2
-
-
0030129053
-
Reserve capacity assessment in small isolated electric power generating systems
-
Billinton, R., and Fotuhi-Firuzabad, M.: 'Reserve capacity assessment in small isolated electric power generating systems', IEE Power Eng. J., 1996, 10, (2), pp. 73-80
-
(1996)
IEE Power Eng. J.
, vol.10
, Issue.2
, pp. 73-80
-
-
Billinton, R.1
Fotuhi-Firuzabad, M.2
-
3
-
-
0032677046
-
Capacity reserve assessment using system wellbeing analysis
-
Billinton, R., and Karki, R.: 'Capacity reserve assessment using system wellbeing analysis', IEEE Trans. Power Sys., 1999, 14, (2), pp. 433-438
-
(1999)
IEEE Trans. Power Sys.
, vol.14
, Issue.2
, pp. 433-438
-
-
Billinton, R.1
Karki, R.2
-
4
-
-
0024719222
-
A reliability test system for educational purposes - Basic data
-
Billinton, R., Kumar, S., Chowdhury, K., Chu, K., Debnath, K., Goel, L., Khan, E., Kos, P., Nourbakhsh, G., and Oteng-Adjei, J.: 'A reliability test system for educational purposes - basic data', IEEE Trans. Power Sys., 1989, 4, (3), pp. 1238-1244
-
(1989)
IEEE Trans. Power Sys.
, vol.4
, Issue.3
, pp. 1238-1244
-
-
Billinton, R.1
Kumar, S.2
Chowdhury, K.3
Chu, K.4
Debnath, K.5
Goel, L.6
Khan, E.7
Kos, P.8
Nourbakhsh, G.9
Oteng-Adjei, J.10
-
5
-
-
0017493313
-
Several objective criteria for optimal generator preventive maintenance scheduling
-
Zurn, H.H., and Quintana, V.H.: 'Several objective criteria for optimal generator preventive maintenance scheduling', IEEE Trans. Power Appar. Syst., 1977, 96, (3), pp. 984-992
-
(1977)
IEEE Trans. Power Appar. Syst.
, vol.96
, Issue.3
, pp. 984-992
-
-
Zurn, H.H.1
Quintana, V.H.2
-
6
-
-
0006844518
-
A method for planning economic unit commitment and maintenance of thermal power systems
-
Hara, K., Kimura, M., and Honda, N.: 'A method for planning economic unit commitment and maintenance of thermal power systems', IEEE Trans. Power Appar. Syst., 1966, 85, (5), pp. 427-346
-
(1966)
IEEE Trans. Power Appar. Syst.
, vol.85
, Issue.5
, pp. 427-346
-
-
Hara, K.1
Kimura, M.2
Honda, N.3
-
7
-
-
9144258950
-
Objective criteria for power plant maintenance scheduling
-
Montreal, 23-24 September
-
Dopazo, J.F., Tuite, E.L., and Merrill, H.M.: 'Objective criteria for power plant maintenance scheduling'. Presented at the 3rd Annual Reliability Engineering Conf. for Electrical Power Industry, Montreal, 23-24 September 1976,
-
(1976)
3rd Annual Reliability Engineering Conf. for Electrical Power Industry
-
-
Dopazo, J.F.1
Tuite, E.L.2
Merrill, H.M.3
-
8
-
-
0015285628
-
A technique for the automated scheduling of the maintenance of generating facilities
-
Christiaanse, W.R., and Palmer, A.H.: 'A technique for the automated scheduling of the maintenance of generating facilities', IEEE Trans. Power Appar. Syst., 1972, 91, (1), pp. 137-144
-
(1972)
IEEE Trans. Power Appar. Syst.
, vol.91
, Issue.1
, pp. 137-144
-
-
Christiaanse, W.R.1
Palmer, A.H.2
-
9
-
-
0015398090
-
Adjusting maintenance schedules to levelize risk
-
Garver, L.L.: 'Adjusting maintenance schedules to levelize risk', IEEE Trans. Power Appar. Syst., 1972, 91, (5), pp. 2057-2063
-
(1972)
IEEE Trans. Power Appar. Syst.
, vol.91
, Issue.5
, pp. 2057-2063
-
-
Garver, L.L.1
-
10
-
-
0017547220
-
Generator maintenance scheduling using simplified frequency and duration reliability criteria
-
Allan, R.N., and Takieddine, F.N.: 'Generator maintenance scheduling using simplified frequency and duration reliability criteria', Proc. IEEE, 1977, 124, (10), pp. 873-880
-
(1977)
Proc. IEEE
, vol.124
, Issue.10
, pp. 873-880
-
-
Allan, R.N.1
Takieddine, F.N.2
-
11
-
-
0018517181
-
Maintenance scheduling of generating facilities
-
Khatib, H.: 'Maintenance scheduling of generating facilities', IEEE Trans. Power Appar. Syst., 1979, 98, (5), pp. 1604-1608
-
(1979)
IEEE Trans. Power Appar. Syst.
, vol.98
, Issue.5
, pp. 1604-1608
-
-
Khatib, H.1
-
12
-
-
0038417353
-
Comparison of methods for generator maintenance scheduling
-
Paper C72 452-1, July
-
Patton, A.D., and Ali, J.: 'Comparison of methods for generator maintenance scheduling'. Paper C72 452-1 Presented at IEEE summer power meeting, July 1972
-
(1972)
IEEE Summer Power Meeting
-
-
Patton, A.D.1
Ali, J.2
-
13
-
-
0020543251
-
Preventive maintenance scheduling in power generation systems using a quantitative risk criterion
-
Billinton, R., and El-Sheikhi, F.: 'Preventive maintenance scheduling in power generation systems using a quantitative risk criterion', Can. Electr. Eng. J., 1983, 8, (1), pp. 28-39
-
(1983)
Can. Electr. Eng. J.
, vol.8
, Issue.1
, pp. 28-39
-
-
Billinton, R.1
El-Sheikhi, F.2
-
14
-
-
0034451132
-
Generating facilities maintenance scheduling using a probabilistic technique
-
6-8 September, Belfast, United Kingdom
-
Billinton, R., and Abdulwhab, A.: 'Generating facilities maintenance scheduling using a probabilistic technique'. Presented at UPEC 2000, 6-8 September 2000, Belfast, United Kingdom
-
(2000)
UPEC 2000
-
-
Billinton, R.1
Abdulwhab, A.2
-
15
-
-
0018544097
-
IEEE reliability test system
-
IEEE Committee Report
-
'IEEE Reliability Test System', IEEE Trans. Power Appar. Syst., 1979, 98, (6), pp. 2047-2054 (IEEE Committee Report)
-
(1979)
IEEE Trans. Power Appar. Syst.
, vol.98
, Issue.6
, pp. 2047-2054
-
-
|