-
1
-
-
0003469953
-
-
New York: Marcel Dekker Inc
-
Ascher, H. E. and Feingold, H., 1984. Repairable systems Reliability: Modeling, Inference, Misconceptions, and Their Causes. New York: Marcel Dekker Inc.
-
(1984)
Repairable Systems Reliability: Modeling, Inference, Misconceptions, and Their Causes
-
-
Ascher, H.E.1
Feingold, H.2
-
2
-
-
0031099506
-
A multicriteria approach to the selection of preventive maintenance intervals
-
PII S0925527396001132
-
Chareonsuk, C., Nagarur, N. and Tabucanon, M. T., 1997. A multi-criteria approach to the selection of preventive maintenance intervals. International Journal of Production Economics, 49(1), 55-64. (Pubitemid 127412304)
-
(1997)
International Journal of Production Economics
, vol.49
, Issue.1
, pp. 55-64
-
-
Chareonsuk, C.1
Nagarur, N.2
Tabucanon, M.T.3
-
3
-
-
0003722376
-
-
Reading, MA, USA: Addison-Wesley
-
Goldberg, D., 1989. Genetic algorithms in search, optimization, and machine learning. Reading, MA, USA: Addison-Wesley.
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.1
-
5
-
-
0026837810
-
Cost optimization of maintenance scheduling for a system with assured reliability
-
Jayabalan, V. and Chaudhuri, D., 1992. Cost optimization of maintenance scheduling for a system with assured reliability. IEEE Transactions on Reliability, 41(1), 21-25.
-
(1992)
IEEE Transactions on Reliability
, vol.41
, Issue.1
, pp. 21-25
-
-
Jayabalan, V.1
Chaudhuri, D.2
-
6
-
-
0005868488
-
A method for maintenance scheduling using GA combined with SA
-
Kim, H., Nara, K. and Gen, M., 1994. A method for maintenance scheduling using GA combined with SA. Computers & Industrial Engineering, 27(1), 477-480.
-
(1994)
Computers & Industrial Engineering
, vol.27
, Issue.1
, pp. 477-480
-
-
Kim, H.1
Nara, K.2
Gen, M.3
-
7
-
-
26444479778
-
Optimization by simulated annealing
-
New Series
-
Kirkpatrick, S., Gelatt, C. D. and Vecchi, M. P., 1983. Optimization by simulated annealing. Science, New Series 220(4598), 671-680.
-
(1983)
Science
, vol.220
, Issue.4598
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.D.2
Vecchi, M.P.3
-
8
-
-
0029343602
-
A multi-objective optimization approach to thermal generation units maintenance scheduling
-
Kralj, B. and Petrovic, R., 1995. A multi-objective optimization approach to thermal generation units maintenance scheduling. European Journal of Operational Research, 84(2), 481-493.
-
(1995)
European Journal of Operational Research
, vol.84
, Issue.2
, pp. 481-493
-
-
Kralj, B.1
Petrovic, R.2
-
9
-
-
25844491812
-
A model for preventive maintenance planning by genetic algorithms based in cost and reliability
-
DOI 10.1016/j.ress.2005.01.004, PII S0951832005000414, Selected Papers Presented at QUALITA 2003
-
Lapa, C. M. F., Pereira, C. M. N. A. and De Barros, M. P., 2006. A model for preventive maintenance planning by genetic algorithms based in cost and reliability. Reliability Engineering & System Safety, 91(2), 233-240. (Pubitemid 41394421)
-
(2006)
Reliability Engineering and System Safety
, vol.91
, Issue.2
, pp. 233-240
-
-
Lapa, C.M.F.1
Pereira, C.M.N.A.2
De Barros, M.P.3
-
10
-
-
0034135276
-
Optimizationof imperfect preventive maintenance for multi-state systems
-
Levitin, G. and Lisnianski, A., 2000. Optimizationof imperfect preventive maintenance for multi-state systems. Reliability Engineering & System Safety, 67(2), 193-209.
-
(2000)
Reliability Engineering & System Safety
, vol.67
, Issue.2
, pp. 193-209
-
-
Levitin, G.1
Lisnianski, A.2
-
11
-
-
33646510872
-
Preventive maintenance scheduling by variable dimension evolutionary algorithms
-
Limbourg, P. and Kochs, H. D., 2006. Preventive maintenance scheduling by variable dimension evolutionary algorithms. International Journal of Pressure Vessels and Piping, 83(4), 262-269.
-
(2006)
International Journal of Pressure Vessels and Piping
, vol.83
, Issue.4
, pp. 262-269
-
-
Limbourg, P.1
Kochs, H.D.2
-
12
-
-
0018517702
-
Reliable preventive maintenance scheduling
-
Malik, M. A. K., 1979. Reliable preventive maintenance scheduling. AIIE Transactions, 11(3), 221-228.
-
(1979)
AIIE Transactions
, vol.11
, Issue.3
, pp. 221-228
-
-
Malik, M.A.K.1
-
13
-
-
0024054513
-
Sequential imperfect preventive maintenance policies
-
Nakagawa, T., 1988. Sequential imperfect preventive maintenance policies. IEEE Transactions on Reliability, 37(3), 295-298.
-
(1988)
IEEE Transactions on Reliability
, vol.37
, Issue.3
, pp. 295-298
-
-
Nakagawa, T.1
-
14
-
-
33750731956
-
Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms
-
DOI 10.1016/j.ejor.2005.12.015, PII S0377221705008477
-
Quan, G., Greenwood, G. W., Liu, D. and Hu, S., 2007. Searching for multi-objective preventive maintenance schedules: Combining preferences with evolutionary algorithms. European Journal of Operational Research, 177(3), 1969-1984. (Pubitemid 44709462)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1969-1984
-
-
Quan, G.1
Greenwood, G.W.2
Liu, D.3
Hu, S.4
-
15
-
-
13244255359
-
A genetic algorithm for preventive maintenance scheduling in a multi-unit multi-state system
-
Shalaby, M. A., Gomaa, A. H. and Mohib, A. M., 2004. A genetic algorithm for preventive maintenance scheduling in a multiunit multistate system. Journal of Engineering and Applied Science, 51(4), 795-811. (Pubitemid 40184740)
-
(2004)
Journal of Engineering and Applied Science
, vol.51
, Issue.4
, pp. 795-811
-
-
Shalaby, M.A.1
Gomaa, A.M.2
Mohib, A.M.3
-
16
-
-
33846960196
-
The application of genetic algorithm in the development of preventive maintenance analytic model
-
Shum, Y. S. and Gong, D. C., 2007. The application of genetic algorithm in the development of preventive maintenance analytic model. International Journal of Advanced Manufacturing Technology, 32(1/2), 169-83.
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.32
, Issue.1-2
, pp. 169-183
-
-
Shum, Y.S.1
Gong, D.C.2
-
17
-
-
0035479768
-
Optimizing preventive maintenance for mechanical components using genetic algorithms
-
Tsai, Y. T., Wang, K. S. and Teng, H. Y., 2001. Optimizing preventive maintenance for mechanical components using genetic algorithms. Reliability Engineering and System Safety, 74(1), 89-97.
-
(2001)
Reliability Engineering and System Safety
, vol.74
, Issue.1
, pp. 89-97
-
-
Tsai, Y.T.1
Wang, K.S.2
Teng, H.Y.3
-
18
-
-
0032280892
-
Cost optimal preventive maintenance and replacement scheduling
-
Usher, J. S., Kamal, A. H. and Hashmi, S. W., 1998. Cost optimal preventive maintenance and replacement scheduling. IIE Transactions, 30(12), 1121-1128.
-
(1998)
IIE Transactions
, vol.30
, Issue.12
, pp. 1121-1128
-
-
Usher, J.S.1
Kamal, A.H.2
Hashmi, S.W.3
-
19
-
-
34547411525
-
Multi-objective initial preventive maintenance scheduling for large engineering plants
-
PII S0218539307002611
-
Verma, A. K. and Ramesh, P. G., 2007. Multi-objective initial preventive maintenance scheduling for large engineering plants. International Journal of Reliability, Quality and Safety Engineering, 14(3), 241-250. (Pubitemid 47169625)
-
(2007)
International Journal of Reliability, Quality and Safety Engineering
, vol.14
, Issue.3
, pp. 241-250
-
-
Verma, A.K.1
Ramesh, P.G.2
|