Volumn , Issue , 2013, Pages 36-43

Coordination mechanism of maintenance scheduling using modified PSO in a restructured power market

Author keywords

ISO coordination; levelized risk method; loss of load probability; modified particle swarm optimization; power market; power system reliability

Indexed keywords

ISO COORDINATION; LEVELIZED RISK METHOD; MODIFIED PARTICLE SWARM OPTIMIZATION; POWER MARKETS; POWER SYSTEM RELIABILITY;

EID: 84886692215     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SCIS.2013.6613250     Document Type: Conference Paper
Times cited : (8)

References (29)
  • 4
    • 0033907831 scopus 로고    scopus 로고
    • A new genetic algorithm for preventive unit maintenance scheduling of power systems
    • Y. Wang, E. Handschin,"A new genetic algorithm for preventive unit maintenance scheduling of power systems," Int. J. Elect. Power and Energy Syst, vol. 22, no. 4, pp. 343-348, 2000.
    • (2000) Int. J. Elect. Power and Energy Syst , vol.22 , Issue.4 , pp. 343-348
    • Wang, Y.1    Handschin, E.2
  • 5
    • 33947162394 scopus 로고    scopus 로고
    • Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
    • K. P. Dahal, N. Chakpitak, "Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches," Int. J. Elect. Power Syst., Research, vol. 77, no. 7, pp. 771-779, 2007.
    • (2007) Int. J. Elect. Power Syst., Research , vol.77 , Issue.7 , pp. 771-779
    • Dahal, K.P.1    Chakpitak, N.2
  • 6
    • 0029535737 scopus 로고
    • Particle swarm optimization
    • Perth, Australia November 25-December 1
    • J. Kennedy, R. Eberhart," Particle swarm optimization", Proc. of IEEE Int. Conf. on Neural Networks, Perth, Australia, vol. 4, November 25-December 1, pp. 1942-1948, 1995.
    • (1995) Proc. of IEEE Int. Conf. on Neural Networks , vol.4 , pp. 1942-1948
    • Kennedy, J.1    Eberhart, R.2
  • 7
    • 84898910167 scopus 로고    scopus 로고
    • Particle swarm optimizer with neighborhood operator
    • Washington, DC, USA, July 06
    • P. N. Suganthan,"Particle swarm optimizer with neighborhood operator", Proc. of IEEE Int. Conf. on Evolutionary Computation, Washington, DC, USA, July 06, vol. 1, pp. 1958-1962, 1999.
    • (1999) Proc. of IEEE Int. Conf. on Evolutionary Computation , vol.1 , pp. 1958-1962
    • Suganthan, P.N.1
  • 8
    • 83055162310 scopus 로고    scopus 로고
    • Particle swarm optimization with adaptive parameter control and opposition
    • Jin Wang," Particle swarm optimization with adaptive parameter control and opposition", Int. J. of Computational Information Systems, vol. 7, pp. 4463-4470, 2011.
    • (2011) Int. J. of Computational Information Systems , vol.7 , pp. 4463-4470
    • Wang, J.1
  • 9
    • 84942114734 scopus 로고    scopus 로고
    • Particle swarm optimization based approach for generator maintenance scheduling
    • Indianapolis, USA April. 24-26
    • Chin Aik Koay, Dipti Srinivasan," Particle swarm optimization based approach for generator maintenance scheduling", Proc. of Int. Conf. on Swarm Intelligence Symposium (SIS'03), Indianapolis, USA, vol. 1, April. 24-26, pp. 167-173, 2003.
    • (2003) Proc. of Int. Conf. on Swarm Intelligence Symposium (SIS'03) , vol.1 , pp. 167-173
    • Aik Koay, C.1    Srinivasan, D.2
  • 11
    • 2542540525 scopus 로고    scopus 로고
    • Life-cycle maintenance management of generating units in a competitive environment
    • D. Chattopadhyay, "Life-cycle maintenance management of generating units in a competitive environment", IEEE Trans. on Power Syst, vol. 19, no. 2, pp. 1181-1189, 2004.
    • (2004) IEEE Trans. on Power Syst , vol.19 , Issue.2 , pp. 1181-1189
    • Chattopadhyay, D.1
  • 12
    • 0035425559 scopus 로고    scopus 로고
    • A flexible unit maintenance scheduling considering uncertainties
    • R. Leou,"A flexible unit maintenance scheduling considering uncertainties", IEEE Trans. Power Syst, vol. 16, no. 3, pp. 552-559,2001.
    • (2001) IEEE Trans. Power Syst , vol.16 , Issue.3 , pp. 552-559
    • Leou, R.1
  • 13
    • 39749084088 scopus 로고    scopus 로고
    • GENCO's risk-based maintenance outage scheduling
    • Lei Wu, Mohammad Shahidehpour and Tao Li," GENCO's risk-based maintenance outage scheduling", IEEE Trans. on Power Syst, vol. 23, no. 1, pp. 127-136, 2008.
    • (2008) IEEE Trans. on Power Syst , vol.23 , Issue.1 , pp. 127-136
    • Wu, L.1    Shahidehpour, M.2    Li, T.3
  • 14
    • 0037708871 scopus 로고    scopus 로고
    • Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach
    • R. Billinton, A. Abdulwhab, "Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach", IEE Proc. Gener. Trans. Distri., vol. 150, no. 4, pp. 463-468, 2003.
    • (2003) IEE Proc. Gener. Trans. Distri. , vol.150 , Issue.4 , pp. 463-468
    • Billinton, R.1    Abdulwhab, A.2
  • 15
    • 76649118770 scopus 로고    scopus 로고
    • A competitive mechanism of unit maintenance scheduling in a deregulated environment
    • Changyou Feng, Xifan Wang,"A competitive mechanism of unit maintenance scheduling in a deregulated environment", IEEE Trans. on Power Syst, vol. 25, no. 1, pp. 351-359, 2010.
    • (2010) IEEE Trans. on Power Syst , vol.25 , Issue.1 , pp. 351-359
    • Feng, C.1    Wang, X.2
  • 16
    • 18944379628 scopus 로고    scopus 로고
    • Generation maintenance scheduling in restructured power systems
    • Antonio J. Conejo, Raquel García-Bertrand and Raquel García-Bertrand, "Generation maintenance scheduling in restructured power systems", IEEE Trans. Power Syst, vol. 20, no. 2, pp. 984-992, 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.2 , pp. 984-992
    • Conejo, A.J.1    García-Bertrand, R.2    García-Bertrand, R.3
  • 17
    • 65549153160 scopus 로고    scopus 로고
    • Optimal maintenance scheduling of power producers considering unexpected unit failure
    • C. Feng, X. Wang and F. Li, "Optimal maintenance scheduling of power producers considering unexpected unit failure", in Proc. of IET Gen., Transm., Distrib., vol. 5, no. 3, pp. 448-459, 2009.
    • (2009) Proc. of IET Gen., Transm., Distrib. , vol.5 , Issue.3 , pp. 448-459
    • Feng, C.1    Wang, X.2    Li, F.3
  • 18
    • 50249124328 scopus 로고    scopus 로고
    • A novel approach for maintenance scheduling of generating units in a competitive environment
    • New Delhi,India
    • R. Eshraghnia, M. H. Modir Shanechi and H. Rajabi mashhadi, "A novel approach for maintenance scheduling of generating units in a competitive environment ", Proc. of IEEE Int. Conf. On Power System, New Delhi,India, vol. 12, no. 2, pp. 980-988, 2006.
    • (2006) Proc. of IEEE Int. Conf. on Power System , vol.12 , Issue.2 , pp. 980-988
    • Eshraghnia, R.1    Modir Shanechi, M.H.2    Rajabi Mashhadi, H.3
  • 19
    • 79960771046 scopus 로고    scopus 로고
    • ISO coordination of generator maintenance scheduling in competitive electricity markets using simulated annealing
    • Seok-Man Han, Koo-Hyung Chung and Balho H. Kim," ISO coordination of generator maintenance scheduling in competitive electricity markets using simulated annealing", Int. J. Electrical Engineering and Technology, vol. 6, no. 4, pp. 431-438, 2011
    • (2011) Int. J. Electrical Engineering and Technology , vol.6 , Issue.4 , pp. 431-438
    • Han, S.1    Chung, K.2    Kim, B.H.3
  • 20
    • 50249090149 scopus 로고    scopus 로고
    • The effect of energy purchase in maintenance schedule of generating units based on genetic algorithm
    • Athens, Greece, July 27-29
    • Roozbeh Eshraghnia, Mohammad Hasan Modir Shanechi and Reza Riahi,"The effect of energy purchase in maintenance schedule of generating units based on genetic algorithm", Proc. of Int. Conf. on control and automation, Athens, Greece, July 27-29, vol. 1 pp. 1-8, 2007.
    • (2007) Proc. of Int. Conf. on Control and Automation , vol.1 , pp. 1-8
    • Eshraghnia, R.1    Hasan Modir, S.M.2    Riahi, R.3
  • 21
    • 84886695325 scopus 로고    scopus 로고
    • Coordinated maintenance scheduling of Gencos and Transcos in restructured power systems
    • New Delhi, India, April. 24-26
    • T. Geetha, K. Shanti swarup, "Coordinated maintenance scheduling of Gencos and Transcos in restructured power systems", Proc. of Int. Power India Conf, New Delhi, India, April. 24-26, vol. 1, pp. 1-8, 2006.
    • (2006) Proc. of Int. Power India Conf , vol.1 , pp. 1-8
    • Geetha, T.1    Shanti Swarup, K.2
  • 22
    • 77956431834 scopus 로고    scopus 로고
    • A new solution for maintenance scheduling in deregulated environment applying genetic algorithm and Monte Carlo simulation
    • Singapore, June 14-17
    • Moein Manbach, Faezeh Mahdloo and Mahmood-Reza Haghifam, "A new solution for maintenance scheduling in deregulated environment applying genetic algorithm and Monte Carlo simulation", Proc. of IEEE Int. Conf. on Probailistic methods applied to power systems, Singapore, June 14-17, vol. 1, pp. 378-384, 2010.
    • (2010) Proc. of IEEE Int. Conf. on Probailistic Methods Applied to Power Systems , vol.1 , pp. 378-384
    • Manbach, M.1    Mahdloo, F.2    Haghifam, M.3
  • 23
    • 70350534857 scopus 로고    scopus 로고
    • Security coordinted maintenance scheduling in deregulation based on genco contribution to unserved energy
    • Hemantkumar Barot, Kankar Bhattacharya,"Security coordinted maintenance scheduling in deregulation based on genco contribution to unserved energy", IEEE Trans. Power Syst, vol. 23, no. 4, pp. 1871-1882, 2008.
    • (2008) IEEE Trans. Power Syst , vol.23 , Issue.4 , pp. 1871-1882
    • Barot, H.1    Bhattacharya, K.2
  • 24
    • 47149107214 scopus 로고    scopus 로고
    • Unit maintenance scheduling coordination mechanism in electricity market environment
    • Distrib.
    • G. Lu, C. Y. Chung, K. P. Wong and F. Wen, "Unit maintenance scheduling coordination mechanism in electricity market environment", Proc. IET Gener. Transm. Distrib., vol. 2, no. 5, pp. 646-654, 2008.
    • (2008) Proc. IET Gener. Transm , vol.2 , Issue.5 , pp. 646-654
    • Lu, G.1    Chung, C.Y.2    Wong, K.P.3    Wen, F.4
  • 25
    • 37249009539 scopus 로고    scopus 로고
    • Formulating customer's power deficiency for GENCOs to perform third-party supply
    • Le-Ren Chang-Chien, I-Chieh Chu, "Formulating customer's power deficiency for GENCOs to perform third-party supply", Int. J. Elect. Power Syst., Research, vol. 78, no. 2, pp. 171-191, 2008.
    • (2008) Int. J. Elect. Power Syst., Research , vol.78 , Issue.2 , pp. 171-191
    • Chang-Chien, L.1    Chu, I.2
  • 26
    • 71549118540 scopus 로고    scopus 로고
    • Generation adequacy and transmission interconnection in regional electricity markets
    • Mauricio Cepeda, Marcelo Saguan, Dominique Finon and Virginie Pignon,"Generation adequacy and transmission interconnection in regional electricity markets", Int. J. Energy policy, vol. 37, no. 12, pp. 5612-5622, 2009.
    • (2009) Int. J. Energy Policy , vol.37 , Issue.12 , pp. 5612-5622
    • Cepeda, M.1    Saguan, M.2    Finon, D.3    Pignon, V.4
  • 27
    • 0032592961 scopus 로고    scopus 로고
    • The ieee reliability test system-1996
    • Reliability Test System Task Force
    • Reliability Test System Task Force, "The IEEE Reliability Test System-1996", IEEE Trans. Power Syst., vol. 14, no. 3, pp. 1010-1020, 1999.
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.3 , pp. 1010-1020
  • 28
    • 84875219094 scopus 로고    scopus 로고
    • Hybrid improved binary particle swarm optimization approach for generation maintenance scheduling
    • in press, November 2012, ISSN
    • K. Suresh, N. Kumarappan, "Hybrid improved binary particle swarm optimization approach for generation maintenance scheduling", Int. J. Swarm and Evolutionary Computation, in press, November 2012, ISSN 2210-6502, http://dx. doi. org. /10. 1016/j. swevo. 2012. 11. 003.
    • Int. J. Swarm and Evolutionary Computation , pp. 2210-6502
    • Suresh, K.1    Kumarappan, N.2
  • 29
    • 84886642744 scopus 로고    scopus 로고
    • Generation adequacy. Analysis technical methods
    • PJM Electricity market website available on
    • PJM Electricity market website (2005),"Generation Adequacy. Analysis technical methods", PJM White Paper, Section 12, available on http://www. pjm. com
    • (2005) PJM White Paper, Section 12


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.