-
1
-
-
72249091967
-
Lean manufacturing implementation to a robotic-press line at A G Simpson Automotive Systems
-
Istanbul, Turkey, 19-22 June 7-12, available at: (accessed 11 June 2008)
-
Abduelmula, A., MacIsaac, R. and ElMekkawy, T.Y. (2005), "Lean manufacturing implementation to a robotic-press line at A G Simpson Automotive Systems", Proceedings of the 35th International Conference on Computers & Industrial Engineering, Istanbul, Turkey, 19-22 June, pp. 7-12, available at: Www.umoncton.ca/cie/ Conferences/35thconf/CIE35%20Proceedings/PDF/087.pdf (accessed 11 June 2008).
-
(2005)
Proceedings of the 35th International Conference on Computers & Industrial Engineering
-
-
Abduelmula, A.1
MacIsaac, R.2
ElMekkawy, T.Y.3
-
2
-
-
33846919290
-
Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
-
DOI 10.1016/j.ijpe.2006.09.009, PII S0925527306002258, Building Core-Competence Through Operational Excellence
-
Abdulmalek, F.A. and Rajgopal, J. (2007), "Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study", International Journal of Production Economics, Vol. 107 No. 1, pp. 223-36. (Pubitemid 46241844)
-
(2007)
International Journal of Production Economics
, vol.107
, Issue.1
, pp. 223-236
-
-
Abdulmalek, F.A.1
Rajgopal, J.2
-
3
-
-
0032306745
-
Adaptation of JIT phylosophy and kanban technique to a small-sized manufacturing firm; a project management approach
-
PII S0360835298001235
-
Abdul-Nour, G., Lambert, S. and Drolet, J. (1998), "Adaptation of JIT philosophy and Kanban technique to a small-sized manufacturing firm: A project management approach", Computers & Industrial Engineering, Vol. 35 Nos 3/4, pp. 419-22. (Pubitemid 128674743)
-
(1998)
Computers and Industrial Engineering
, vol.35
, Issue.3-4
, pp. 419-422
-
-
Abdul-Nour, G.1
Lambert, S.2
Drolet, J.3
-
4
-
-
43049141510
-
Performance measurement system for lean manufacturing - A perspective from SMEs
-
Anand, G. and Kodali, R. (2008), "Performance measurement system for lean manufacturing - a perspective from SMEs", International Journal of Globalisation and Small Businesses, Vol. 2 No. 4, pp. 371-410.
-
(2008)
International Journal of Globalisation and Small Businesses
, vol.2
, Issue.4
, pp. 371-410
-
-
Anand, G.1
Kodali, R.2
-
5
-
-
0034175343
-
Lean production: A study of application in a traditional manufacturing environment
-
DOI 10.1080/095372800232252
-
Bamber, L. and Dale, B.G. (2000), "Lean production: A study of application in a traditional manufacturing environment", Production Planning & Control, Vol. 11 No. 3, pp. 291-8. (Pubitemid 35394358)
-
(2000)
Production Planning and Control
, vol.11
, Issue.3
, pp. 291-298
-
-
Bamber, L.1
Dale, B.G.2
-
6
-
-
72249088670
-
-
unpublished Master's thesis, Lund Institute of Technology, Lund, available at: (accessed 11 June 2008)
-
Berg, A. and Ohlsson, F. (2005), "Lean manufacturing at Volvo truck production Australia - development of an implementation strategy", unpublished Master's thesis, Lund Institute of Technology, Lund, available at: Http://epubl.ltu.se/1402-1617/2005/222/index-en.html (accessed 11 June 2008).
-
(2005)
Lean Manufacturing at Volvo Truck Production Australia - Development of an Implementation Strategy
-
-
Berg, A.1
Ohlsson, F.2
-
7
-
-
33746814817
-
A new value stream mapping approach for complex production systems
-
DOI 10.1080/00207540600690545, PII V80533272016Q178
-
Braglia, M., Carmignani, G. and Zammori, F. (2006), "A new value stream mapping approach for complex production systems", International Journal of Production Research, Vol. 44 No. 18, pp. 3929-52. (Pubitemid 44181131)
-
(2006)
International Journal of Production Research
, vol.44
, Issue.18-19
, pp. 3929-3952
-
-
Braglia, M.1
Carmignani, G.2
Zammori, F.3
-
8
-
-
0030270529
-
Lean manufacturing optimization of automotive motor compartment system
-
Braiden, B.W. and Morrison, K.R. (1996), "Lean manufacturing optimization of automotive motor compartment system", Computers & Industrial Engineering, Vol. 31 Nos 1/2, pp. 99-102. (Pubitemid 126379993)
-
(1996)
Computers and Industrial Engineering
, vol.31
, Issue.1-2
, pp. 99-102
-
-
Braiden, B.W.1
Morrison, K.R.2
-
9
-
-
66149185213
-
From current state to future state: Mapping the steel to component supply chain
-
Brunt, D. (2000), "From current state to future state: Mapping the steel to component supply chain", International Journal of Logistics: Research and Applications, Vol. 3 No. 3, pp. 259-71.
-
(2000)
International Journal of Logistics: Research and Applications
, vol.3
, Issue.3
, pp. 259-271
-
-
Brunt, D.1
-
10
-
-
0026954975
-
Simulation studies in JIT production
-
Chu, C.H. and Shih, W.L. (1992), "Simulation studies in JIT production", International Journal of Production Research, Vol. 30 No. 11, pp. 2573-86.
-
(1992)
International Journal of Production Research
, vol.30
, Issue.11
, pp. 2573-2586
-
-
Chu, C.H.1
Shih, W.L.2
-
11
-
-
84993090888
-
An exploratory analysis in applying lean manufacturing to a labor-intensive industry in China
-
Comm, C.L. and Mathaisel, D.F.X. (2005), "An exploratory analysis in applying lean manufacturing to a labor-intensive industry in China", Asia Pacific Journal of Marketing and Logistics, Vol. 17 No. 4, pp. 63-80.
-
(2005)
Asia Pacific Journal of Marketing and Logistics
, vol.17
, Issue.4
, pp. 63-80
-
-
Comm, C.L.1
Mathaisel, D.F.X.2
-
12
-
-
0142043414
-
Implementing lean in aerospace - challenging the assumptions and understating the challenges
-
Crute, V., Ward, Y., Brown, S. and Graves, A. (2003), "Implementing lean in aerospace - challenging the assumptions and understating the challenges", Technovation, Vol. 23 No. 12, pp. 917-28.
-
(2003)
Technovation
, vol.23
, Issue.12
, pp. 917-928
-
-
Crute, V.1
Ward, Y.2
Brown, S.3
Graves, A.4
-
13
-
-
72249094451
-
-
unpublished Masters thesis, Oregon State University, Corvallis, OR, available at: (accessed 11 June 2008)
-
Czabke, J. (2007), "Lean thinking in the secondary wood products industry: Challenges and benefits", unpublished Masters thesis, Oregon State University, Corvallis, OR, available at: Https://ir.library.oregonstate. edu/dspace/handle/1957/4259 (accessed 11 June 2008).
-
(2007)
Lean Thinking in the Secondary Wood Products Industry: Challenges and Benefits
-
-
Czabke, J.1
-
15
-
-
0034427904
-
Applications of business process simulation and lean techniques in British Telecommunications PLC
-
in Joines, J.A., Barton, R.R., Kang, K. and Fishwick, P.A. (Eds) Orlando, FL, USA, 10-13 December 2015-21, available at: (accessed 20 December 2007)
-
Dennis, S., King, B., Hind, M. and Robinson, S. (2000), "Applications of business process simulation and lean techniques in British Telecommunications PLC", in Joines, J.A., Barton, R.R., Kang, K. and Fishwick, P.A. (Eds), Proceedings of the 2000 Winter Simulation Conference, Orlando, FL, USA, 10-13 December, pp. 2015-21, available at: Www.informs-cs.org/wsc00papers/276.PDF (accessed 20 December 2007).
-
(2000)
Proceedings of the 2000 Winter Simulation Conference
-
-
Dennis, S.1
King, B.2
Hind, M.3
Robinson, S.4
-
16
-
-
0034688387
-
Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
-
DOI 10.1080/002075400189509
-
Detty, R.B. and Yingling, J.C. (2000), "Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study", International Journal of Production Research, Vol. 38 No. 2, pp. 429-45. (Pubitemid 35395485)
-
(2000)
International Journal of Production Research
, vol.38
, Issue.2
, pp. 429-445
-
-
Detty, R.B.1
Yingling, J.C.2
-
17
-
-
59349103651
-
Applying Lean Thinking: A Case Study of an Indian Steel Plant
-
DOI 10.1080/13675560412331298491
-
Dhandapani, V., Potter, A. and Naim, M. (2004), "Applying lean thinking: A case study of an Indian steel plant", International Journal of Logistics: Research and Applications, Vol. 7 No. 3, pp. 239-50. (Pubitemid 39447475)
-
(2004)
INTERNATIONAL JOURNAL OF LOGISTICS
, vol.7
, Issue.3
, pp. 239-250
-
-
Dhandapani, V.1
Potter, A.2
Naim, M.3
-
18
-
-
34247111842
-
Materials flow improvement in a lean assembly line: A case study
-
DOI 10.1108/01445150710733379, Micro Assembly and High Speed Assembly
-
Domingo, R., Alvarez, R., Pena, M.M. and Calvo, R. (2007), "Materials flow improvement in a lean assembly line: A case study", Assembly Automation, Vol. 27 No. 2, pp. 141-7. (Pubitemid 46592571)
-
(2007)
Assembly Automation
, vol.27
, Issue.2
, pp. 141-147
-
-
Domingo, R.1
Alvarez, R.2
Pena, M.M.3
Calvo, R.4
-
19
-
-
49749153455
-
Measuring manufacturing throughput using takt time analysis and simulation
-
in Henderson, S.G., Biller, B., Hsieh, M.-H., Shortle, J., Tew, J.D and Barton, R.R. (Eds) Washington, DC, USA, 9-12 December
-
Duanmu, J. and Taaffe, K. (2007), "Measuring manufacturing throughput using takt time analysis and simulation", in Henderson, S.G., Biller, B., Hsieh, M.-H., Shortle, J., Tew, J.D. and Barton, R.R. (Eds), Proceedings of the 39th Winter Simulation Conference, Washington, DC, USA, 9-12 December pp. 1633-1640.
-
(2007)
Proceedings of the 39th Winter Simulation Conference
, pp. 1633-1640
-
-
Duanmu, J.1
Taaffe, K.2
-
21
-
-
34547766023
-
The application of lean manufacturing in a mining environment
-
Melbourne, Australia, 6-18 October 145-57, available at: (accessed 2 February 2008)
-
Dunstan, K., Lavin, B. and Sanford, R. (2006), "The application of lean manufacturing in a mining environment", Proceedings of the International Mine Management Conference, Melbourne, Australia, 6-18 October, pp. 145-57, available at: Www.leanmining.com.au/Dunstan.pdf (accessed 2 February 2008).
-
(2006)
Proceedings of the International Mine Management Conference
-
-
Dunstan, K.1
Lavin, B.2
Sanford, R.3
-
22
-
-
84992933790
-
Using value-stream maps to improve leadership
-
Emiliani, M.L. and Stec, D.J. (2004), "Using value-stream maps to improve leadership", The Leadership and Organisation Development Journal, Vol. 25 No. 8, pp. 622-45.
-
(2004)
The Leadership and Organisation Development Journal
, vol.25
, Issue.8
, pp. 622-645
-
-
Emiliani, M.L.1
Stec, D.J.2
-
23
-
-
33646478844
-
Creating a lean
-
April 34-8, available at: (accessed 3 January 2009)
-
Endsley, S., Magill, M.K. and Godfrey, M.M. (2006), "Creating a lean", Family Practice Management, April, pp. 34-8, available at: Www.aafp.org/fpm (accessed 3 January 2009).
-
(2006)
Family Practice Management
-
-
Endsley, S.1
Magill, M.K.2
Godfrey, M.M.3
-
24
-
-
13944263231
-
Achieving lean design process: Improvement methodology
-
DOI 10.1061/(ASCE)0733-9364(2002)128:3(248)
-
Freire, J. and Alarcón, L.F. (2002), "Achieving lean design process: Improvement methodology", Journal of Construction Engineering and Management, Vol. 128 No. 3, pp. 248-56. (Pubitemid 40265550)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.3
, pp. 248-256
-
-
Freire, J.1
Alarcon, L.F.2
-
25
-
-
70449880899
-
-
unpublished Master's thesis, North Carolina State University, Raleigh, NC, available at: (accessed 10 June 2008)
-
Goforth, K.A. (2007), "Adapting lean manufacturing principles to the textile industry", unpublished Master's thesis, North Carolina State University, Raleigh, NC, available at: Www.lib.ncsu.edu/theses/available/etd- 03212007-230809/(accessed 10 June 2008).
-
(2007)
Adapting Lean Manufacturing Principles to the Textile Industry
-
-
Goforth, K.A.1
-
26
-
-
51249083484
-
An initiative to implement lean manufacturing using value stream mapping in a small company
-
Grewal, C. (2008), "An initiative to implement lean manufacturing using value stream mapping in a small company", International Journal of Manufacturing Technology and Management, Vol. 15 Nos 3/4, pp. 404-17.
-
(2008)
International Journal of Manufacturing Technology and Management
, vol.15
, Issue.3-4
, pp. 404-417
-
-
Grewal, C.1
-
27
-
-
33745946072
-
Benchmarking performance measurement and lean manufacturing in the rough mill
-
Gumbo, D., Kline, D.E. and Bumgardner, M.S. (2006), "Benchmarking performance measurement and lean manufacturing in the rough mill", Forest Products Journal, Vol. 56 No. 6, pp. 25-30. (Pubitemid 44059295)
-
(2006)
Forest Products Journal
, vol.56
, Issue.6
, pp. 25-30
-
-
Cumbo, D.1
Kline, D.E.2
Bumgardner, M.S.3
-
28
-
-
0031165161
-
Implementation of just-in-time in a small company: A case study
-
Gunasekaran, A. and Lyu, J. (1997), "Implementation of just-in-time in a small company: A case study", Production Planning & Control, Vol. 8 No. 4, pp. 406-12. (Pubitemid 127647932)
-
(1997)
Production Planning and Control
, vol.8
, Issue.4
, pp. 406-412
-
-
Gunasekaran, A.1
Lyu, J.2
-
29
-
-
3543140598
-
Improving operations performance in a small company: A case study
-
Gunasekaran, A., Forker, L. and Kobu, B. (2000), "Improving operations performance in a small company: A case study", International Journal of Operations & Production Management, Vol. 20 No. 3, pp. 316-35.
-
(2000)
International Journal of Operations & Production Management
, vol.20
, Issue.3
, pp. 316-335
-
-
Gunasekaran, A.1
Forker, L.2
Kobu, B.3
-
30
-
-
0029344054
-
Implementation of just-in-time methodology in a small company
-
Gupta, S.M. and Brennan, L. (1995), "Implementation of just-in-time methodology in a small company", Production Planning & Control, Vol. 6 No. 4, pp. 358-64.
-
(1995)
Production Planning & Control
, vol.6
, Issue.4
, pp. 358-364
-
-
Gupta, S.M.1
Brennan, L.2
-
31
-
-
3543108498
-
The seven value stream mapping tools
-
Hines, P. and Rich, N. (1997), "The seven value stream mapping tools", International Journal of Operations & Production Management, Vol. 17 Nos 1/2, pp. 46-64.
-
(1997)
International Journal of Operations & Production Management
, vol.17
, Issue.1-2
, pp. 46-64
-
-
Hines, P.1
Rich, N.2
-
32
-
-
84986180505
-
Value stream mapping: A distribution industry application
-
Hines, P., Rich, N. and Esain, A. (1999), "Value stream mapping: A distribution industry application", Benchmarking: An International Journal, Vol. 6 No. 1, pp. 60-77.
-
(1999)
Benchmarking: An International Journal
, vol.6
, Issue.1
, pp. 60-77
-
-
Hines, P.1
Rich, N.2
Esain, A.3
-
33
-
-
27744511487
-
A novel approach to lean control for Taiwan-funded enterprises in mainland China
-
Huang, C.C. and Liu, S.H. (2005), "A novel approach to lean control for Taiwan-funded enterprises in mainland China", International Journal of Production Research, Vol. 43 No. 12, pp. 2553-75.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.12
, pp. 2553-2575
-
-
Huang, C.C.1
Liu, S.H.2
-
34
-
-
0002900917
-
Applying lean principles for high product variety and low volumes: some issues and propositions
-
Jina, J., Bhattacharya, A.K. and Walton, A.D. (1997), "Applying lean principles for high product variety and low volumes: Some issues and propositions", Logistics Information Management, Vol. 10 No. 1, pp. 5-13. (Pubitemid 127036652)
-
(1997)
Logistics information management
, vol.10
, Issue.1
, pp. 5-13
-
-
Jina, J.1
Bhattacharya, A.K.2
Walton, A.D.3
-
35
-
-
84991231900
-
-
available at: (accessed 4 January 2009)
-
Kannan, S., Li, Y., Ahmed, N. and El-Akkad, Z. (2007), "Developing maintenance value stream map", available at: Http://iienet.org/ uploadedFiles/IIE/Community/Technical-Societies-and-Divisions/Lean/ Lean-details-pages/Kannan4-07.pdf (accessed 4 January 2009).
-
(2007)
Developing Maintenance Value Stream Map
-
-
Kannan, S.1
Li, Y.2
Ahmed, N.3
El-Akkad, Z.4
-
36
-
-
3543059446
-
A lean and global smaller firm?
-
Karlsson, C. and Åhlström, P. (1997), "A lean and global smaller firm?", International Journal of Operations & Production Management, Vol. 17 No. 10, pp. 940-52.
-
(1997)
International Journal of Operations & Production Management
, vol.17
, Issue.10
, pp. 940-952
-
-
Karlsson, C.1
Ahlström, P.2
-
37
-
-
0031360395
-
Successful implementation of TPS in a manufacturing setting: A case study
-
Kasul, R.A. and Motwani, J.G. (1997), "Successful implementation of TPS in a manufacturing setting: A case study", Industrial Management & Data Systems, Vol. 97 No. 7, pp. 274-9. (Pubitemid 127489200)
-
(1997)
Industrial Management and Data Systems
, vol.97
, Issue.7
, pp. 274-279
-
-
Kasul, R.A.1
Motwani, J.G.2
-
38
-
-
33745604543
-
Implementing the lean sigma framework in an Indian SME: A case study
-
DOI 10.1080/09537280500483350, PII J178260017826
-
Kumar, M., Antony, J., Singh, R.K., Tiwari, M.K. and Perry, D. (2006), "Implementing the lean sigma framework in an Indian SME: A case study", Production Planning & Control, Vol. 17 No. 4, pp. 407-23. (Pubitemid 43982714)
-
(2006)
Production Planning and Control
, vol.17
, Issue.4
, pp. 407-423
-
-
Kumar, M.1
Antony, J.2
Singh, R.K.3
Tiwari, M.K.4
Perry, D.5
-
39
-
-
38949202993
-
An evaluation of the value stream mapping tool
-
Lasa, I.S., Laburu, C.O. and Vila, R.C. (2008), "An evaluation of the value stream mapping tool", Business Process Management Journal, Vol. 14 No. 1, pp. 39-52.
-
(2008)
Business Process Management Journal
, vol.14
, Issue.1
, pp. 39-52
-
-
Lasa, I.S.1
Laburu, C.O.2
Vila, R.C.3
-
40
-
-
34547371574
-
The mutation of the Toyota production system: Adapting the TPS at Hyundai Motor Company
-
Lee, B.H. and Jo, H.J. (2007), "The mutation of the Toyota production system: Adapting the TPS at Hyundai Motor Company", International Journal of Production Research, Vol. 45 No. 16, pp. 3665-79.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.16
, pp. 3665-3679
-
-
Lee, B.H.1
Jo, H.J.2
-
41
-
-
0345759911
-
Lean manufacturing in temperature dependent processes with interruptions
-
Lee, W.L. and Allwood, J.M. (2003), "Lean manufacturing in temperature dependent processes with interruptions", International Journal of Operations Management, Vol. 23 No. 11, pp. 1377-400. (Pubitemid 38037947)
-
(2003)
International Journal of Operations and Production Management
, vol.23
, Issue.11-12
, pp. 1377-1400
-
-
Lee, W.L.1
Allwood, J.M.2
-
42
-
-
0008829825
-
Is just-in-time applicable in paper industry logistics?
-
DOI 10.1108/13598549810200906
-
Lehtonen, J.M. and Holmström, J. (1998), "Is just-in-time applicable in paper industry logistics?", Supply Chain Management, Vol. 3 No. 1, pp. 21-32. (Pubitemid 39034475)
-
(1998)
Supply Chain Management
, vol.3
, Issue.1
, pp. 21-32
-
-
Lehtonen, J.-M.1
Holmstrom, J.2
-
43
-
-
79955680430
-
An application of simulation and value stream mapping in lean manufacturing
-
in Verbraeck, A. and Krug, W. (Eds) Dresden, Germany, 23-26 October, available at: (accessed 13 January 2008)
-
Lian, Y. and Van Landeghem, H. (2002), "An application of simulation and value stream mapping in lean manufacturing", in Verbraeck, A. and Krug, W. (Eds), Proceedings 14th European Simulation Symposium: Simulation in Industry (ESS 2002), Dresden, Germany, 23-26 October, available at: Www.scs-europe.org/services/ess2002/PDF/log-11.pdf (accessed 13 January 2008).
-
(2002)
Proceedings 14th European Simulation Symposium: Simulation in Industry (ESS 2002)
-
-
Lian, Y.1
Van Landeghem, H.2
-
44
-
-
34249027911
-
Analysing the effects of lean manufacturing using a value stream mapping-based simulation generator
-
Lian, Y. and Van Landeghem, H. (2007), "Analysing the effects of lean manufacturing using a value stream mapping-based simulation generator", International Journal of Production Research, Vol. 45 No. 13, pp. 3037-58.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.13
, pp. 3037-358
-
-
Lian, Y.1
Van Landeghem, H.2
-
45
-
-
33751550932
-
Improving quality through value stream mapping: A case study of a physician's clinic
-
DOI 10.1080/14783360600748091, PII N034W47523553K16
-
Lummus, R.R., Vokurka, R.J. and Rodeghiero, B. (2006), "Improving quality through value stream mapping: A case study of a physician's clinic", Total Quality Management & Business Excellence, Vol. 17 No. 8, pp. 1063-75. (Pubitemid 44831475)
-
(2006)
Total Quality Management and Business Excellence
, vol.17
, Issue.8
, pp. 1063-1075
-
-
Lummus, R.R.1
Vokurka, R.J.2
Rodeghiero, B.3
-
46
-
-
33746857517
-
Utilising simulation to enhance value stream mapping: A manufacturing case application
-
McDonald, T., Van Aken, E.M. and Rentes, A.F. (2002), "Utilising simulation to enhance value stream mapping: A manufacturing case application", International Journal of Logistics: Research and Applications, Vol. 5 No. 2, pp. 213-32.
-
(2002)
International Journal of Logistics: Research and Applications
, vol.5
, Issue.2
, pp. 213-232
-
-
McDonald, T.1
Van Aken, E.M.2
Rentes, A.F.3
-
47
-
-
33744463206
-
Value stream analysis and mapping for product development
-
Toronto, Canada, 8-13 September 6103.1-6103.10, available at: (accessed 13 January 2008)
-
McManus, H.L. and Millard, R.L. (2002), "Value stream analysis and mapping for product development", Proceedings of the 23rd International Council of the Aeronautical Sciences (ICAS ) Congress, Toronto, Canada, 8-13 September, pp. 6103.1-6103.10, available at: Http://dspace.mit.edu/bitstream/ handle/1721.1/7333/Value%20Stream%20Analysis% 20and%20Mapping.pdf?sequence=1 (accessed 13 January 2008).
-
(2002)
Proceedings of the 23rd International Council of the Aeronautical Sciences (ICAS ) Congress
-
-
McManus, H.L.1
Millard, R.L.2
-
48
-
-
0030269737
-
Transformation to lean manufacturing by an automotive component supplier
-
Mabry, B.G. and Morrison, K.R. (1996), "Transformation to lean manufacturing by an automotive component supplier", Computers & Industrial Engineering, Vol. 31 Nos 1/2, pp. 95-8.
-
(1996)
Computers & Industrial Engineering
, vol.31
, Issue.1-2
, pp. 95-98
-
-
Mabry, B.G.1
Morrison, K.R.2
-
49
-
-
79955684533
-
Simulation-based value stream mapping
-
Mittelhuber, B., Löffler, B. and Langsdorff, P.V. (2002), "Simulation-based value stream mapping", Industrie-Management, Vol. 18 No. 1, pp. 44-7.
-
(2002)
Industrie-Management
, vol.18
, Issue.1
, pp. 44-47
-
-
Mittelhuber, B.1
Löffler, B.2
Langsdorff, P.V.3
-
50
-
-
66149165250
-
Implementation of lean manufacturing principles in auto industry
-
available at (accessed 10 April 2008)
-
Mohanty, R.P., Yadav, O.P. and Jain, R. (2007), "Implementation of lean manufacturing principles in auto industry", Vilakshan - XIMB Journal of Management, pp. 1-32, available at: Www. ximb.ac.in/ximb-journal/ Publications/Article-01.pdf (accessed 10 April 2008).
-
(2007)
Vilakshan - XIMB Journal of Management
, pp. 1-32
-
-
Mohanty, R.P.1
Yadav, O.P.2
Jain, R.3
-
51
-
-
0036990158
-
Introducing lean manufacturing at ESI
-
Mottershead, D. (2001), "Introducing lean manufacturing at ESI", Proceedings of the Portland International Conference on Management of Engineering and Technology (PICMET '01), Portland, OR, USA, 29 July-2 August, Vol. 1 p. 448.
-
(2001)
Proceedings of the Portland International Conference on Management of Engineering and Technology (PICMET '01), Portland, OR, USA, 29 July-2 August
, vol.1
, pp. 448
-
-
Mottershead, D.1
-
52
-
-
0042363456
-
A business process change framework for examining lean manufacturing: A case study
-
Motwani, J. (2003), "A business process change framework for examining lean manufacturing: A case study", Industrial Management & Data Systems, Vol. 103 No. 5, pp. 339-46.
-
(2003)
Industrial Management & Data Systems
, vol.103
, Issue.5
, pp. 339-346
-
-
Motwani, J.1
-
53
-
-
32144454745
-
Kanban implementation at a tyre manufacturing plant: A case study
-
DOI 10.1080/09537280500121778, PII N44640641051884
-
Mukhopadhyay, S.K. and Shanker, S. (2005), "Kanban implementation at a tyre manufacturing plant: A case study", Production Planning & Control, Vol. 16 No. 5, pp. 488-99. (Pubitemid 43203734)
-
(2005)
Production Planning and Control
, vol.16
, Issue.5
, pp. 488-499
-
-
Mukhopadhyay, S.K.1
Shanker, S.2
-
54
-
-
56149100847
-
Increasing the effectiveness of value stream mapping using simulation tools in engine test operations", in Wamkeue, R. (Ed.)
-
Montreal, Canada, 30 May-1 June, pp.
-
Narasimhan, J., Parthasarathy, L. and Narayan, P.S. (2007), "Increasing the effectiveness of value stream mapping using simulation tools in engine test operations", in Wamkeue, R. (Ed.), Proceedings of the 18th IASTED International Conference, Montreal, Canada, 30 May-1 June, pp. 260-4.
-
(2007)
Proceedings of the 18th IASTED International Conference
, pp. 260-264
-
-
Narasimhan, J.1
Parthasarathy, L.2
Narayan, P.S.3
-
55
-
-
72249121744
-
Responding to customer requirements with value stream mapping: An automotive industry application
-
Istanbul, Turkey, 19-22 June 1517-22, available at: (accessed 11 June 2008)
-
O ̈ zkan, K., Birgü n, S., Kiliçogullari, P. and Akman, G. (2005), "Responding to customer requirements with value stream mapping: An automotive industry application", Proceedings of the 35th International Conference on Computers & Industrial Engineering, Istanbul, Turkey, 19-22 June, pp. 1517-22, available at: Www.umoncton.ca/ cie/Conferences/35thconf/ CIE35%20Proceedings/PDF/309.pdf (accessed 11 June 2008).
-
(2005)
Proceedings of the 35th International Conference on Computers & Industrial Engineering
-
-
Özkan, K.1
Birgün, S.2
Kiliçogullari, P.3
Akman, G.4
-
56
-
-
31444438368
-
Application of lean visual process management tools
-
DOI 10.1080/09537280500414991, PII R369231828403338
-
Parry, G.C. and Turner, C.E. (2006), "Application of lean visual process management tools", Production Planning & Control, Vol. 17 No. 1, pp. 77-86. (Pubitemid 43149088)
-
(2006)
Production Planning and Control
, vol.17
, Issue.1
, pp. 77-86
-
-
Parry, G.C.1
Turner, C.E.2
-
57
-
-
0004277453
-
-
Brookline, MA
-
Rother, M. and Shook, J. (1999), Learning to See, Lean Enterprise Institute Inc., Brookline, MA.
-
(1999)
Learning to See, Lean Enterprise Institute Inc.
-
-
Rother, M.1
Shook, J.2
-
58
-
-
43449129498
-
Lean philosophy: Implementation in a forging company
-
DOI 10.1007/s00170-006-0870-2
-
Sahoo, A.K., Singh, N.K., Shankar, R. and Tiwari, M.K. (2008), "Lean philosophy: Implementation in a forging company", International Journal of Advanced Manufacturing Technology, Vol. 36 Nos 5/6, pp. 451-62. (Pubitemid 351665134)
-
(2008)
International Journal of Advanced Manufacturing Technology
, vol.36
, Issue.5-6
, pp. 451-462
-
-
Sahoo, A.K.1
Singh, N.K.2
Shankar, R.3
Tiwari, M.K.4
-
59
-
-
4344717123
-
Simulation as a tool in understanding the concepts of lean manufacturing
-
Schroer, B.J. (2004), "Simulation as a tool in understanding the concepts of lean manufacturing", Simulation, Vol. 80 No. 3, pp. 171-5.
-
(2004)
Simulation
, vol.80
, Issue.3
, pp. 171-175
-
-
Schroer, B.J.1
-
60
-
-
85072481715
-
Applying lean principles in a test laboratory environment
-
Detroit, MI, USA 11-14 April, Paper No. 2005-01-1051, available at: (accessed 4 January 2009)
-
Schulte, K.M., Paruchuri, M.R. and Patel, J.B. (2005), "Applying lean principles in a test laboratory environment", Proceedings of the SAE World Congress, Detroit, MI, USA, 11-14 April, Paper No. 2005-01-1051, available at: Www.sae.org (accessed 4 January 2009).
-
(2005)
Proceedings of the SAE World Congress
-
-
Schulte, K.M.1
Paruchuri, M.R.2
Patel, J.B.3
-
61
-
-
67649148373
-
Lean conversion and Genba Shikumi
-
Durham, UK, 9-11 July 168-71
-
Scott, N.A. (2007), "Lean conversion and Genba Shikumi", Proceedings of the IET International Conference on Agile Manufacturing (ICAM 2007 ), Durham, UK, 9-11 July, pp. 168-71.
-
(2007)
Proceedings of the IET International Conference on Agile Manufacturing (ICAM 2007 )
-
-
Scott, N.A.1
-
62
-
-
46649112970
-
Evaluation of value stream mapping in manufacturing system redesign
-
Serrano, I., Ochoa, C. and De Castro, R. (2008), "Evaluation of value stream mapping in manufacturing system redesign", International Journal of Production Research, Vol. 46 No. 16, pp. 4409-30.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.16
, pp. 4409-4430
-
-
Serrano, I.1
Ochoa, C.2
De Castro, R.3
-
63
-
-
27844589388
-
Application of value stream mapping for lean operations and cycle time reduction: An Indian case study
-
DOI 10.1080/09537280512331325281
-
Seth, D. and Gupta, V. (2005), "Application of value stream mapping for lean operations and cycle time reduction: An Indian case study", Production Planning & Control, Vol. 16 No. 1, pp. 44-59. (Pubitemid 41647053)
-
(2005)
Production Planning and Control
, vol.16
, Issue.1
, pp. 44-59
-
-
Seth, D.1
Gupta, V.2
-
64
-
-
0442294066
-
Quality issues in lean production implementation: A case study of a French automotive supplier
-
Soderquist, K. and Motwani, J. (1999), "Quality issues in lean production implementation: A case study of a French automotive supplier", Total Quality Management & Business Excellence, Vol. 10 No. 8, pp. 1107-22.
-
(1999)
Total Quality Management & Business Excellence
, vol.10
, Issue.8
, pp. 1107-1122
-
-
Soderquist, K.1
Motwani, J.2
-
65
-
-
0030539014
-
Developing a lean production organization: An Australian case study
-
Sohal, A.S. (1996), "Developing a lean production organization: An Australian case study", International Journal of Operations & Production Management, Vol. 16 No. 2, pp. 91-102.
-
(1996)
International Journal of Operations & Production Management
, vol.16
, Issue.2
, pp. 91-102
-
-
Sohal, A.S.1
-
66
-
-
85073127052
-
Can lean manufacturing be applied to university laboratories?
-
Honululu, HI,USA, Paper No.:AC 2007-273, available at: (accessed 11 June 2008)
-
Sreedharan, S. and Liou, F. (2007), "Can lean manufacturing be applied to university laboratories?", Proceedings of the 2007 American Society for Engineering Education Annual Conference & Exposition,Honululu, HI,USA, Paper No.:AC 2007-273, available at: Www.icee.usm.edu/ICEE/ conferences/asee2007/papers/273-CAN-LEAN-MANUFACTURING-BE-APPLIED-TO-UNI.pdf (accessed 11 June 2008).
-
(2007)
Proceedings of the 2007 American Society for Engineering Education Annual Conference & Exposition
-
-
Sreedharan, S.1
Liou, F.2
-
68
-
-
0033097214
-
Improving flow to achieve lean manufacturing in shipbuilding
-
Storch, R.L. and Lim, S. (1999), "Improving flow to achieve lean manufacturing in shipbuilding", Production Planning & Control, Vol. 10 No. 2, pp. 127-37.
-
(1999)
Production Planning & Control
, vol.10
, Issue.2
, pp. 127-137
-
-
Storch, R.L.1
Lim, S.2
-
69
-
-
28344437665
-
Value chain analysis: An approach to supply chain improvement in agri-food chains
-
DOI 10.1108/09600030510634599
-
Taylor, D.H. (2005), "Value chain analysis: An approach to supply chain improvement in agri-food chains", International Journal of Physical Distribution & Logistics Management, Vol. 35 No. 10, pp. 744-61. (Pubitemid 41720853)
-
(2005)
International Journal of Physical Distribution and Logistics Management
, vol.35
, Issue.10
, pp. 744-761
-
-
Taylor, D.H.1
-
70
-
-
4444237159
-
Innovation and hybridization: Managing the introduction of lean production into Volvo do Brazil
-
DOI 10.1108/01443570410548239
-
Wallace, T. (2004), "Innovation and hybridization: Managing the introduction of lean production into Volvo do Brazil", International Journal of Operations Management, Vol. 24 No. 8, pp. 801-19. (Pubitemid 39182200)
-
(2004)
International Journal of Operations and Production Management
, vol.24
, Issue.8
, pp. 801-819
-
-
Wallace, T.1
-
71
-
-
0004012172
-
-
Simon & Schuster, New York, NY
-
Womack, J.P. and Jones, D.T. (1996), Lean Thinking: Banish Waste and Create Wealth in Your Corporation, Simon & Schuster, New York, NY.
-
(1996)
Lean Thinking: Banish Waste and Create Wealth in Your Corporation
-
-
Womack, J.P.1
Jones, D.T.2
|