메뉴 건너뛰기




Volumn 8, Issue , 2008, Pages 321-344

Maintenance and Production: A Review of Planning Models

Author keywords

[No Author keywords available]

Indexed keywords

INDUSTRIAL ENGINEERING;

EID: 84890598992     PISSN: 16147839     EISSN: 2196999X     Source Type: Book Series    
DOI: 10.1007/978-1-84800-011-7_13     Document Type: Chapter
Times cited : (71)

References (88)
  • 3
    • 0021850598 scopus 로고
    • The determination of maintenance strategies for plants subject to breakdown
    • Bäckert W, Rippin D, (1985) The determination of maintenance strategies for plants subject to breakdown. Computers and Chemical Engineering 9(2): 113-126.
    • (1985) Computers and Chemical Engineering , vol.9 , Issue.2 , pp. 113-126
    • Bäckert, W.1    Rippin, D.2
  • 4
    • 0032138493 scopus 로고    scopus 로고
    • Integrated production and quality model under various preventive maintenance policies
    • Ben-Daya M, Makhdoum M, (1998) Integrated production and quality model under various preventive maintenance policies. Journal of the Operational Research Society 49(8): 840-853.
    • (1998) Journal of the Operational Research Society , vol.49 , Issue.8 , pp. 840-853
    • Ben-Daya, M.1    Makhdoum, M.2
  • 5
    • 0006440513 scopus 로고    scopus 로고
    • Integrated production, quality & maintenance models: An overview
    • M. Rahim and M. Ben-Daya (eds), Kluwer Academic Publishers
    • Ben-Daya M, Rahim M, (2001) Integrated production, quality & maintenance models: an overview. in M. Rahim and M. Ben-Daya (eds), Integrated models in production planning, inventory, quality, and maintenance, Kluwer Academic Publishers, 3-28.
    • (2001) Integrated models in production planning, inventory, quality, and maintenance , pp. 3-28
    • Ben-Daya, M.1    Rahim, M.2
  • 6
    • 0028401236 scopus 로고
    • Telecommunications systems maintenance
    • Bengü G, (1994) Telecommunications systems maintenance. Computers and Operations Research 21: 337-351.
    • (1994) Computers and Operations Research , vol.21 , pp. 337-351
    • Bengü, G.1
  • 9
    • 0037445888 scopus 로고    scopus 로고
    • Optimization of preventive maintenance strategies in a multipurpose batch plant: Application to semiconductor manufacturing
    • Charles A, Floru I, Azzaro-Pantel C, Pibouleau L, Domenech S, (2003) Optimization of preventive maintenance strategies in a multipurpose batch plant: application to semiconductor manufacturing. Computers and Chemical Engineering 27: 449-467.
    • (2003) Computers and Chemical Engineering , vol.27 , pp. 449-467
    • Charles, A.1    Floru, I.2    Azzaro-Pantel, C.3    Pibouleau, L.4    Domenech, S.5
  • 10
    • 1642603342 scopus 로고    scopus 로고
    • Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance
    • Chelbi A, Ait-Kadi D, (2004) Analysis of a production/inventory system with randomly failing production unit submitted to regular preventive maintenance. European Journal of Operational Research 156: 712-718.
    • (2004) European Journal of Operational Research , vol.156 , pp. 712-718
    • Chelbi, A.1    Ait-Kadi, D.2
  • 11
    • 0033204515 scopus 로고    scopus 로고
    • Railway track possession assignment using constraint satisfaction
    • Cheung B, Chow K, Hui L, Yong A, (1999) Railway track possession assignment using constraint satisfaction. Engineering Applications of AI 12(5): 599-611.
    • (1999) Engineering Applications of AI , vol.12 , Issue.5 , pp. 599-611
    • Cheung, B.1    Chow, K.2    Hui, L.3    Yong, A.4
  • 14
    • 0037954442 scopus 로고    scopus 로고
    • Approximations to production lot sizing with machine breakdowns
    • Chung K, (2003) Approximations to production lot sizing with machine breakdowns. Computers & Operations Research 30: 1499-1507.
    • (2003) Computers & Operations Research , vol.30 , pp. 1499-1507
    • Chung, K.1
  • 15
    • 1142296776 scopus 로고
    • Modeling aircraft repair turntime: Simulation supports maintenance marketing
    • Cobb R, (1995) Modeling aircraft repair turntime: simulation supports maintenance marketing. Journal of Air Transport Management 2: 25-32.
    • (1995) Journal of Air Transport Management , vol.2 , pp. 25-32
    • Cobb, R.1
  • 16
    • 0346517229 scopus 로고    scopus 로고
    • Improving crew scheduling by incorporating key maintenance routing decisions
    • Cohn A, Barnhart C, (2003) Improving crew scheduling by incorporating key maintenance routing decisions. Operations Research 51(3): 387-396.
    • (2003) Operations Research , vol.51 , Issue.3 , pp. 387-396
    • Cohn, A.1    Barnhart, C.2
  • 17
    • 0030285780 scopus 로고    scopus 로고
    • A maintenance model with opportunities and interrupt replacement options
    • Dagpunar J, (1996) A maintenance model with opportunities and interrupt replacement options. Journal of the Operational Research Society 47: 1406-1409.
    • (1996) Journal of the Operational Research Society , vol.47 , pp. 1406-1409
    • Dagpunar, J.1
  • 18
    • 0032683886 scopus 로고    scopus 로고
    • Optimal preventive maintenance in a production inventory
    • Das T, Sarkar S, (1999) Optimal preventive maintenance in a production inventory. IIE Transactions 31: 537-551.
    • (1999) IIE Transactions , vol.31 , pp. 537-551
    • Das, T.1    Sarkar, S.2
  • 19
    • 0029236976 scopus 로고
    • Preventive maintenance policy optimisation for multipurpose plant equipment
    • Dedopoulos L, Shah N, (1995) Preventive maintenance policy optimisation for multipurpose plant equipment. Computers and Chemical Engineering 19: 693-698.
    • (1995) Computers and Chemical Engineering , vol.19 , pp. 693-698
    • Dedopoulos, L.1    Shah, N.2
  • 20
    • 84866711131 scopus 로고    scopus 로고
    • An overview of techniques used in planning railway infrastructure maintenance
    • Geraerds W, Sherwin D, (eds), Vaxjo University, Sweden
    • Dekker R, Budai G, (2002) An overview of techniques used in planning railway infrastructure maintenance. In Geraerds W, Sherwin D, (eds), Proceedings of IFRIMmmm (maintenance management and modelling) conference, Vaxjo University, Sweden, 1-8.
    • (2002) Proceedings of IFRIMmmm (maintenance management and modelling) conference , pp. 1-8
    • Dekker, R.1    Budai, G.2
  • 21
    • 84989678878 scopus 로고
    • Opportunity-based age replacement: Exponentially distributed times between opportunities
    • Dekker R, Dijkstra M, (1992) Opportunity-based age replacement: exponentially distributed times between opportunities. Naval Research Logistics 39: 175-190.
    • (1992) Naval Research Logistics , vol.39 , pp. 175-190
    • Dekker, R.1    Dijkstra, M.2
  • 22
    • 0035250227 scopus 로고    scopus 로고
    • Multi-parameter maintenance optimisation via the marginal cost approach
    • Dekker R, Plasmeijer R, (2001) Multi-parameter maintenance optimisation via the marginal cost approach. Journal of the Operational Research Society 52: 188-197.
    • (2001) Journal of the Operational Research Society , vol.52 , pp. 188-197
    • Dekker, R.1    Plasmeijer, R.2
  • 24
    • 0028406505 scopus 로고
    • Preventive maintenance at opportunities of restricted duration
    • Dekker R, Smeitink E, (1994) Preventive maintenance at opportunities of restricted duration. Naval Research Logistics 41: 335-353.
    • (1994) Naval Research Logistics , vol.41 , pp. 335-353
    • Dekker, R.1    Smeitink, E.2
  • 30
    • 0036812375 scopus 로고    scopus 로고
    • Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry
    • Edwards D, Holt G, Harris F, (2002) Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry. Construction Management & Economics 20: 581-591.
    • (2002) Construction Management & Economics , vol.20 , pp. 581-591
    • Edwards, D.1    Holt, G.2    Harris, F.3
  • 31
    • 0004108768 scopus 로고    scopus 로고
    • MRT-Productions, Zaltbommel, The Netherlands
    • Esveld C, (2001) Modern Railway Track. MRT-Productions, Zaltbommel, The Netherlands.
    • (2001) Modern Railway Track
    • Esveld, C.1
  • 32
    • 0000627315 scopus 로고
    • Flight scheduling and maintenance base planning
    • Feo T, Bard J, (1989) Flight scheduling and maintenance base planning. Management Science 35(12): 1415-1432.
    • (1989) Management Science , vol.35 , Issue.12 , pp. 1415-1432
    • Feo, T.1    Bard, J.2
  • 33
    • 38249040216 scopus 로고
    • Developing maintenance craft labor efficiency through an integrated planning and control system: A prescriptive model
    • Finch B, Gilbert J, (1986) Developing maintenance craft labor efficiency through an integrated planning and control system: a prescriptive model. Journal of Operations Management 6(4): 449-459.
    • (1986) Journal of Operations Management , vol.6 , Issue.4 , pp. 449-459
    • Finch, B.1    Gilbert, J.2
  • 34
    • 52149084039 scopus 로고    scopus 로고
    • Optimizing with constraints: A case study in scheduling maintenance of electric power units
    • Frost D, Dechter R, (1998) Optimizing with constraints: a case study in scheduling maintenance of electric power units. Lecture Notes in Computer Science 1520: 469-488.
    • (1998) Lecture Notes in Computer Science , vol.1520 , pp. 469-488
    • Frost, D.1    Dechter, R.2
  • 35
    • 0022026157 scopus 로고
    • The cost of downtime for maintenance: Preliminary considerations
    • Geraerds W, (1985) The cost of downtime for maintenance: preliminary considerations. Maintenance Management International 5: 13-21.
    • (1985) Maintenance Management International , vol.5 , pp. 13-21
    • Geraerds, W.1
  • 36
    • 0033737583 scopus 로고    scopus 로고
    • Production and preventive maintenance rates control for a manufacturing system: An experimental design approach
    • Gharbi A, Kenne J, (2000) Production and preventive maintenance rates control for a manufacturing system: an experimental design approach. International Journal of Production Economics 65: 275-287.
    • (2000) International Journal of Production Economics , vol.65 , pp. 275-287
    • Gharbi, A.1    Kenne, J.2
  • 37
    • 15344350551 scopus 로고    scopus 로고
    • Maintenance scheduling and production control of multiplemachine manufacturing systems
    • Gharbi A, Kenne J, (2005) Maintenance scheduling and production control of multiplemachine manufacturing systems. Computers and Industrial Engineering 48: 693-707.
    • (2005) Computers and Industrial Engineering , vol.48 , pp. 693-707
    • Gharbi, A.1    Kenne, J.2
  • 38
    • 0142075392 scopus 로고    scopus 로고
    • Integrated optimal reliable design, production, and maintenance planning for multipurpose process plant
    • Goel H, Grievink J, Weijnen M, (2003) Integrated optimal reliable design, production, and maintenance planning for multipurpose process plant. Computers and Chemical Engineering 27: 1543-1555.
    • (2003) Computers and Chemical Engineering , vol.27 , pp. 1543-1555
    • Goel, H.1    Grievink, J.2    Weijnen, M.3
  • 39
    • 0032364078 scopus 로고    scopus 로고
    • Mathematical models in airline schedule planning: A survey
    • Gopalan R, Talluri K, (1998) Mathematical models in airline schedule planning: a survey. Annals of Operations Research 76(1): 155-185.
    • (1998) Annals of Operations Research , vol.76 , Issue.1 , pp. 155-185
    • Gopalan, R.1    Talluri, K.2
  • 40
    • 0026927270 scopus 로고
    • Production batching with machine breakdowns and safety stocks
    • Groenevelt H, Pintelon L, Seidmann A, (1992a) Production batching with machine breakdowns and safety stocks. Operations Research 40(5): 959-971.
    • (1992) Operations Research , vol.40 , Issue.5 , pp. 959-971
    • Groenevelt, H.1    Pintelon, L.2    Seidmann, A.3
  • 41
  • 42
    • 0036604877 scopus 로고    scopus 로고
    • Bus maintenance systems and maintenance scheduling: Model formulations and solutions
    • Haghani A, Shafahi Y, (2002) Bus maintenance systems and maintenance scheduling: model formulations and solutions. Transportation Research Part A 36: 453-482.
    • (2002) Transportation Research Part A , vol.36 , pp. 453-482
    • Haghani, A.1    Shafahi, Y.2
  • 43
    • 0032187645 scopus 로고    scopus 로고
    • Scheduling of railway maintenance activities and crews
    • Higgins A, (1998) Scheduling of railway maintenance activities and crews. Journal of the Operational Research Society 49: 1026-1033.
    • (1998) Journal of the Operational Research Society , vol.49 , pp. 1026-1033
    • Higgins, A.1
  • 44
    • 84951819079 scopus 로고    scopus 로고
    • (accessed September 26, 2006)
    • Improverail (2002) http://www. tis. pt/proj/improverail/downloads/d6final. pdf (accessed September 26, 2006).
    • (2002) Improverail
  • 45
    • 0036568125 scopus 로고    scopus 로고
    • Integrated maintenance and production control of a deteriorating production system
    • Iravani S, Duenyas I, (2002) Integrated maintenance and production control of a deteriorating production system. IIE Transactions 34: 423-435.
    • (2002) IIE Transactions , vol.34 , pp. 423-435
    • Iravani, S.1    Duenyas, I.2
  • 46
    • 0037278646 scopus 로고    scopus 로고
    • Hierarchical control of production and maintenance rates in manufacturing systems
    • Kenne J, Boukas E, (2003) Hierarchical control of production and maintenance rates in manufacturing systems. Journal of Quality in Maintenance Engineering 9: 66-82.
    • (2003) Journal of Quality in Maintenance Engineering , vol.9 , pp. 66-82
    • Kenne, J.1    Boukas, E.2
  • 47
    • 0141504179 scopus 로고    scopus 로고
    • Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system
    • Kenne J, Boukas E, Gharbi A, (2003) Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system. Mathematical and Computer Modelling 38: 351-365.
    • (2003) Mathematical and Computer Modelling , vol.38 , pp. 351-365
    • Kenne, J.1    Boukas, E.2    Gharbi, A.3
  • 48
    • 33750995575 scopus 로고    scopus 로고
    • Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale
    • Kenne J, Gharbi A, Beit M, (2006) Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale. Accepted for publication in European Journal of Operational Research 178(2): 408-420.
    • (2006) Accepted for publication in European Journal of Operational Research , vol.178 , Issue.2 , pp. 408-420
    • Kenne, J.1    Gharbi, A.2    Beit, M.3
  • 49
    • 27144508398 scopus 로고    scopus 로고
    • A numerical method to approximate optimal production and maintenance plan in a flexible manufacturing system
    • Kianfar F, (2005) A numerical method to approximate optimal production and maintenance plan in a flexible manufacturing system. Applied Mathematics and Computation 170: 924-940.
    • (2005) Applied Mathematics and Computation , vol.170 , pp. 924-940
    • Kianfar, F.1
  • 51
    • 0023996604 scopus 로고
    • Optimal preventive maintenance scheduling of thermal generating units in power systems-a survey of problem formulations and solution methods
    • Kralj B, Petrovic R, (1988) Optimal preventive maintenance scheduling of thermal generating units in power systems-a survey of problem formulations and solution methods. European Journal of Operational Research 35: 1-15.
    • (1988) European Journal of Operational Research , vol.35 , pp. 1-15
    • Kralj, B.1    Petrovic, R.2
  • 52
    • 16244374307 scopus 로고    scopus 로고
    • Optimal preventive maintenance of a production system with an intermediate buffer
    • Kyriakidis E, Dimitrakos T, (2006) Optimal preventive maintenance of a production system with an intermediate buffer. European Journal of Operational Research 168: 86-99.
    • (2006) European Journal of Operational Research , vol.168 , pp. 86-99
    • Kyriakidis, E.1    Dimitrakos, T.2
  • 53
    • 0036638817 scopus 로고    scopus 로고
    • A sensitivity analysis of an integrated model for joint determination of economic design of x-control charts, economic production quantity and production run length for a deteriorating production system
    • Lam K, Rahim M, (2002) A sensitivity analysis of an integrated model for joint determination of economic design of x-control charts, economic production quantity and production run length for a deteriorating production system. Quality and Reliability Engineering International 18: 305-320.
    • (2002) Quality and Reliability Engineering International , vol.18 , pp. 305-320
    • Lam, K.1    Rahim, M.2
  • 54
    • 4344598897 scopus 로고    scopus 로고
    • Scheduling maintenance of electrical power transmission networks using genetic programming
    • Warwick K, Ekwue A, Aggarwal A, (eds), Institution of Electrical Engineers, Stevenage, UK
    • Langdon W, Treleaven P, (1997) Scheduling maintenance of electrical power transmission networks using genetic programming. In Warwick K, Ekwue A, Aggarwal A, (eds), Artificial intelligence techniques in power systems, Institution of Electrical Engineers, Stevenage, UK, 220-237.
    • (1997) Artificial intelligence techniques in power systems , pp. 220-237
    • Langdon, W.1    Treleaven, P.2
  • 55
    • 10844259870 scopus 로고    scopus 로고
    • A cost/benefit model for investments in inventory and preventive maintenance in an imperfect production system
    • Lee H, (2005) A cost/benefit model for investments in inventory and preventive maintenance in an imperfect production system. Computers and Industrial Engineering 48: 55-68.
    • (2005) Computers and Industrial Engineering , vol.48 , pp. 55-68
    • Lee, H.1
  • 56
    • 0023412314 scopus 로고
    • Simultaneous determination of production cycle and inspection schedules in a production system
    • Lee H, Rosenblatt M, (1987) Simultaneous determination of production cycle and inspection schedules in a production system. Management Science 33: 1125-1137.
    • (1987) Management Science , vol.33 , pp. 1125-1137
    • Lee, H.1    Rosenblatt, M.2
  • 57
    • 0024914068 scopus 로고
    • A production and maintenance planning model with restoration cost dependent on detection delay
    • Lee H, Rosenblatt M, (1989) A production and maintenance planning model with restoration cost dependent on detection delay. IIE Transactions 21(4): 368-375.
    • (1989) IIE Transactions , vol.21 , Issue.4 , pp. 368-375
    • Lee, H.1    Rosenblatt, M.2
  • 59
    • 33645033021 scopus 로고    scopus 로고
    • On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time
    • Lin G, Gong D, (2006) On a production-inventory system of deteriorating items subject to random machine breakdowns with a fixed repair time. Mathematics and Computer Modelling 43: 920-932.
    • (2006) Mathematics and Computer Modelling , vol.43 , pp. 920-932
    • Lin, G.1    Gong, D.2
  • 60
    • 3543075815 scopus 로고
    • Optimal preventive replacement, lot sizing and inspection policy for a deteriorating production system
    • Makis V, Fung J, (1995) Optimal preventive replacement, lot sizing and inspection policy for a deteriorating production system. Journal of Quality in Maintenance Engineering, 1(4): 41-55.
    • (1995) Journal of Quality in Maintenance Engineering , vol.1 , Issue.4 , pp. 41-55
    • Makis, V.1    Fung, J.2
  • 61
    • 0033820731 scopus 로고    scopus 로고
    • A dynamic approach for aircraft assignment and maintenance scheduling by airlines
    • Moudani WE, Mora-Camino F, (2000) A dynamic approach for aircraft assignment and maintenance scheduling by airlines. Journal of Air Transport Management 6: 233-237.
    • (2000) Journal of Air Transport Management , vol.6 , pp. 233-237
    • Moudani, W.E.1    Mora-Camino, F.2
  • 65
    • 0028548762 scopus 로고
    • Joint determination of production quantity, inspection schedule and control chart design
    • Rahim M, (1994) Joint determination of production quantity, inspection schedule, and control chart design. IIE Transactions, 26(6), 2-11.
    • (1994) IIE Transactions , vol.26 , Issue.6 , pp. 2-11
    • Rahim, M.1
  • 66
    • 0031648198 scopus 로고    scopus 로고
    • A generalized economic model for joint determination of production run, inspection schedule and control chart design
    • Rahim M, Ben-Daya M, (1998) A generalized economic model for joint determination of production run, inspection schedule and control chart design. International Journal of Production Research 36: 277-289.
    • (1998) International Journal of Production Research , vol.36 , pp. 277-289
    • Rahim, M.1    Ben-Daya, M.2
  • 67
    • 0035577718 scopus 로고    scopus 로고
    • Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products
    • Rahim M, Ben-Daya M, (2001) Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products. Journal of the Operational Research Society 52(12): 1370-1378.
    • (2001) Journal of the Operational Research Society , vol.52 , Issue.12 , pp. 1370-1378
    • Rahim, M.1    Ben-Daya, M.2
  • 70
    • 0027605751 scopus 로고
    • Scheduling for the maintenance of completely processed low-demand large items
    • Sarper H, (1993) Scheduling for the maintenance of completely processed low-demand large items. Applied Mathematical Modelling 17: 321-328.
    • (1993) Applied Mathematical Modelling , vol.17 , pp. 321-328
    • Sarper, H.1
  • 71
    • 0027627281 scopus 로고
    • MRSRP-a tool for manpower resources and spares requirements planning
    • Shenoy D, Bhadury B, (1993) MRSRP-a tool for manpower resources and spares requirements planning. Computers and Industrial Engineering 24: 421-439.
    • (1993) Computers and Industrial Engineering , vol.24 , pp. 421-439
    • Shenoy, D.1    Bhadury, B.2
  • 72
    • 0030291874 scopus 로고    scopus 로고
    • Production-inventory systems with preventive maintenance
    • Srinivasan M, Lee H, (1996) Production-inventory systems with preventive maintenance. IIE Transactions 28: 879-890.
    • (1996) IIE Transactions , vol.28 , pp. 879-890
    • Srinivasan, M.1    Lee, H.2
  • 73
    • 0037213213 scopus 로고    scopus 로고
    • An optimization model for aircraft maintenance scheduling and re-assignment
    • Sriram C, Haghani A, (2003) An optimization model for aircraft maintenance scheduling and re-assignment. Transportation Research Part A 37: 29-48.
    • (2003) Transportation Research Part A , vol.37 , pp. 29-48
    • Sriram, C.1    Haghani, A.2
  • 74
    • 0024063983 scopus 로고
    • An integrated cost model for the joint optimization of process control and maintenance
    • Tagaras G, (1988) An integrated cost model for the joint optimization of process control and maintenance. Journal of the Operational Research Society 39(8): 757-766.
    • (1988) Journal of the Operational Research Society , vol.39 , Issue.8 , pp. 757-766
    • Tagaras, G.1
  • 75
    • 0031220052 scopus 로고    scopus 로고
    • A general framework for preventive maintenance optimization in chemical process operations
    • Tan J, Kramer M, (1997) A general framework for preventive maintenance optimization in chemical process operations. Computers and Chemical Engineering 21(12): 1451-1469.
    • (1997) Computers and Chemical Engineering , vol.21 , Issue.12 , pp. 1451-1469
    • Tan, J.1    Kramer, M.2
  • 76
    • 0030218654 scopus 로고    scopus 로고
    • Optimal preventive maintenance policy for deteriorating production systems
    • Tseng S, (1996) Optimal preventive maintenance policy for deteriorating production systems. IIE Transactions 28: 687-694.
    • (1996) IIE Transactions , vol.28 , pp. 687-694
    • Tseng, S.1
  • 79
    • 52149087999 scopus 로고    scopus 로고
    • Maintenance grouping in multi-setup multi-component production systems
    • Ben-Daya M, Duffuaa M, Raouf A, (eds) Kluwer Academic Publishers
    • Van Dijkhuizen G, (2000) Maintenance grouping in multi-setup multi-component production systems. In Ben-Daya M, Duffuaa M, Raouf A, (eds) Maintenance, Modeling and Optimization, Kluwer Academic Publishers, 283-306.
    • (2000) Maintenance, Modeling and Optimization , pp. 283-306
    • Van Dijkhuizen, G.1
  • 82
    • 0033079417 scopus 로고    scopus 로고
    • Availability and cost functions for periodically inspected preventively maintained units
    • Vaurio J, (1999) Availability and cost functions for periodically inspected preventively maintained units. Reliability Engineering and System Safety 63: 133-140.
    • (1999) Reliability Engineering and System Safety , vol.63 , pp. 133-140
    • Vaurio, J.1
  • 83
    • 33644993420 scopus 로고    scopus 로고
    • Optimal production and maintenance policy for imperfect production systems
    • Wang C, (2006) Optimal production and maintenance policy for imperfect production systems. Naval Research Logistics 53: 151-156.
    • (2006) Naval Research Logistics , vol.53 , pp. 151-156
    • Wang, C.1
  • 84
    • 0037211215 scopus 로고    scopus 로고
    • Determining the optimal production-maintenance policy with inspection errors: Using a Markov chain
    • Wang C, Sheu S, (2003) Determining the optimal production-maintenance policy with inspection errors: using a Markov chain. Computers & Operations Research 30: 1-17.
    • (2003) Computers & Operations Research , vol.30 , pp. 1-17
    • Wang, C.1    Sheu, S.2
  • 85
    • 0033198250 scopus 로고    scopus 로고
    • Integrating maintenance and production decisions in a hierarchical production planning environment
    • Weinstein L, Chung C, (1999) Integrating maintenance and production decisions in a hierarchical production planning environment. Computers & Operations Research 26: 1059-1074.
    • (1999) Computers & Operations Research , vol.26 , pp. 1059-1074
    • Weinstein, L.1    Chung, C.2
  • 86
    • 0031121848 scopus 로고    scopus 로고
    • Coordinated condition-based repair strategies for components of a multi-component maintenance system with discounts
    • Wijnmalen D, Hontelez A, (1997) Coordinated condition-based repair strategies for components of a multi-component maintenance system with discounts. European Journal of Operational Research 98: 52-63.
    • (1997) European Journal of Operational Research , vol.98 , pp. 52-63
    • Wijnmalen, D.1    Hontelez, A.2
  • 87
    • 23844545243 scopus 로고    scopus 로고
    • Airline short-term maintenance manpower supply planning
    • Yan S, Yang T, Chen H, (2004) Airline short-term maintenance manpower supply planning. Transportation Research Part A 38: 615-642.
    • (2004) Transportation Research Part A , vol.38 , pp. 615-642
    • Yan, S.1    Yang, T.2    Chen, H.3
  • 88
    • 27744573776 scopus 로고    scopus 로고
    • Optimal joint preventive maintenance and production policies
    • Yao X, Xie X, Fu M, Marcus S, (2005) Optimal joint preventive maintenance and production policies. Naval Research Logistics 52: 668-681.
    • (2005) Naval Research Logistics , vol.52 , pp. 668-681
    • Yao, X.1    Xie, X.2    Fu, M.3    Marcus, S.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.