메뉴 건너뛰기




Volumn 24, Issue 4, 2010, Pages 476-489

A three-stage framework for introducing a 4D tool in large consulting firms

Author keywords

4D tool; Usability test; Workflow

Indexed keywords

4D TOOLS; BUSINESS PROCESS; COMMERCIAL SOFTWARE; CONSULTING FIRMS; DESIGN-BUILD PROJECTS; EFFICIENT CONSTRUCTION; ENGINEERING , PROCUREMENT AND CONSTRUCTIONS; ENGINEERING FIRMS; HARDWARE AND SOFTWARE COMPONENTS; LARGE DESIGNS; MANAGEMENT PLANS; MANAGEMENT TOOL; PERFORMANCE EVALUATION; REQUIREMENT ANALYSIS; SYSTEM EVALUATION; USABILITY STUDIES; USABILITY TESTS; WORKFLOW;

EID: 77957259807     PISSN: 14740346     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.aei.2010.04.002     Document Type: Conference Paper
Times cited : (14)

References (47)
  • 1
    • 84856342748 scopus 로고    scopus 로고
    • Construction Director: 4D simulation system for plant construction
    • Bangkok, Thailand, August 3-5
    • S.H. Hsieh, C.S. Chen, Y.F. Liao, C.T. Yang, I.C. Wu, Construction Director: 4D simulation system for plant construction, in: Proceedings of the EASEC-10, Bangkok, Thailand, August 3-5, 2006.
    • (2006) Proceedings of the EASEC-10
    • Hsieh, S.H.1    Chen, C.S.2    Liao, Y.F.3    Yang, C.T.4    Wu, I.C.5
  • 2
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction schedules with CAD tools
    • PII S0926580598000533
    • K. McKinney, and M. Fischer Generating, evaluating and visualizing construction schedules with CAD tools Automation in Construction 7 1998 433 447 (Pubitemid 128429311)
    • (1998) Automation in Construction , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 4
    • 2342436357 scopus 로고    scopus 로고
    • Assessment of the capabilities of a commercial 4D CAD system to visualize equipment space requirements on construction sites
    • Hawaii, March 19-21
    • B. Akinci, K. Tantisevi, E. Ergen, Assessment of the capabilities of a commercial 4D CAD system to visualize equipment space requirements on construction sites, in: Proceedings of the CRC, Honolulu, Hawaii, March 19-21, 2003.
    • (2003) Proceedings of the CRC, Honolulu
    • Akinci, B.1    Tantisevi, K.2    Ergen, E.3
  • 5
    • 13244275240 scopus 로고    scopus 로고
    • Application of 4D for dynamic site layout and management of construction projects
    • DOI 10.1016/j.autcon.2004.08.011, PII S0926580504001104, International Conference for Construction Information Technology
    • Z. Ma, Q. Shen, and J. Zhang Application of 4D for dynamic site layout and management of construction projects Automation in Construction 14 2005 369 381 (Pubitemid 40183428)
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 369-381
    • Ma, Z.1    Shen, Q.2    Zhang, J.3
  • 12
    • 13244275240 scopus 로고    scopus 로고
    • Application of 4D for dynamic site layout and management of construction projects
    • DOI 10.1016/j.autcon.2004.08.011, PII S0926580504001104, International Conference for Construction Information Technology
    • Ma Zhaoyang, Q. Shen, and J. Zhang Application of 4D dynamic site layout and management of construction projects Automation in Construction 14 2005 369 389 (Pubitemid 40183428)
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 369-381
    • Ma, Z.1    Shen, Q.2    Zhang, J.3
  • 14
    • 21344441909 scopus 로고    scopus 로고
    • VISCON: Computer visualization support for constructability
    • A.A. Ganah, N.B. Bouchlaghem, and C.J. Anumba VISCON: computer visualization support for constructability ITcon 10 2005 69 83
    • (2005) ITcon , vol.10 , pp. 69-83
    • Ganah, A.A.1    Bouchlaghem, N.B.2    Anumba, C.J.3
  • 15
    • 34248575853 scopus 로고    scopus 로고
    • Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling
    • J.H. Kang, S.D. Anderson, and M.J. Clayton Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling Journal of Construction Engineering and Management 133 6 2007 447 461
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 447-461
    • Kang, J.H.1    Anderson, S.D.2    Clayton, M.J.3
  • 18
    • 13944251393 scopus 로고    scopus 로고
    • Four-dimensional visualization of construction scheduling and site utilization
    • DOI 10.1061/(ASCE)0733-9364(2004)130:4(598)
    • K.W. Chan, M. Anson, and J.P. Zhang Four-dimensional visualization of construction scheduling and site utilization Journal of Construction Engineering and Management 130 4 2004 598 606 (Pubitemid 40265357)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.4 , pp. 598-606
    • Chau, K.W.1    Anson, M.2    Zhang, J.P.3
  • 22
    • 54549110738 scopus 로고    scopus 로고
    • 4D system for visualizing schedule progress of horizontal construction project including earthwork
    • Orlando, Florida, USA, August 3-4
    • L.S. Kang, S.B. Jee, C.H. Kim, 4D system for visualizing schedule progress of horizontal construction project including earthwork, in: Proceedings of 6th CONVR, Orlando, Florida, USA, August 3-4, 2006.
    • (2006) Proceedings of 6th CONVR
    • Kang, L.S.1    Jee, S.B.2    Kim, C.H.3
  • 23
    • 0031103114 scopus 로고    scopus 로고
    • System evaluation and quality improvement
    • PII S0164121296001744
    • G. Boloix System evaluation and quality improvement Journal of Systems and Software 36 3 1997 297 311 (Pubitemid 127371549)
    • (1997) Journal of Systems and Software , vol.36 , Issue.3 , pp. 297-311
    • Boloix, G.1
  • 24
    • 0010954857 scopus 로고
    • Action research: A sociotechnical systems perspective
    • G. Susman Action research: a sociotechnical systems perspective G. Morgan, Beyond Method: Strategies for Social Research 1983 Sage Newbury Park 95 113
    • (1983) Beyond Method: Strategies for Social Research , pp. 95-113
    • Susman, G.1
  • 26
    • 0038823672 scopus 로고    scopus 로고
    • Automating hierarchical document classification for construction management information systems
    • C.H. Caldas, and L. Soibelman Automating hierarchical document classification for construction management information systems Automation in Construction 12 2003 395 407
    • (2003) Automation in Construction , vol.12 , pp. 395-407
    • Caldas, C.H.1    Soibelman, L.2
  • 27
    • 57549092518 scopus 로고    scopus 로고
    • Improvement of a computer-based surveyor-training tool using a user-centered approach
    • C.C. Lu, S.C. Kang, S.H. Hseih, and R.H. Shiu Improvement of a computer-based surveyor-training tool using a user-centered approach Advanced Engineering Informatics 23 2009 81 92
    • (2009) Advanced Engineering Informatics , vol.23 , pp. 81-92
    • Lu, C.C.1    Kang, S.C.2    Hseih, S.H.3    Shiu, R.H.4
  • 28
    • 62549086142 scopus 로고    scopus 로고
    • Editorial: Human-centered product design and development
    • C.H. Chen, K. Ssto, and K.P. Lee Editorial: human-centered product design and development Advanced Engineering Informatics 23 2009 140 141
    • (2009) Advanced Engineering Informatics , vol.23 , pp. 140-141
    • Chen, C.H.1    Ssto, K.2    Lee, K.P.3
  • 29
    • 57649149304 scopus 로고    scopus 로고
    • Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
    • A. Russell, S. Staub-French, N. Tran, and W. Wong Visualizing high-rise building construction strategies using linear scheduling and 4D CAD Automation in Construction 18 2009 219 236
    • (2009) Automation in Construction , vol.18 , pp. 219-236
    • Russell, A.1    Staub-French, S.2    Tran, N.3    Wong, W.4
  • 31
    • 70349188060 scopus 로고    scopus 로고
    • Systematic procedure of determining an ideal color scheme on 4D models
    • H.S. Chang, S.C. Kang, and P.H. Chen Systematic procedure of determining an ideal color scheme on 4D models Advanced Engineering Informatics 23 2009 463 473
    • (2009) Advanced Engineering Informatics , vol.23 , pp. 463-473
    • Chang, H.S.1    Kang, S.C.2    Chen, P.H.3
  • 32
    • 14544308351 scopus 로고    scopus 로고
    • 4D dynamic construction management and visualization software: 2. Site trial
    • DOI 10.1016/j.autcon.2004.11.005, PII S0926580504001487, 20th International Symposium on Automation and Robotics in Construction: The Future Site
    • K.W. Chau, M. Anson, and D.D. De Saram 4D dynamic construction management and visualization software: 2. Site trial Automation in Construction 14 4 2005 525 536 (Pubitemid 40305013)
    • (2005) Automation in Construction , vol.14 , Issue.4 , pp. 525-536
    • Chau, K.W.1    Anson, M.2    De Saram, D.D.3
  • 33
    • 0032108377 scopus 로고    scopus 로고
    • Towards a practical method to validate decision support systems
    • PII S0167923698000463
    • D. Borenstein Towards a practical method to validate decision support systems Decision Support Systems 23 3 1998 227 239 (Pubitemid 128430514)
    • (1998) Decision Support Systems , vol.23 , Issue.3 , pp. 227-239
    • Borenstein, D.1
  • 35
    • 62749085013 scopus 로고    scopus 로고
    • Human-centric product conceptualization using a design space framework
    • Y.T. Chong, C.H. Chen, and K.F. Leong Human-centric product conceptualization using a design space framework Advanced Engineering Informatics 23 2 2009 149 156
    • (2009) Advanced Engineering Informatics , vol.23 , Issue.2 , pp. 149-156
    • Chong, Y.T.1    Chen, C.H.2    Leong, K.F.3
  • 36
    • 14544290921 scopus 로고    scopus 로고
    • An architecture for workflow scheduling under resource allocation constraints
    • DOI 10.1016/j.is.2004.03.003, PII S030643790400047X
    • P. Senkul, and I.H. Toroslu An architecture for workflow scheduling under resource allocation constraints Information Systems 30 5 2005 399 422 (Pubitemid 40304704)
    • (2005) Information Systems , vol.30 , Issue.5 , pp. 399-422
    • Senkul, P.1    Toroslu, I.H.2
  • 38
    • 70350161437 scopus 로고    scopus 로고
    • A process view on end-user resistance during construction IT implementations
    • T. Hartmann, and M. Fischer A process view on end-user resistance during construction IT implementations ITcon 14 2009 353 365
    • (2009) ITcon , vol.14 , pp. 353-365
    • Hartmann, T.1    Fischer, M.2
  • 42
    • 33751501800 scopus 로고    scopus 로고
    • Supporting the constructability review with 3D/4D models
    • DOI 10.1080/09613210600942218, PII NU6071P73H7T2004
    • T. Hartmann, and M. Fischer Supporting the constructability review with 3D/4D models Building Research and Information 35 1 2007 70 80 (Pubitemid 44838090)
    • (2007) Building Research and Information , vol.35 , Issue.1 , pp. 70-80
    • Hartmann, T.1    Fischer, M.2
  • 44
    • 13944251393 scopus 로고    scopus 로고
    • Four-dimensional visualization of construction scheduling and site utilization
    • DOI 10.1061/(ASCE)0733-9364(2004)130:4(598)
    • K.W. Chau, M. Anson, and J.P. Zhang Four-dimensional visualization of construction scheduling and site utilization Journal of Construction Engineering and Management 130 4 2004 598 606 (Pubitemid 40265357)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.4 , pp. 598-606
    • Chau, K.W.1    Anson, M.2    Zhang, J.P.3
  • 46
    • 77957279464 scopus 로고    scopus 로고
    • Experiences on study of setting-up a 4D construction management tool in a high-rise construction project
    • Beijing, China, October 16-18
    • M.H. Tsai, S.C. Kang, S.H. Hsieh, C.H. Kuo, T.G. Pei, K.C. Yeh, Experiences on study of setting-up a 4D construction management tool in a high-rise construction project, in: Proceedings of 12th ICCCBE XII & INCITE 2008, Beijing, China, October 16-18, 2008.
    • (2008) Proceedings of 12th ICCCBE XII & INCITE 2008
    • Tsai, M.H.1    Kang, S.C.2    Hsieh, S.H.3    Kuo, C.H.4    Pei, T.G.5    Yeh, K.C.6


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.