메뉴 건너뛰기




Volumn , Issue , 2010, Pages

Integrated optimization research on preventive maintenance planning and production scheduling

Author keywords

Improvement factor; Integrated Maintenance; Preventive maintenance; Production scheduling

Indexed keywords

ADAPTIVE GENETIC ALGORITHMS; BALANCE POINT; DECISION SUPPORTS; EQUIPMENT FAILURES; IMPROVEMENT FACTORS; INDEPENDENT MODEL; INTEGRATED MAINTENANCE; INTEGRATED MODELS; INTEGRATED OPTIMIZATION; MANUFACTURING SYSTEM; NUMERICAL EXAMPLE; OPTIMAL MAINTENANCE; PREVENTIVE MAINTENANCE PLANNING; PRODUCTION PLANNING; PRODUCTION SCHEDULING; TOTAL COSTS;

EID: 78649425637     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICMSS.2010.5577517     Document Type: Conference Paper
Times cited : (7)

References (12)
  • 1
    • 0026897390 scopus 로고
    • Single machine flow-time scheduling with scheduled maintenance
    • C.Y. Lee and S.D. Liman, "Single machine flow-time scheduling with scheduled maintenance, "Acta Informatica, vol. 29, pp. 375-382, 1992.
    • (1992) Acta Informatica , vol.29 , pp. 375-382
    • Lee, C.Y.1    Liman, S.D.2
  • 3
    • 0000541519 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint
    • C.Y. Lee, "Machine scheduling with an availability constraint," J. Global Opt, vol. 9, pp. 395-416, 1996.
    • (1996) J. Global Opt , vol.9 , pp. 395-416
    • Lee, C.Y.1
  • 4
    • 0000049036 scopus 로고    scopus 로고
    • Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint
    • C.Y. Lee, "Minimizing the makespan in the two machines flowshop scheduling problem with an availability constraint, " Oper. Res. Lett, vol. 20, pp. 129-139, 1997.
    • (1997) Oper. Res. Lett , vol.20 , pp. 129-139
    • Lee, C.Y.1
  • 5
    • 0034206108 scopus 로고    scopus 로고
    • An improved heuristic for two machine flowshop scheduling with an availability constraint
    • T.C.E.Cheng and G. Wang, "An improved heuristic for two machine flowshop scheduling with an availability constraint," Operations Research Letters, vol. 26, 2000.
    • (2000) Operations Research Letters , vol.26
    • Cheng, T.C.E.1    Wang, G.2
  • 6
    • 0032671338 scopus 로고    scopus 로고
    • Scheduling maintenance and semiresumable jobs on a single machine
    • G. H. Graves and C. Y. Lee, "Scheduling maintenance and semiresumable jobs on a single machine," Nav. Res. Logist, vol. 46, no. 7, pp. 845-863, 1999.
    • (1999) Nav. Res. Logist , vol.46 , Issue.7 , pp. 845-863
    • Graves, G.H.1    Lee, C.Y.2
  • 7
    • 0034159705 scopus 로고    scopus 로고
    • Scheduling jobs and maintenance activities on parallel machines
    • C. Y. Lee and Z. L. Chen, "Scheduling jobs and maintenance activities on parallel machines," Nav. Res. Logist., vol. 47, no. 2, pp. 145-165, 2000.
    • (2000) Nav. Res. Logist. , vol.47 , Issue.2 , pp. 145-165
    • Lee, C.Y.1    Chen, Z.L.2
  • 8
    • 0038813446 scopus 로고    scopus 로고
    • Minimizing job tardiness using integrated preventive maintenance planning and production scheduling
    • C. R. Cassady and E.Kutanoglu, "Minimizing job tardiness using integrated preventive maintenance planning and production scheduling," IIE Transactions, vol. 35, no. 6, pp. 503-513, 2003.
    • (2003) IIE Transactions , vol.35 , Issue.6 , pp. 503-513
    • Cassady, C.R.1    Kutanoglu, E.2
  • 9
    • 22444439337 scopus 로고    scopus 로고
    • Integrating preventive maintenance planning and production scheduling for a single machine
    • C. R. Cassady and E.Kutanoglu, "Integrating preventive maintenance planning and production scheduling for a single machine," IIE Transactions, vol. 54, no. 2, pp. 304-309, 2005.
    • (2005) IIE Transactions , vol.54 , Issue.2 , pp. 304-309
    • Cassady, C.R.1    Kutanoglu, E.2
  • 10
    • 55649106405 scopus 로고    scopus 로고
    • Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine
    • Jin Yulan, Jiang Zuhua and Hou Wenrui, "Multi-objective integrated optimization research on preventive maintenance planning and production scheduling for a single machine," The International Journal of Advanced Manufacturing Technology, vol. 39, pp. 954-964, 2008.
    • (2008) The International Journal of Advanced Manufacturing Technology , vol.39 , pp. 954-964
    • Jin, Y.1    Jiang, Z.2    Hou, W.3
  • 11
    • 0018517702 scopus 로고
    • Reliable preventive maintenance scheduling
    • M .A .K. Malik, "Reliable Preventive Maintenance Scheduling," AIIE Transaction, vol. 11 no. 3, pp. 221-228, 1979.
    • (1979) AIIE Transaction , vol.11 , Issue.3 , pp. 221-228
    • Malik, M.A.K.1
  • 12
    • 33947110348 scopus 로고    scopus 로고
    • Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances
    • L. Jae-Hak and Park Dong Ho, "Optimal periodic preventive maintenance schedules with improvement factors depending on number of preventive maintenances," Asia-Pacific Journal of Operational Research, vol. 24, no. 1, pp. 111-124, 2007.
    • (2007) Asia-Pacific Journal of Operational Research , vol.24 , Issue.1 , pp. 111-124
    • Jae-Hak, L.1    Ho, P.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.