminium windows for construction supply chain
    • Elsinore, Denmark, 3-5 August, available at: (accessed 15 April 2012)
    • Fontanini, P.S. and Picchi, F.A. (2004), "Value stream macro mapping - a case study of aluminium windows for construction supply chain", Proceedings of the 12th Annual Conference of the International Group for Lean Construction (IGLC-12), Elsinore, Denmark, 3-5 August, available at: www.iglc2004.dk/13729 (accessed 15 April 2012).
    • (2004) Proceedings of the 12th Annual Conference of the International Group for Lean Construction (IGLC-12)
    • Fontanini, P.S.1    Picchi, F.A.2
  • 15
    • 84867088782 scopus 로고    scopus 로고
    • Interaction in the construction process - system effects for a joinery-products supplier
    • Forsman, S., Bystedt, A. and Öhman, M. (2011), "Interaction in the construction process - system effects for a joinery-products supplier", Lean Construction Journal, pp. 01-18.
    • (2011) Lean Construction Journal , pp. 01-18
    • Forsman, S.1    Bystedt, A.2    Öhman, M.3
  • 16
    • 18844447753 scopus 로고    scopus 로고
    • Qualitative research in marketing: Road-map for a wilderness of complexity and unpredictability
    • Gummesson, E. (2005), "Qualitative research in marketing: road-map for a wilderness of complexity and unpredictability", European Journal of Marketing, Vol. 39 Nos 3/4, pp. 309-327.
    • (2005) European Journal of Marketing , vol.39 , Issue.3-4 , pp. 309-327
    • Gummesson, E.1
  • 17
    • 79955699883 scopus 로고    scopus 로고
    • Design of lean manufacturing systems using value stream mapping with simulation: A case study
    • Gurumurthy, A. and Kodali, R. (2011), "Design of lean manufacturing systems using value stream mapping with simulation: a case study", Journal of Manufacturing Technology Management, Vol. 22 No. 4, pp. 444-473.
    • (2011) Journal of Manufacturing Technology Management , vol.22 , Issue.4 , pp. 444-473
    • Gurumurthy, A.1    Kodali, R.2
  • 18
    • 12744259762 scopus 로고    scopus 로고
    • Using case methods in the study of contemporary business networks
    • Halinen, A. and Törnroos, J.-A. (2005), "Using case methods in the study of contemporary business networks", Journal of Business Research, Vol. 58 No. 9, pp. 1279-1285.
    • (2005) Journal of Business Research , vol.58 , Issue.9 , pp. 1279-1285
    • Halinen, A.1    Törnroos, J.-A.2
  • 20
    • 38749105446 scopus 로고    scopus 로고
    • Implementing lean manufacturing in high-mix production environment
    • Koch, T. (Ed.), Springer, Boston, MA
    • Horbal, R., Kagan, R. and Koch, T. (2008), "Implementing lean manufacturing in high-mix production environment", in Koch, T. (Ed.), Lean Business Systems and Beyond, Springer, Boston, MA, pp. 257-267.
    • (2008) Lean Business Systems and beyond , pp. 257-267
    • Horbal, R.1    Kagan, R.2    Koch, T.3
  • 21
    • 15844398088 scopus 로고    scopus 로고
    • The Lean Enterprise Institute, Cambridge, MA
    • Jones, D. and Womack, J. (2003), Seeing the Whole, The Lean Enterprise Institute, Cambridge, MA.
    • (2003) Seeing the Whole
    • Jones, D.1    Womack, J.2
  • 22
    • 84861083406 scopus 로고    scopus 로고
    • Value network mapping (VNM): Visualization and analysis of multiple flows in value stream maps
    • St Louis, MO, USA, 10-11 September, available at (accessed 15 April 2012)
    • Khaswala, Z.N. and Irani, S.A. (2001), "Value network mapping (VNM): visualization and analysis of multiple flows in value stream maps", Proceedings of the Lean Management Solutions Conference, St Louis, MO, USA, 10-11 September, available at: http://210.212. 115.113:81/AK.Dey/SummerProject/ ValueChain/Value%2520Network%2520Mapping% 2520(VNM).pdf (accessed 15 April 2012).
    • (2001) Proceedings of the Lean Management Solutions Conference
    • Khaswala, Z.N.1    Irani, S.A.2
  • 23
    • 0037238281 scopus 로고    scopus 로고
    • The complementary use of IDEF and UML modelling approaches
    • Kim, C.H., Weston, R.H., Hodgson, A. and Lee, K.H. (2003), "The complementary use of IDEF and UML modelling approaches", Computers in Industry, Vol. 50 No. 1, pp. 35-56.
    • (2003) Computers in Industry , vol.50 , Issue.1 , pp. 35-56
    • Kim, C.H.1    Weston, R.H.2    Hodgson, A.3    Lee, K.H.4
  • 24
    • 34249113269 scopus 로고    scopus 로고
    • An application of simulation and value stream mapping in lean manufacturing
    • Verbraeck, A. and Krug, W. (Eds), available at (accessed 23 November 2012)
    • Lian, Y. (2002), "An application of simulation and value stream mapping in lean manufacturing", in Verbraeck, A. and Krug, W. (Eds), Proceedings 14th European Simulation Symposium, available at: www.scs-europe.net/services/ess2002/PDF/log-11.pdf (accessed 23 November 2012).
    • (2002) Proceedings 14th European Simulation Symposium
    • Lian, Y.1
  • 27
    • 51749109073 scopus 로고    scopus 로고
    • Template based design of lean production systems
    • Matt, D.T. (2008), "Template based design of lean production systems", Journal of Manufacturing Technology Management, Vol. 19 Nos 7/8, pp. 783-797.
    • (2008) Journal of Manufacturing Technology Management , vol.19 , Issue.7-8 , pp. 783-797
    • Matt D., .T.1
  • 28
    • 33947200164 scopus 로고    scopus 로고
    • Characterizing and structuring a new make-to-forecast production strategy
    • Meredith, J. and Akinc, U. (2007), "Characterizing and structuring a new make-to-forecast production strategy", Journal of Operations Management, Vol. 25 No. 3, pp. 623-642.
    • (2007) Journal of Operations Management , vol.25 , Issue.3 , pp. 623-642
    • Meredith, J.1    Akinc, U.2
  • 31
    • 84896783621 scopus 로고    scopus 로고
    • Production efficiency improvement in batch production system using value stream mapping and simulation: A case study of the roasted and ground coffee industry
    • Parthanadee, P. and Buddhakulsomsiri, J. (2014), "Production efficiency improvement in batch production system using value stream mapping and simulation: a case study of the roasted and ground coffee industry", Production Planning & Control: The Management of Operations, Vol. 25 No. 5, pp. 425-446.
    • (2014) Production Planning & Control: The Management of Operations , vol.25 , Issue.5 , pp. 425-446
    • Parthanadee, P.1    Buddhakulsomsiri, J.2
  • 32
    • 2942567552 scopus 로고    scopus 로고
    • Case-study method in small business and entrepreneurial research
    • Perren, L. and Ram, M. (2004), "Case-study method in small business and entrepreneurial research", International Small Business Journal, Vol. 22 No. 1, pp. 83-101.
    • (2004) International Small Business Journal , vol.22 , Issue.1 , pp. 83-101
    • Perren, L.1    Ram, M.2
  • 33
    • 84883624128 scopus 로고    scopus 로고
    • Production flow analysis through value stream mapping: A lean manufacturing process case study
    • Rahani, A.R. and Al-Ashraf, M. (2012), "Production flow analysis through value stream mapping: a lean manufacturing process case study", Procedia Engineering, Vol. 41, pp. 1727-1734.
    • (2012) Procedia Engineering , vol.41 , pp. 1727-1734
    • Rahani, A.R.1    Al-Ashraf, M.2
  • 34
    • 80755156425 scopus 로고    scopus 로고
    • Use of value mapping tools for manufacturing systems redesign
    • London, UK, 6-8 July, available at (accessed 26 March 2012)
    • Romero, D. and Chávez, Z. (2011), "Use of value mapping tools for manufacturing systems redesign", Proceedings of the World Congress on Engineering 2011 Vol I WCE 2011, London, UK, 6-8 July, available at: www.iaeng.org/publication/WCE2011/ WCE2011-pp850-854.pdf (accessed 26 March 2012).
    • (2011) Proceedings of the World Congress on Engineering 2011 Vol i WCE 2011
    • Romero, D.1    Chávez, Z.2
  • 37
    • 84923467134 scopus 로고    scopus 로고
    • Value stream engineering - four paradigms for process design in industrial engineering
    • paper presented at Stuttgart, Germany (CD-ROM), 31 July-4 August
    • Schweizer, W. (2011), "Value stream engineering - four paradigms for process design in industrial engineering", paper presented at 21st International Conference on Production Research, Stuttgart, Germany (CD-ROM), 31 July-4 August.
    • (2011) 21st International Conference on Production Research
    • Schweizer, W.1
  • 39
    • 27844589388 scopus 로고    scopus 로고
    • Application of value stream mapping for lean operations and cycle time reduction: An Indian case study
    • Seth, D. and Gupta, V. (2005), "Application of value stream mapping for lean operations and cycle time reduction: an Indian case study", Production Planning & Control, Vol. 16 No. 1, pp. 44-59.
    • (2005) Production Planning & Control , vol.16 , Issue.1 , pp. 44-59
    • Seth, D.1    Gupta, V.2
  • 40
    • 43049145528 scopus 로고    scopus 로고
    • Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context
    • Seth, D., Seth, N. and Goel, D. (2008), "Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context", Journal of Manufacturing Technology Management, Vol. 19 No. 4, pp. 529-550.
    • (2008) Journal of Manufacturing Technology Management , vol.19 , Issue.4 , pp. 529-550
    • Seth, D.1    Seth, N.2    Goel, D.3
  • 41
    • 34047201155 scopus 로고    scopus 로고
    • Persuasion with case studies
    • Siggelkow, N. (2007), "Persuasion with case studies", Academy of Management Journal, Vol. 50 No. 1, pp. 20-24.
    • (2007) Academy of Management Journal , vol.50 , Issue.1 , pp. 20-24
    • Siggelkow, N.1
  • 42
    • 70350291357 scopus 로고    scopus 로고
    • Value stream mapping as a versatile tool for lean implementation: An Indian case study of a manufacturing firm
    • Singh, B. and Sharma, S.K. (2009), "Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm", Measuring Business Excellence, Vol. 13 No. 3, pp. 58-68.
    • (2009) Measuring Business Excellence , vol.13 , Issue.3 , pp. 58-68
    • Singh, B.1    Sharma, S.K.2
  • 43
    • 32644470629 scopus 로고    scopus 로고
    • Lean tool selection in a die casting unit: A fuzzy-based decision support heuristic
    • Singh, R.K., Kumar, S., Choudhury, A.K. and Tiwari, M.K. (2006), "Lean tool selection in a die casting unit: a fuzzy-based decision support heuristic", International Journal of Production Research, Vol. 44 No. 7, pp. 1399-1429.
    • (2006) International Journal of Production Research , vol.44 , Issue.7 , pp. 1399-1429
    • Singh, R.K.1    Kumar, S.2    Choudhury, A.K.3    Tiwari, M.K.4
  • 44
    • 84897377525 scopus 로고    scopus 로고
    • Value stream mapping (VSM) in a manufacture-to-order small and medium enterprise
    • paper presented at Tokyo, Japan, 5-8 August, available at: (accessed 5 May 2012)
    • Stamm, M.L. and Neitzert, T. (2008), "Value stream mapping (VSM) in a manufacture-to-order small and medium enterprise", paper presented at the 3rd World Conference on Production and Operations Management (POM TOKYO 2008), Tokyo, Japan, 5-8 August, available at: http://aut.researchgateway.ac.nz/ bitstream/handle/10292/3856/ValueStream MappingMSTN.pdf?sequence=2 (accessed 5 May 2012).
    • (2008) The 3rd World Conference on Production and Operations Management (POM TOKYO 2008)
    • Stamm, M.L.1    Neitzert, T.2
  • 46
    • 55449112505 scopus 로고    scopus 로고
    • An application of value stream management to the improvement of a global supply chain: A case study in the footwear industry
    • Taylor, D.H. (2009), "An application of value stream management to the improvement of a global supply chain: a case study in the footwear industry", International Journal of Logistics Research and Applications, Vol. 12 No. 1, pp. 45-62.
    • (2009) International Journal of Logistics Research and Applications , vol.12 , Issue.1 , pp. 45-62
    • Taylor D., .H.1
  • 47
    • 77956640085 scopus 로고    scopus 로고
    • Application of value stream mapping in an Indian camshaft manufacturing organization
    • Vinodh, S., Arvind, K.R. and Somanaathan, M. (2010), "Application of value stream mapping in an Indian camshaft manufacturing organization", Journal of Manufacturing Technology Management, Vol. 21 No. 7, pp. 888-900.
    • (2010) Journal of Manufacturing Technology Management , vol.21 , Issue.7 , pp. 888-900
    • Vinodh, S.1    Arvind, K.R.2    Somanaathan, M.3
  • 48
    • 77349113390 scopus 로고    scopus 로고
    • Recommendations for using the case study method in international business research
    • Vissak, T. (2010), "Recommendations for using the case study method in international business research", The Qualitative Report, Vol. 15 No. 2, pp. 370-388.
    • (2010) The Qualitative Report , vol.15 , Issue.2 , pp. 370-388
    • Vissak, T.1
  • 51
    • 84868302516 scopus 로고    scopus 로고
    • Key practices, manufacturing capability and attainment of manufacturing goals: The perspective of project/engineer-to-order manufacturing
    • Yang, L.R. (2013), "Key practices, manufacturing capability and attainment of manufacturing goals: the perspective of project/engineer-to-order manufacturing", International Journal of Project Management, Vol. 31, pp. 109-125.
    • (2013) International Journal of Project Management , vol.31 , pp. 109-125
    • Yang L., .R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.