|
Volumn 20, Issue 7, 2002, Pages 581-591
|
Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry
a a a |
Author keywords
Construction plant; Downtime cost; Machine cycle time; Productivity; Regression analysis
|
Indexed keywords
ECONOMICS;
EXCAVATORS;
HYDRAULIC MINING;
INFORMATION ANALYSIS;
REGRESSION ANALYSIS;
DOWNTIME COSTS;
CONSTRUCTION INDUSTRY;
COST;
EXCAVATION;
MINING INDUSTRY;
OPENCAST MINING;
|
EID: 0036812375
PISSN: 01446193
EISSN: None
Source Type: Journal
DOI: 10.1080/01446190210163552 Document Type: Article |
Times cited : (33)
|
References (27)
|