-
1
-
-
85026643946
-
Considerations for Streamlining a Vertically Integrated Company: A Case Study
-
Akel, N., Tommelein, I., Boyers J., Walsh, K., Hershauer, J, (2001) “Considerations for Streamlining a Vertically Integrated Company: A Case Study”. IGLC 9, Singapore. International Group for Lean Construction.
-
(2001)
IGLC 9, Singapore. International Group for Lean Construction
-
-
Akel, N.1
Tommelein, I.2
Boyers, J.3
Walsh, K.4
Hershauer, J.5
-
4
-
-
84866113460
-
-
IGLC 11, Blacksburg, USA. International Group for Lean Construction
-
Azambuja, M.M.B. and Formoso, C.T. (2003) “Guidelines for the Improvement of Design, Procurement and Installation of Elevators Using Supply Chain Management Concepts”. IGLC 11, Blacksburg, USA. International Group for Lean Construction.
-
(2003)
Guidelines for the Improvement of Design, Procurement and Installation of Elevators Using Supply Chain Management Concepts
-
-
Azambuja, M.M.B.1
Formoso, C.T.2
-
6
-
-
84866116265
-
Björnfot, Anders and Sandberg, Erik (2010)
-
IGLC 18, Haifa, Israel
-
Bildsten, Louise, Björnfot, Anders and Sandberg, Erik (2010) “Value-driven vs Marketdriven Purchasing of Kitchen Cabinets”. IGLC 18, Haifa, Israel.
-
Value-Driven Vs Marketdriven Purchasing of Kitchen Cabinets
-
-
Bildsten, L.1
-
7
-
-
18844456982
-
-
Dissertations, 0345-7524, Dep. of Management and Economics, Univ., Linköping
-
Bröte, Staffan (2002) Towards Market Driven Manufacturing Systems Design. Linköping Studies in Science and Technology. Dissertations, 0345-7524; 734. Dep. of Management and Economics, Univ., Linköping.
-
(2002)
Towards Market Driven Manufacturing Systems Design. Linköping Studies in Science and Technology
, pp. 734
-
-
Bröte, S.1
-
9
-
-
85026649745
-
Reducing Lead Time for Electrical Switchgear
-
Elfving, Jan, Tommelein, Iris D. and Ballard, Glenn (2002) “Reducing Lead Time for Electrical Switchgear”. IGLC 10, Gramado, Brazil. International Group for Lean Construction.
-
(2002)
IGLC 10, Gramado, Brazil. International Group for Lean Construction
-
-
Elfving, J.1
Tommelein, I.D.2
Ballard, G.3
-
12
-
-
85006444519
-
Lean Principles in Industrialized Housing Production: The Need for a Cultural Change
-
Höök, Matilda and Stehn, Lars (2008) “Lean Principles in Industrialized Housing Production: The Need for a Cultural Change”. Lean Construction Journal, 20-33.
-
(2008)
Lean Construction Journal
, pp. 20-33
-
-
Höök, M.1
Stehn, L.2
-
17
-
-
75649091890
-
Research Validation: Challenges and Opportunities in the Construction Domain
-
Lucko, G. and Rojas, E. (2010) “Research Validation: Challenges and Opportunities in the Construction Domain”. Journal of Construction Engineering and Management, 136 (1), 127.
-
(2010)
Journal of Construction Engineering and Management
, vol.136
, Issue.1
, pp. 127
-
-
Lucko, G.1
Rojas, E.2
-
20
-
-
84856681074
-
Implementing Standardisation in Medium-Sized Construction Firms: Facilitating Site Managers’ Feeling of Freedom through a Bottom-up Approach
-
Polesie, P., Frödell, M. and Josephson, P.-E. (2009) “Implementing Standardisation in Medium-Sized Construction Firms: Facilitating Site Managers’ Feeling of Freedom through a Bottom-up Approach”. IGLC 17, Taiwan. International Group for Lean Construction, 317-26.
-
(2009)
IGLC 17, Taiwan. International Group for Lean Construction
, pp. 317-326
-
-
Polesie, P.1
Frödell, M.2
Josephson, P.-E.3
-
22
-
-
0036154408
-
Expanding the Meaning of Standardisation within Construction Processes
-
Santos, Aguinaldo, Formoso, Carlos Torres and Tookey, J.E. (2002) “Expanding the Meaning of Standardisation within Construction Processes”. The TQM Magazine, 14 (1), 25-33.
-
(2002)
The TQM Magazine
, vol.14
, Issue.1
, pp. 25-33
-
-
Santos, A.1
Formoso, C.T.2
Tookey, J.E.3
|