-
1
-
-
0026897390
-
Single machine flow-time scheduling with scheduled maintenance
-
C.Y. Lee and S.D. Liman, "Single machine flow-time scheduling with scheduled maintenance, "Acta Informatica, vol. 29, pp. 375-382, 1992.
-
(1992)
Acta Informatica
, vol.29
, pp. 375-382
-
-
Lee, C.Y.1
Liman, S.D.2
-
2
-
-
0036466573
-
Two-machine flow shops with limited machine availability
-
W. Kubiak, J. Blazewicz, P. Formanowicz, J. Breit and G. Schmidt, "Two-machine flow shops with limited machine availability, " Eur. J. Oper. Res, vol. 136, pp. 528-540, 2002.
-
(2002)
Eur. J. Oper. Res
, vol.136
, pp. 528-540
-
-
Kubiak, W.1
Blazewicz, J.2
Formanowicz, P.3
Breit, J.4
Schmidt, G.5
-
3
-
-
0000541519
-
Machine scheduling with an availability constraint
-
C.Y. Lee, "Machine scheduling with an availability constraint," J. Global Opt, vol. 9, pp. 395-416, 1996.
-
(1996)
J. Global Opt
, vol.9
, pp. 395-416
-
-
Lee, C.Y.1
-
4
-
-
0000049036
-
Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint
-
C.Y. Lee, "Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint, " Oper. Res. Lett, vol. 20, pp. 129-139, 1997.
-
(1997)
Oper. Res. Lett
, vol.20
, pp. 129-139
-
-
Lee, C.Y.1
-
5
-
-
0034206108
-
An improved heuristic for two machine flowshop scheduling with an availability constraint
-
T.C.E.Cheng and G. Wang, "An improved heuristic for two machine flowshop scheduling with an availability constraint," Operations Research Letters, vol. 26, 2000.
-
(2000)
Operations Research Letters
, vol.26
-
-
Cheng, T.C.E.1
Wang, G.2
-
6
-
-
0032671338
-
Scheduling maintenance and semiresumable jobs on a single machine
-
G. H. Graves and C. Y. Lee, "Scheduling maintenance and semiresumable jobs on a single machine," Nav. Res. Logist, vol. 46, no. 7, pp. 845-863, 1999.
-
(1999)
Nav. Res. Logist
, vol.46
, Issue.7
, pp. 845-863
-
-
Graves, G.H.1
Lee, C.Y.2
-
7
-
-
0034159705
-
Scheduling jobs and maintenance activities on parallel machines
-
C. Y. Lee and Z. L. Chen, "Scheduling jobs and maintenance activities on parallel machines," Nav. Res. Logist., vol. 47, no. 2, pp. 145-165, 2000.
-
(2000)
Nav. Res. Logist.
, vol.47
, Issue.2
, pp. 145-165
-
-
Lee, C.Y.1
Chen, Z.L.2
-
8
-
-
0038813446
-
Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
-
C. R. Cassady and E.Kutanoglu, "Minimizing job tardiness using integrated preventive maintenance planning and production scheduling," IIE Transactions, vol. 35, no. 6, pp. 503-513, 2003.
-
(2003)
IIE Transactions
, vol.35
, Issue.6
, pp. 503-513
-
-
Cassady, C.R.1
Kutanoglu, E.2
-
9
-
-
22444439337
-
Integrating preventive maintenance planning and production scheduling for a single machine
-
C. R. Cassady and E.Kutanoglu, "Integrating preventive maintenance planning and production scheduling for a single machine," IIE Transactions, vol. 54, no. 2, pp. 304-309, 2005.
-
(2005)
IIE Transactions
, vol.54
, Issue.2
, pp. 304-309
-
-
Cassady, C.R.1
Kutanoglu, E.2
-
10
-
-
55649106405
-
Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
-
Jin Yulan, Jiang Zuhua and Hou Wenrui, "Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine," The International Journal of Advanced Manufacturing Technology, vol. 39, pp. 954-964, 2008.
-
(2008)
The International Journal of Advanced Manufacturing Technology
, vol.39
, pp. 954-964
-
-
Jin, Y.1
Jiang, Z.2
Hou, W.3
-
11
-
-
0018517702
-
Reliable preventive maintenance scheduling
-
M .A .K. Malik, "Reliable Preventive Maintenance Scheduling," AIIE Transaction, vol. 11 no. 3, pp. 221-228, 1979.
-
(1979)
AIIE Transaction
, vol.11
, Issue.3
, pp. 221-228
-
-
Malik, M.A.K.1
-
12
-
-
33947110348
-
Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances
-
L. Jae-Hak and Park Dong Ho, "Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances," Asia-Pacific Journal of Operational Research, vol. 24, no. 1, pp. 111-124, 2007.
-
(2007)
Asia-Pacific Journal of Operational Research
, vol.24
, Issue.1
, pp. 111-124
-
-
Jae-Hak, L.1
Ho, P.D.2
|