메뉴 건너뛰기




Volumn 27, Issue 4, 2003, Pages 449-467

Optimization of preventive maintenance strategies in a multipurpose batch plant: Application to semiconductor manufacturing

Author keywords

Maintenance; Optimization; Reliability; Replacement; Scheduling; Semiconductor manufacturing

Indexed keywords

COMPUTER SIMULATION; COSTS; OBJECT ORIENTED PROGRAMMING; PRODUCTION ENGINEERING; SEMICONDUCTOR DEVICE MANUFACTURE;

EID: 0037445888     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0098-1354(02)00216-8     Document Type: Article
Times cited : (35)

References (30)
  • 1
    • 0021850598 scopus 로고
    • The determination of maintenance strategies for plants subject to breakdown
    • Backert, W., & Rippin, D. W. T. (1985). The determination of maintenance strategies for plants subject to breakdown. Computers and Chemical Engineering 9, 113-126.
    • (1985) Computers and Chemical Engineering , vol.9 , pp. 113-126
    • Backert, W.1    Rippin, D.W.T.2
  • 2
    • 0000567436 scopus 로고
    • Relevant costs, congestion and stochasticity in production environments
    • Banker, R. D., Datar, D., & Kekre, S. (1988). Relevant costs, congestion and stochasticity in production environments. Journal of Accounting and Economics 10, 171-197.
    • (1988) Journal of Accounting and Economics , vol.10 , pp. 171-197
    • Banker, R.D.1    Datar, D.2    Kekre, S.3
  • 3
    • 0024901561 scopus 로고
    • A simulation study of sequencing and maintenance decisions in a dynamic job shop
    • Burton, J. S., Banerjee, A., & Sylla, C. (1989). A simulation study of sequencing and maintenance decisions in a dynamic job shop. Computers and Industrial Engineering 17, 447-452.
    • (1989) Computers and Industrial Engineering , vol.17 , pp. 447-452
    • Burton, J.S.1    Banerjee, A.2    Sylla, C.3
  • 5
    • 2242437726 scopus 로고    scopus 로고
    • Implementation of a failure model validation technique using a discrete-event batch simulator: Application to semiconductor manufacturing
    • Charles, A. S., Azzaro-Pantel, C., Domenech, S., Pibouleau, L., Floquet, P., Jaume, D., & Tilhac, F. (2001). Implementation of a failure model validation technique using a discrete-event batch simulator: application to semiconductor manufacturing. Computers and Chemical Engineering 9, 117-122.
    • (2001) Computers and Chemical Engineering , vol.9 , pp. 117-122
    • Charles, A.S.1    Azzaro-Pantel, C.2    Domenech, S.3    Pibouleau, L.4    Floquet, P.5    Jaume, D.6    Tilhac, F.7
  • 7
    • 0022992279 scopus 로고
    • Signature analysis: Simulation of inventory, cycle time and throughput trade-offs in wafer fabrication IEEE Transactions on Component
    • Dayhoff, J. E., & Atherton, R. W. (1986). Signature analysis: simulation of inventory, cycle time and throughput trade-offs in wafer fabrication IEEE Transactions on Component. Hybrids and Manufacturing Technology 9, 498-507.
    • (1986) Hybrids and Manufacturing Technology , vol.9 , pp. 498-507
    • Dayhoff, J.E.1    Atherton, R.W.2
  • 8
    • 0029236976 scopus 로고
    • Preventive maintenance policy optimization for multipurpose plant equipment
    • Dedopoulos, I. T., & Shah, N. (1995a). Preventive maintenance policy optimization for multipurpose plant equipment. Computers and Chemical Engineering S19, S693-S698.
    • (1995) Computers and Chemical Engineering , vol.S19
    • Dedopoulos, I.T.1    Shah, N.2
  • 9
    • 0029231167 scopus 로고
    • Optimal short-term scheduling of maintenance and production for multipurpose plants
    • Dedopoulos, I. T., & Shah, N. (1995b). Optimal short-term scheduling of maintenance and production for multipurpose plants. Industrial Engineering and Chemical Research 34, 192-201.
    • (1995) Industrial Engineering and Chemical Research , vol.34 , pp. 192-201
    • Dedopoulos, I.T.1    Shah, N.2
  • 11
    • 4243302024 scopus 로고    scopus 로고
    • Presses polytechniques et universitaires romandes, collection informatique
    • Erard, P.J., Deguenon, P. (1996). Simulations par événements discrets [Presses polytechniques et universitaires romandes, collection informatique].
    • (1996) Simulations par Événements Discrets
    • Erard, P.J.1    Deguenon, P.2
  • 12
    • 0026172219 scopus 로고
    • A maintenance policy for repairable systems based on opportunistic failure rate tolerance
    • Fard, N., & Zheng, X. (1991). A maintenance policy for repairable systems based on opportunistic failure rate tolerance. IEEE Transaction on Reliability 40, 237.
    • (1991) IEEE Transaction on Reliability , vol.40 , pp. 237
    • Fard, N.1    Zheng, X.2
  • 14
    • 0026837810 scopus 로고
    • Cost of optimization of maintenance scheduling for a system with assured reliability
    • Jayalaban, V., & Chaudhuri, D. (1992b). Cost of optimization of maintenance scheduling for a system with assured reliability. IEEE Transaction on Reliability 41, 21.
    • (1992) IEEE Transaction on Reliability , vol.41 , pp. 21
    • Jayalaban, V.1    Chaudhuri, D.2
  • 15
    • 0003622257 scopus 로고    scopus 로고
    • Paris: MASSON Collection Organisation Industrielle
    • Monchy, F. (1996). La Fonction maintenance. Paris: MASSON Collection Organisation Industrielle.
    • (1996) La Fonction Maintenance
    • Monchy, F.1
  • 21
    • 0012540058 scopus 로고
    • Simulation par événements discrets d'un atelier de fabrication de composants électroniques
    • Peyrol, E., Pibouleau, L., Floquet, P., Couderc, J. P., & Domenech, S. (1993). Simulation par événements discrets d'un atelier de fabrication de composants électroniques. Entropie 178, 3-16.
    • (1993) Entropie , vol.178 , pp. 3-16
    • Peyrol, E.1    Pibouleau, L.2    Floquet, P.3    Couderc, J.P.4    Domenech, S.5
  • 23
    • 0031186420 scopus 로고    scopus 로고
    • Using simulation to improve semiconductor manufacturing
    • Potti, K., & Mason, S. J. (1997). Using simulation to improve semiconductor manufacturing. Semiconductor International, 289-293.
    • (1997) Semiconductor International , pp. 289-293
    • Potti, K.1    Mason, S.J.2
  • 24
    • 0029216440 scopus 로고
    • Effects of equipment failure uncertainty in batch production scheduling
    • Sanmarti, E., Espuna, A., & Puigjaner, L. (1995). Effects of equipment failure uncertainty in batch production scheduling. Computers and Chemical Engineering 19, 565-570.
    • (1995) Computers and Chemical Engineering , vol.19 , pp. 565-570
    • Sanmarti, E.1    Espuna, A.2    Puigjaner, L.3
  • 25
    • 0031193217 scopus 로고    scopus 로고
    • Batch production and preventive maintenance scheduling under equipment failure uncertainty
    • Sanmarti, E., Espuna, A., & Puigjaner, L. (1997). Batch production and preventive maintenance scheduling under equipment failure uncertainty. Computers and Chemical Engineering 21, 1157-1168.
    • (1997) Computers and Chemical Engineering , vol.21 , pp. 1157-1168
    • Sanmarti, E.1    Espuna, A.2    Puigjaner, L.3
  • 26
    • 0029231799 scopus 로고
    • Hazard function modeling using cross validation: From data collection to model selection
    • Tan, J. S., & Kramer, M. A. (1995). Hazard function modeling using cross validation: from data collection to model selection. Reliability Engineering and System Safety 49, 155-169.
    • (1995) Reliability Engineering and System Safety , vol.49 , pp. 155-169
    • Tan, J.S.1    Kramer, M.A.2
  • 27
    • 0031220052 scopus 로고    scopus 로고
    • A general framework for preventive maintenance optimization in chemical process operations
    • Tan, J. S., & Kramer, M. A. (1997). A general framework for preventive maintenance optimization in chemical process operations. Computers and Chemical Engineering 21, 1451-1469.
    • (1997) Computers and Chemical Engineering , vol.21 , pp. 1451-1469
    • Tan, J.S.1    Kramer, M.A.2
  • 28
    • 84952240555 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part I: System characteristics, performance evaluation and production planning
    • Uzsoy, R., Lee, C. Y., & Martin-Vega, L. A. (1992). A review of production planning and scheduling models in the semiconductor industry. Part I: system characteristics, performance evaluation and production planning. IEE Transactions on Scheduling and Logistics 24, 47-61.
    • (1992) IEE Transactions on Scheduling and Logistics , vol.24 , pp. 47-61
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 29
    • 0028496979 scopus 로고
    • A review of production planning and scheduling models in the semiconductor industry. Part II: Shop floor control
    • Uzsoy, R., Lee, C. Y., & Martin-Vega, L. A. (1994). A review of production planning and scheduling models in the semiconductor industry. Part II: shop floor control. IEE Transactions on Scheduling and Logistics 26, 44-55.
    • (1994) IEE Transactions on Scheduling and Logistics , vol.26 , pp. 44-55
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 30
    • 0025849239 scopus 로고
    • An approximate method for non-repairable systems based on opportunistic replacement policy
    • Zheng, X., & Fard, D. (1991). An approximate method for non-repairable systems based on opportunistic replacement policy. Reliability Engineering and System Safety 33, 277-288.
    • (1991) Reliability Engineering and System Safety , vol.33 , pp. 277-288
    • Zheng, X.1    Fard, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.