Understanding flow and microvariability in construction: theory and practice
-
In: Pasquire C., Tzortzopoulous P., editors East Lansing, MI: Michigan State University 18-20 July
-
Brodetskaia, I. and Sacks, R. 2007. "Understanding flow and microvariability in construction: theory and practice". In Proceedings of the 15th Conference of the International Group for Lean Construction, Edited by: Pasquire, C. and Tzortzopoulous, P. 488-497. East Lansing, MI: Michigan State University. 18-20 July
-
(2007)
Proceedings of the 15th Conference of the International Group for Lean Construction
, pp. 488-497
-
-
Brodetskaia, I.1
Sacks, R.2
-
4
-
-
38649094993
-
-
Hoboken, NJ: John Wiley and Sons
-
Eastman, C.M., Teicholz, P., Sacks, R. and Liston, K. 2011. BIM Handbook: A Guide to Building Information Modeling of Owners Managers Designers Engineers and Contractors, 2nd edn, Hoboken, NJ: John Wiley and Sons.
-
(2011)
BIM Handbook: A Guide to Building Information Modeling of Owners Managers Designers Engineers and Contractors
-
-
Eastman, C.M.1
Teicholz, P.2
Sacks, R.3
Liston, K.4
-
5
-
-
84855449195
-
An exploratory study on the measurement and analysis of making-do in construction sites
-
In: Rooke J., Dave B., editors Lima, Peru: Graña y Montero and Pontifica Universidad Católica del Perú 13-15 July
-
Formoso, C.T., Sommer, L., Koskela, L. and Isatto, E.L. 2011. "An exploratory study on the measurement and analysis of making-do in construction sites". In 19th Annual Conference of the International Group for Lean Construction, Edited by: Rooke, J. and Dave, B. 236-246. Lima, Peru: Graña y Montero and Pontifica Universidad Católica del Perú. 13-15 July
-
(2011)
19th Annual Conference of the International Group for Lean Construction
, pp. 236-246
-
-
Formoso, C.T.1
Sommer, L.2
Koskela, L.3
Isatto, E.L.4
-
6
-
-
2342430993
-
Identification and resolution of work space conflicts in building construction
-
Guo, S. 2001. Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering and Management, 128(4): 287-195.
-
(2001)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 195-287
-
-
Guo, S.1
-
7
-
-
0032656251
-
Impact of change orders on labor efficiency for mechanical construction
-
Hanna, A.S., Russell, J.S., Gotzion, T.W. and Nordheim, E.V. 1999. Impact of change orders on labor efficiency for mechanical construction. Journal of Construction Engineering and Management, 125(3): 176-184.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 176-184
-
-
Hanna, A.S.1
Russell, J.S.2
Gotzion, T.W.3
Nordheim, E.V.4
-
10
-
-
84856737237
-
-
Abingdon, Oxon,UK: Spon Press
-
Kenley, R. and Seppänen, O. 2009. Location-Based Management for Construction: Planning, Scheduling and Control, Abingdon, Oxon,UK: Spon Press.
-
(2009)
Location-Based Management for Construction: Planning, Scheduling and Control
-
-
Kenley, R.1
Seppänen, O.2
-
13
-
-
34250664260
-
Making do-the eighth category of waste
-
in Formoso, C.T. and Bertelsen, S. (eds) Lean Construction-DK, Elsinore, Denmark, 3-5 August
-
Koskela, L. (2004) Making do-the eighth category of waste, in Formoso, C.T. and Bertelsen, S. (eds) 12th Annual Conference on Lean Construction, Lean Construction-DK, Elsinore, Denmark, 3-5 August.
-
(2004)
12th Annual Conference on Lean Construction
-
-
Koskela, L.1
-
14
-
-
0013198772
-
The underlying theory of project management is obsolete
-
In: Slevin D.P., Cleland D.I., Pinto J.K., editors Seattle, WA: Project Management Institute 14-17 July
-
Koskela, L. and Howell, G. 2002. "The underlying theory of project management is obsolete". In PMI Research Conference, Edited by: Slevin, D.P., Cleland, D.I. and Pinto, J.K. 293-302. Seattle, WA: Project Management Institute. 14-17 July
-
(2002)
PMI Research Conference
, pp. 293-302
-
-
Koskela, L.1
Howell, G.2
-
15
-
-
14544291592
-
Change orders impact on labor productivity
-
Moselhi, O., Assem, I. and El-Rayes, K. 2005. Change orders impact on labor productivity. Journal of Construction Engineering and Management, 131(3): 354-359.
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.3
, pp. 354-359
-
-
Moselhi, O.1
Assem, I.2
El-Rayes, K.3
-
17
-
-
85055795333
-
-
Boca Raton and London: CRC Press/Taylor & Francis
-
O'Brien, W.J., Formoso, C., London, K. and Vrijhoef, R. 2008. Construction Supply Chain Management Handbook, Boca Raton and London: CRC Press/Taylor & Francis.
-
(2008)
Construction Supply Chain Management Handbook
-
-
O'Brien, W.J.1
Formoso, C.2
London, K.3
Vrijhoef, R.4
-
20
-
-
84855449194
-
-
ProModel Corporation, Allentown, PA
-
TM, ProModel Corporation, Allentown, PA.
-
(2010)
TM
-
-
-
21
-
-
0036140878
-
The evidence of complex variability in construction labour productivity
-
Radosavljević, M. and Horner, M. 2002. The evidence of complex variability in construction labour productivity. Construction Management and Economics, 20: 3-12.
-
(2002)
Construction Management and Economics
, vol.20
, pp. 3-12
-
-
Radosavljević, M.1
Horner, M.2
-
22
-
-
84855427577
-
Production system instability and subcontracted labor
-
In: O'Brien W.J., Formoso C., London K., Vrijhoef R., editors Boca Raton and London: CRC Press/Taylor & Francis
-
Sacks, R. 2008. "Production system instability and subcontracted labor". In Construction Supply Chain Management Handbook, Edited by: O'Brien, W.J., Formoso, C., London, K. and Vrijhoef, R. 8-22. Boca Raton and London: CRC Press/Taylor & Francis.
-
(2008)
Construction Supply Chain Management Handbook
, pp. 8-22
-
-
Sacks, R.1
-
23
-
-
34247279276
-
Lean management model for construction of high-rise apartment buildings
-
Sacks, R. and Goldin, M. 2007. Lean management model for construction of high-rise apartment buildings. Journal of Construction Engineering and Management, 133(5): 374-384.
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.5
, pp. 374-384
-
-
Sacks, R.1
Goldin, M.2
-
24
-
-
33748139457
-
An economic game theory model of subcontractor resource allocation behavior
-
Sacks, R. and Harel, M. 2006. An economic game theory model of subcontractor resource allocation behavior. Construction Management and Economics, 24(8): 869-881.
-
(2006)
Construction Management and Economics
, vol.24
, Issue.8
, pp. 869-881
-
-
Sacks, R.1
Harel, M.2
-
25
-
-
84876751108
-
Field tests of the KanBIM lean production management system
-
In: Rooke J., Dave B., editors Lima, Peru: Graña y Montero and Pontifica Universidad Católica del Perú 13-15 July
-
Sacks, R., Barak, R., Belaciano, B., Gurevich, U. and Pikas, E. 2011. "Field tests of the KanBIM lean production management system". In 19th Annual Conference of the International Group for Lean Construction, Edited by: Rooke, J. and Dave, B. 502-513. Lima, Peru: Graña y Montero and Pontifica Universidad Católica del Perú. 13-15 July
-
(2011)
19th Annual Conference of the International Group for Lean Construction
, pp. 502-513
-
-
Sacks, R.1
Barak, R.2
Belaciano, B.3
Gurevich, U.4
Pikas, E.5
-
27
-
-
84855430702
-
Requirements identification for 4D constraint based construction planning and control system
-
In: Agger K., editors Aarhus, Denmark: Aarhus School of Architecture 12-14 June
-
Sriprasert, E. and Dawood, N. 2002. "Requirements identification for 4D constraint based construction planning and control system". In CIB W78 Conference 2002, Edited by: Agger, K. 1-8. Aarhus, Denmark: Aarhus School of Architecture. 12-14 June
-
(2002)
CIB W78 Conference 2002
, pp. 1-8
-
-
Sriprasert, E.1
Dawood, N.2
-
28
-
-
0034225578
-
Schedule acceleration, work flow, and labor productivity
-
Thomas, H.R. 2000. Schedule acceleration, work flow, and labor productivity. Journal of Construction Engineering and Management, 126(4): 261-267.
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.4
, pp. 261-267
-
-
Thomas, H.R.1
-
30
-
-
13944264322
-
Reducing variability to improve performance as a lean construction principle
-
Thomas, H.R., Horman, M.J., de Souza, U.E.L. and Zavrski, I. 2002. Reducing variability to improve performance as a lean construction principle. ASCE Journal of Construction Engineering and Management, 128(2): 144-154.
-
(2002)
ASCE Journal of Construction Engineering and Management
, vol.128
, Issue.2
, pp. 144-154
-
-
Thomas, H.R.1
Horman, M.J.2
de Souza, U.E.L.3
Zavrski, I.4
-
31
-
-
0032645520
-
Parade game: impact of work flow variability on trade performance
-
Tommelein, I.D., Riley, D.R. and Howell, G.A. 1999. Parade game: impact of work flow variability on trade performance. Journal of Construction Engineering and Management, 125(5): 304-310.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
-
32
-
-
0030660964
-
-
Paper presented at the ACC-American Control Conference, Albuquerque, New Mexico, 4-6 June
-
Vargas-Villamil, F.D. and Rivera, D.E. (1997) Scheduling of reentrant manufacturing lines using a model predictive control (MPC) approach. Paper presented at the ACC-American Control Conference, Albuquerque, New Mexico, 4-6 June.
-
(1997)
Scheduling of reentrant manufacturing lines using a model predictive control (MPC) approach
-
-
Vargas-Villamil, F.D.1
Rivera, D.E.2
-
34
-
-
67650085635
-
Using agent-based modeling to study construction labor productivity as emergent property of individual and crew interaction
-
Watkins, M., Mukherjee, A., Onder, N. and Mattila, K. 2009. Using agent-based modeling to study construction labor productivity as emergent property of individual and crew interaction. Journal of Construction Engineering and Management, 135(7): 657-667.
-
(2009)
Journal of Construction Engineering and Management
, vol.135
, Issue.7
, pp. 657-667
-
-
Watkins, M.1
Mukherjee, A.2
Onder, N.3
Mattila, K.4
|