2
-
-
84877728352
-
Stabilizing production flow of finishing works in building construction with re-entrant flow
-
I. Brodetskaia, R. Sacks, and A. Shapira Stabilizing production flow of finishing works in building construction with re-entrant flow J. Constr. Eng. Manag. 139 6 2013 665 674
-
(2013)
J. Constr. Eng. Manag.
, vol.139
, Issue.6
, pp. 665-674
-
-
Brodetskaia, I.1
Sacks, R.2
Shapira, A.3
-
3
-
-
84855431214
-
A workflow model for finishing works in building construction
-
I. Brodetskaia, R. Sacks, and A. Shapira A workflow model for finishing works in building construction Constr. Manag. Econ. 29 2011 1209 1220
-
(2011)
Constr. Manag. Econ.
, vol.29
, pp. 1209-1220
-
-
Brodetskaia, I.1
Sacks, R.2
Shapira, A.3
-
5
-
-
0345356706
-
Application of the new production philosophy to the construction industry
-
Center for Integrated Facilities Engineering, Dept. of Civil Engineering Palo Alto, CA
-
L. Koskela Application of the new production philosophy to the construction industry Vol. Technical Report No. 72 1992 Center for Integrated Facilities Engineering, Dept. of Civil Engineering Palo Alto, CA 30 37
-
(1992)
Vol. Technical Report No. 72
, pp. 30-37
-
-
Koskela, L.1
-
7
-
-
0042689966
-
Influence of project type and procurement method on rework costs in building construction projects
-
DOI 10.1061/(ASCE)0733-9364(2002)128:1(18)
-
P. Love Influence of project type and procurement method on rework costs in building construction projects J. Constr. Eng. Manag. 128 1 2002 18 29 (Pubitemid 40264891)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.1
, pp. 18-29
-
-
Love, P.E.D.1
-
8
-
-
27944450797
-
Calculating total rework costs in Australian construction projects
-
DOI 10.1080/10286600500049904
-
P.E.D. Love, and D.J. Edwards Calculating total rework costs in Australian construction projects Civ. Eng. Environ. Syst. 22 1 2005 11 27 (Pubitemid 41663392)
-
(2005)
Civil Engineering and Environmental Systems
, vol.22
, Issue.1
, pp. 11-27
-
-
Love, P.E.D.1
Edwards, D.J.2
-
9
-
-
33847222202
-
Assessing research issues in Automated Project Performance Control (APPC)
-
R. Navon, and R. Sacks Assessing research issues in Automated Project Performance Control (APPC) Autom. Constr. 16 4 2007 474 484
-
(2007)
Autom. Constr.
, vol.16
, Issue.4
, pp. 474-484
-
-
Navon, R.1
Sacks, R.2
-
10
-
-
84887846862
-
KanBIM Lean Construction Workflow Management System: Prototype implementation and field testing
-
R. Sacks, R. Barak, B. Belaciano, U. Gurevich, and E. Pikas KanBIM Lean Construction Workflow Management System: prototype implementation and field testing Lean Constr. J. 9 1 2013 19 34
-
(2013)
Lean Constr. J.
, vol.9
, Issue.1
, pp. 19-34
-
-
Sacks, R.1
Barak, R.2
Belaciano, B.3
Gurevich, U.4
Pikas, E.5
-
11
-
-
84887838440
-
A hybrid discrete event simulation and virtual reality experimental setup for construction management research
-
(in press)
-
R. Sacks, U. Gurevich, and B. Belaciano A hybrid discrete event simulation and virtual reality experimental setup for construction management research J. Comput. Civ. Eng. 2013 (in press)
-
(2013)
J. Comput. Civ. Eng.
-
-
Sacks, R.1
Gurevich, U.2
Belaciano, B.3
-
12
-
-
33748139457
-
An economic game theory model of subcontractor resource allocation behaviour
-
DOI 10.1080/01446190600631856, PII W062505N20760183
-
R. Sacks, and M. Harel An economic game theory model of subcontractor resource allocation behavior Constr. Manag. Econ. 24 8 2006 869 881 (Pubitemid 44314576)
-
(2006)
Construction Management and Economics
, vol.24
, Issue.8
, pp. 869-881
-
-
Sacks, R.1
Harel, M.2
-
13
-
-
77955687856
-
Requirements for building information modeling based lean production management systems for construction
-
R. Sacks, M. Radosavljevic, and R. Barak Requirements for building information modeling based lean production management systems for construction Autom. Constr. 19 5 2010 641 655
-
(2010)
Autom. Constr.
, vol.19
, Issue.5
, pp. 641-655
-
-
Sacks, R.1
Radosavljevic, M.2
Barak, R.3
-
16
-
-
0032645520
-
Parade Game: Impact of work flow variability on trade performance
-
I.D. Tommelein, D.R. Riley, and G.A. Howell Parade Game: impact of work flow variability on trade performance J. Constr. Eng. Manag. 125 5 1999 304 310
-
(1999)
J. Constr. Eng. Manag.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
|