메뉴 건너뛰기




Volumn 29, Issue 12, 2011, Pages 1209-1227

A workflow model for systems and interior finishing works in building construction

Author keywords

Building construction; interior works; lean construction; production systems; workflow

Indexed keywords

BUILDING CONSTRUCTION; INTERIOR WORKS; LEAN CONSTRUCTION; PRODUCTION SYSTEMS; WORKFLOW;

EID: 84855431214     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446193.2011.647829     Document Type: Article
Times cited : (21)

References (34)
  • 1
    • 84855462080 scopus 로고    scopus 로고
    • Understanding flow and microvariability in construction: theory and practice
    • In: Pasquire C., Tzortzopoulous P., editors East Lansing, MI: Michigan State University 18-20 July
    • Brodetskaia, I. and Sacks, R. 2007. "Understanding flow and microvariability in construction: theory and practice". In Proceedings of the 15th Conference of the International Group for Lean Construction, Edited by: Pasquire, C. and Tzortzopoulous, P. 488-497. East Lansing, MI: Michigan State University. 18-20 July
    • (2007) Proceedings of the 15th Conference of the International Group for Lean Construction , pp. 488-497
    • Brodetskaia, I.1    Sacks, R.2
  • 5
    • 84855449195 scopus 로고    scopus 로고
    • An exploratory study on the measurement and analysis of making-do in construction sites
    • In: Rooke J., Dave B., editors Lima, Peru: Graña y Montero and Pontifica Universidad Católica del Perú 13-15 July
    • Formoso, C.T., Sommer, L., Koskela, L. and Isatto, E.L. 2011. "An exploratory study on the measurement and analysis of making-do in construction sites". In 19th Annual Conference of the International Group for Lean Construction, Edited by: Rooke, J. and Dave, B. 236-246. Lima, Peru: Graña y Montero and Pontifica Universidad Católica del Perú. 13-15 July
    • (2011) 19th Annual Conference of the International Group for Lean Construction , pp. 236-246
    • Formoso, C.T.1    Sommer, L.2    Koskela, L.3    Isatto, E.L.4
  • 6
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of work space conflicts in building construction
    • Guo, S. 2001. Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4): 287-195.
    • (2001) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 195-287
    • Guo, S.1
  • 13
    • 34250664260 scopus 로고    scopus 로고
    • Making do-the eighth category of waste
    • in Formoso, C.T. and Bertelsen, S. (eds) Lean Construction-DK, Elsinore, Denmark, 3-5 August
    • Koskela, L. (2004) Making do-the eighth category of waste, in Formoso, C.T. and Bertelsen, S. (eds) 12th Annual Conference on Lean Construction, Lean Construction-DK, Elsinore, Denmark, 3-5 August.
    • (2004) 12th Annual Conference on Lean Construction
    • Koskela, L.1
  • 14
    • 0013198772 scopus 로고    scopus 로고
    • The underlying theory of project management is obsolete
    • In: Slevin D.P., Cleland D.I., Pinto J.K., editors Seattle, WA: Project Management Institute 14-17 July
    • Koskela, L. and Howell, G. 2002. "The underlying theory of project management is obsolete". In PMI Research Conference, Edited by: Slevin, D.P., Cleland, D.I. and Pinto, J.K. 293-302. Seattle, WA: Project Management Institute. 14-17 July
    • (2002) PMI Research Conference , pp. 293-302
    • Koskela, L.1    Howell, G.2
  • 20
    • 84855449194 scopus 로고    scopus 로고
    • ProModel Corporation, Allentown, PA
    • TM, ProModel Corporation, Allentown, PA.
    • (2010) TM
  • 21
    • 0036140878 scopus 로고    scopus 로고
    • The evidence of complex variability in construction labour productivity
    • Radosavljević, M. and Horner, M. 2002. The evidence of complex variability in construction labour productivity. Construction Management and Economics, 20: 3-12.
    • (2002) Construction Management and Economics , vol.20 , pp. 3-12
    • Radosavljević, M.1    Horner, M.2
  • 22
    • 84855427577 scopus 로고    scopus 로고
    • Production system instability and subcontracted labor
    • In: O'Brien W.J., Formoso C., London K., Vrijhoef R., editors Boca Raton and London: CRC Press/Taylor & Francis
    • Sacks, R. 2008. "Production system instability and subcontracted labor". In Construction Supply Chain Management Handbook, Edited by: O'Brien, W.J., Formoso, C., London, K. and Vrijhoef, R. 8-22. Boca Raton and London: CRC Press/Taylor & Francis.
    • (2008) Construction Supply Chain Management Handbook , pp. 8-22
    • Sacks, R.1
  • 23
    • 34247279276 scopus 로고    scopus 로고
    • Lean management model for construction of high-rise apartment buildings
    • Sacks, R. and Goldin, M. 2007. Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5): 374-384.
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.5 , pp. 374-384
    • Sacks, R.1    Goldin, M.2
  • 24
    • 33748139457 scopus 로고    scopus 로고
    • An economic game theory model of subcontractor resource allocation behavior
    • Sacks, R. and Harel, M. 2006. An economic game theory model of subcontractor resource allocation behavior. Construction Management and Economics, 24(8): 869-881.
    • (2006) Construction Management and Economics , vol.24 , Issue.8 , pp. 869-881
    • Sacks, R.1    Harel, M.2
  • 25
    • 84876751108 scopus 로고    scopus 로고
    • Field tests of the KanBIM lean production management system
    • In: Rooke J., Dave B., editors Lima, Peru: Graña y Montero and Pontifica Universidad Católica del Perú 13-15 July
    • Sacks, R., Barak, R., Belaciano, B., Gurevich, U. and Pikas, E. 2011. "Field tests of the KanBIM lean production management system". In 19th Annual Conference of the International Group for Lean Construction, Edited by: Rooke, J. and Dave, B. 502-513. Lima, Peru: Graña y Montero and Pontifica Universidad Católica del Perú. 13-15 July
    • (2011) 19th Annual Conference of the International Group for Lean Construction , pp. 502-513
    • Sacks, R.1    Barak, R.2    Belaciano, B.3    Gurevich, U.4    Pikas, E.5
  • 27
    • 84855430702 scopus 로고    scopus 로고
    • Requirements identification for 4D constraint based construction planning and control system
    • In: Agger K., editors Aarhus, Denmark: Aarhus School of Architecture 12-14 June
    • Sriprasert, E. and Dawood, N. 2002. "Requirements identification for 4D constraint based construction planning and control system". In CIB W78 Conference 2002, Edited by: Agger, K. 1-8. Aarhus, Denmark: Aarhus School of Architecture. 12-14 June
    • (2002) CIB W78 Conference 2002 , pp. 1-8
    • Sriprasert, E.1    Dawood, N.2
  • 28
    • 0034225578 scopus 로고    scopus 로고
    • Schedule acceleration, work flow, and labor productivity
    • Thomas, H.R. 2000. Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4): 261-267.
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.4 , pp. 261-267
    • Thomas, H.R.1
  • 34
    • 67650085635 scopus 로고    scopus 로고
    • Using agent-based modeling to study construction labor productivity as emergent property of individual and crew interaction
    • Watkins, M., Mukherjee, A., Onder, N. and Mattila, K. 2009. Using agent-based modeling to study construction labor productivity as emergent property of individual and crew interaction. Journal of Construction Engineering and Management, 135(7): 657-667.
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.7 , pp. 657-667
    • Watkins, M.1    Mukherjee, A.2    Onder, N.3    Mattila, K.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.