-
2
-
-
0026203507
-
Optimal generating unit maintenance scheduling for multi-area system with network constraints
-
Aug.
-
L. N. Chen and J. Toyoda, "Optimal generating unit maintenance scheduling for multi-area system with network constraints," IEEE Trans. Power Syst., vol.6, no.3, pp. 1168-1174, Aug. 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, Issue.3
, pp. 1168-1174
-
-
Chen, L.N.1
Toyoda, J.2
-
3
-
-
0032592963
-
Goal programming approach to maintenance scheduling of generating units in large scale power systems
-
Aug.
-
L. Moro and A. Ramos, "Goal programming approach to maintenance scheduling of generating units in large scale power systems," IEEE Trans. Power Syst., vol.14, no.3, pp. 1021-1028, Aug. 1999.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.3
, pp. 1021-1028
-
-
Moro, L.1
Ramos, A.2
-
4
-
-
0026155671
-
Power plant maintenance scheduling: Optimizing economics and reliability
-
May
-
R. Mukerji, H. M. Merrill, B. W. Erickson, and J. H. Parker, "Power plant maintenance scheduling: Optimizing economics and reliability," IEEE Trans. Power Syst., vol.6, no.2, pp. 476-483, May 1991.
-
(1991)
IEEE Trans. Power Syst.
, vol.6
, Issue.2
, pp. 476-483
-
-
Mukerji, R.1
Merrill, H.M.2
Erickson, B.W.3
Parker, J.H.4
-
5
-
-
0034186789
-
Generation maintenance scheduling considering transmission constraints
-
May
-
E. L. da Silva, M. T. Schilling, and M. C. Rafael, "Generation maintenance scheduling considering transmission constraints," IEEE Trans. Power Syst., vol.15, no.2, pp. 838-843, May 2000.
-
(2000)
IEEE Trans. Power Syst.
, vol.15
, Issue.2
, pp. 838-843
-
-
Da Silva, E.L.1
Schilling, M.T.2
Rafael, M.C.3
-
6
-
-
0035425559
-
A flexible unit maintenance scheduling considering uncertainties
-
Aug.
-
R. C. Leou, "A flexible unit maintenance scheduling considering uncertainties," IEEE Trans. Power Syst., vol.16, no.3, pp. 552-559, Aug. 2001.
-
(2001)
IEEE Trans. Power Syst.
, vol.16
, Issue.3
, pp. 552-559
-
-
Leou, R.C.1
-
7
-
-
0037505489
-
Maintenance scheduling of generation and transmission systems using fuzzy evolutionary programming
-
May
-
M. Y. El-Sharkh and A. A. El-Keib, "Maintenance scheduling of generation and transmission systems using fuzzy evolutionary programming," IEEE Trans. Power Syst., vol.18, no.2, pp. 862-866, May 2003.
-
(2003)
IEEE Trans. Power Syst.
, vol.18
, Issue.2
, pp. 862-866
-
-
El-Sharkh, M.Y.1
El-Keib, A.A.2
-
8
-
-
39749162931
-
Genetic algorithm optimization of the maintenance scheduling of generating units in a power system
-
A. Volkanovski, B. Mavko, T. Bosevski, A. Causevski, and M. Cepin, "Genetic algorithm optimization of the maintenance scheduling of generating units in a power system," Reliab. Eng. Syst. Safety, vol.93, pp. 757-767, 2008.
-
(2008)
Reliab. Eng. Syst. Safety
, vol.93
, pp. 757-767
-
-
Volkanovski, A.1
Mavko, B.2
Bosevski, T.3
Causevski, A.4
Cepin, M.5
-
9
-
-
0029305028
-
Transmission constrained maintenance scheduling of generating units: A stochastic programming approach
-
May
-
E. L. Silva, M. Morozowski, L. G. S. Fonseca, G. C. Oliveira, A. C. G. Melo, and J. C. O. Mello, "Transmission constrained maintenance scheduling of generating units: A stochastic programming approach," IEEE Trans. Power Syst., vol.10, no.2, pp. 695-701, May 1995.
-
(1995)
IEEE Trans. Power Syst.
, vol.10
, Issue.2
, pp. 695-701
-
-
Silva, E.L.1
Morozowski, M.2
Fonseca, L.G.S.3
Oliveira, G.C.4
Melo, A.C.G.5
Mello, J.C.O.6
-
10
-
-
0036573601
-
Effective algorithm for handling constraints in generator maintenance scheduling
-
May
-
K. Y. Huang and H. T. Yang, "Effective algorithm for handling constraints in generator maintenance scheduling," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol.149, no.3, pp. 274-282, May 2002.
-
(2002)
Proc. Inst. Elect. Eng., Gen., Transm., Distrib.
, vol.149
, Issue.3
, pp. 274-282
-
-
Huang, K.Y.1
Yang, H.T.2
-
11
-
-
54949110987
-
Optimal generator maintenance scheduling using a modified discrete PSO
-
Jan.
-
Y. Yare, G. K. Venayagamoorthy, and U. O. Aliyu, "Optimal generator maintenance scheduling using a modified discrete PSO," Proc. IET Gen., Transm., Distrib., vol.2, no.6, pp. 834-846, Jan. 2008.
-
(2008)
Proc. IET Gen., Transm., Distrib.
, vol.2
, Issue.6
, pp. 834-846
-
-
Yare, Y.1
Venayagamoorthy, G.K.2
Aliyu, U.O.3
-
12
-
-
33947162394
-
Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches
-
K. P. Dahal and N. Chakpitak, "Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches," Elect. Power Syst. Res., vol.77, pp. 771-779, 2007.
-
(2007)
Elect. Power Syst. Res.
, vol.77
, pp. 771-779
-
-
Dahal, K.P.1
Chakpitak, N.2
-
13
-
-
1042266147
-
Generation capacity adequacy in the competitive electricity market environment
-
F. Wen, F. F. Wu, and Y. Ni, "Generation capacity adequacy in the competitive electricity market environment," Int. J. Elect. Power Energy Syst., vol.26, pp. 365-372, 2004.
-
(2004)
Int. J. Elect. Power Energy Syst.
, vol.26
, pp. 365-372
-
-
Wen, F.1
Wu, F.F.2
Ni, Y.3
-
14
-
-
0037708871
-
Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach
-
Jul.
-
R. Billinton and A. Abdulwhab, "Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol.150, no.4, pp. 463-468, Jul. 2003.
-
(2003)
Proc. Inst. Elect. Eng., Gen., Transm., Distrib.
, vol.150
, Issue.4
, pp. 463-468
-
-
Billinton, R.1
Abdulwhab, A.2
-
15
-
-
0032592928
-
Long-term transmission and generation maintenance scheduling with network, fuel and emission constraints
-
Aug.
-
M. K. C. Marwali and S. M. Shahidehpour, "Long-term transmission and generation maintenance scheduling with network, fuel and emission constraints," IEEE Trans. Power Syst., vol.14, no.3, pp. 1160-1165, Aug. 1999.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.3
, pp. 1160-1165
-
-
Marwali, M.K.C.1
Shahidehpour, S.M.2
-
17
-
-
65549153160
-
Optimal maintenance scheduling of power producers considering unexpected unit failure
-
May
-
C. Feng, X. Wang, and F. Li, "Optimal maintenance scheduling of power producers considering unexpected unit failure," Proc. IET Gen., Transm., Distrib., vol.5, no.3, pp. 448-459, May 2009.
-
(2009)
Proc. IET Gen., Transm., Distrib.
, vol.5
, Issue.3
, pp. 448-459
-
-
Feng, C.1
Wang, X.2
Li, F.3
-
18
-
-
0037505510
-
A new game-theoretic framework for maintenance strategy analysis
-
May
-
J. H. Kim, J. B. Park, J. K. Park, and B. H. Kim, "A new game-theoretic framework for maintenance strategy analysis," IEEE Trans. Power Syst., vol.18, no.2, pp. 698-706, May 2003.
-
(2003)
IEEE Trans. Power Syst.
, vol.18
, Issue.2
, pp. 698-706
-
-
Kim, J.H.1
Park, J.B.2
Park, J.K.3
Kim, B.H.4
-
19
-
-
2542540525
-
Life-cycle maintenance management of generating units in a competitive environment
-
May
-
D. Chattopadhyay, "Life-cycle maintenance management of generating units in a competitive environment," IEEE Trans. Power Syst., vol.19, no.2, pp. 1181-1189, May 2004.
-
(2004)
IEEE Trans. Power Syst.
, vol.19
, Issue.2
, pp. 1181-1189
-
-
Chattopadhyay, D.1
-
20
-
-
39749084088
-
GENCO's risk-based maintenance outage scheduling
-
Feb.
-
L. Wu, M. Shahidehpour, and T. Li, "GENCO's risk-based maintenance outage scheduling," IEEE Trans. Power Syst., vol.23, no.1, pp. 127-136, Feb. 2008.
-
(2008)
IEEE Trans. Power Syst.
, vol.23
, Issue.1
, pp. 127-136
-
-
Wu, L.1
Shahidehpour, M.2
Li, T.3
-
21
-
-
13844309961
-
Composite system maintenance coordination in a deregulated environment
-
Feb.
-
R. Billinton and R. Mo, "Composite system maintenance coordination in a deregulated environment," IEEE Trans. Power Syst., vol.20, no.1, pp. 485-492, Feb. 2005.
-
(2005)
IEEE Trans. Power Syst.
, vol.20
, Issue.1
, pp. 485-492
-
-
Billinton, R.1
Mo, R.2
-
22
-
-
47149107214
-
Unit maintenance scheduling coordination mechanism in electricity market environment
-
Mar.
-
G. Lu, C. Y. Chuang, K. P. Wong, and F. Wen, "Unit maintenance scheduling coordination mechanism in electricity market environment," Proc. IET Gen., Transm., Distrib., vol.5, no.24, pp. 646-654, Mar. 2008.
-
(2008)
Proc. IET Gen., Transm., Distrib.
, vol.5
, Issue.24
, pp. 646-654
-
-
Lu, G.1
Chuang, C.Y.2
Wong, K.P.3
Wen, F.4
-
23
-
-
18944379628
-
Generation maintenance scheduling in restructured power system
-
May
-
A. J. Conejo, R. Garcia-Bertrand, and M. Diaz-Salazar, "Generation maintenance scheduling in restructured power system," IEEE Trans. Power Syst., vol.20, no.2, pp. 984-992, May 2005.
-
(2005)
IEEE Trans. Power Syst.
, vol.20
, Issue.2
, pp. 984-992
-
-
Conejo, A.J.1
Garcia-Bertrand, R.2
Diaz-Salazar, M.3
-
24
-
-
70350534857
-
Security coordinated maintenance scheduling in deregulation based on Genco contribution to unserved energy
-
Nov.
-
H. Barot and K. Bhattacharys, "Security coordinated maintenance scheduling in deregulation based on Genco contribution to unserved energy," IEEE Trans. Power Syst., vol.23, no.4, pp. 1871-1882, Nov. 2008.
-
(2008)
IEEE Trans. Power Syst.
, vol.23
, Issue.4
, pp. 1871-1882
-
-
Barot, H.1
Bhattacharys, K.2
-
25
-
-
33646739568
-
Power system equipment aging
-
May/Jun.
-
W. Li, E. Vaahedi, and P. Choudhury, "Power system equipment aging," IEEE Power Energy Mag., vol.4, no.3, pp. 52-58, May/Jun. 2006.
-
(2006)
IEEE Power Energy Mag.
, vol.4
, Issue.3
, pp. 52-58
-
-
Li, W.1
Vaahedi, E.2
Choudhury, P.3
-
26
-
-
1542315925
-
Predictive maintenance in intelligent-control-maintenance-management system for hydroelectric generating unit
-
Mar.
-
C. Fu, Y. Liu, R. Yu, B. Iung, Y. Cheng, and Y. Zeng, "Predictive maintenance in intelligent-control-maintenance-management system for hydroelectric generating unit," IEEE Trans. Energy Convers., vol.19, no.1, pp. 179-185, Mar. 2004.
-
(2004)
IEEE Trans. Energy Convers.
, vol.19
, Issue.1
, pp. 179-185
-
-
Fu, C.1
Liu, Y.2
Yu, R.3
Iung, B.4
Cheng, Y.5
Zeng, Y.6
-
27
-
-
60149111596
-
Using state diagrams for modeling maintenance of deteriorating systems
-
Feb.
-
T. M.Welte, "Using state diagrams for modeling maintenance of deteriorating systems," IEEE Trans. Power Syst., vol.24, no.1, pp. 58-66, Feb. 2009.
-
(2009)
IEEE Trans. Power Syst.
, vol.24
, Issue.1
, pp. 58-66
-
-
Welte, T.M.1
-
28
-
-
16244421113
-
Development of a riskbased maintenance (RBM) strategy for a power-generating plant
-
L. Krishnasamy, F. I. Khan, and M. Haddara, "Development of a riskbased maintenance (RBM) strategy for a power-generating plant," J. Loss Prevent. Process Ind., vol.18, pp. 69-81, 2005.
-
(2005)
J. Loss Prevent. Process Ind.
, vol.18
, pp. 69-81
-
-
Krishnasamy, L.1
Khan, F.I.2
Haddara, M.3
-
30
-
-
0030109655
-
Evaluation of reliability worth and value of lost load
-
Mar.
-
K. K. Kariuki and R. N. Allan, "Evaluation of reliability worth and value of lost load," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol.143, no.2, pp. 171-180, Mar. 1996.
-
(1996)
Proc. Inst. Elect. Eng., Gen., Transm., Distrib.
, vol.143
, Issue.2
, pp. 171-180
-
-
Kariuki, K.K.1
Allan, R.N.2
-
31
-
-
0032592961
-
The IEEE reliability test system-1996
-
Reliability Test System Task Force, Aug.
-
Reliability Test System Task Force, "The IEEE reliability test system-1996," IEEE Trans. Power Syst., vol.14, no.3, pp. 1010-1020, Aug. 1999.
-
(1999)
IEEE Trans. Power Syst.
, vol.14
, Issue.3
, pp. 1010-1020
-
-
|