메뉴 건너뛰기




Volumn 150, Issue 4, 2003, Pages 463-468

Short-term generating unit maintenance scheduling in a deregulated power system using a probabilistic approach

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; DEREGULATION; ELECTRIC POWER GENERATION; MONTE CARLO METHODS; PREVENTIVE MAINTENANCE; PROBABILITY;

EID: 0037708871     PISSN: 13502360     EISSN: None     Source Type: Journal    
DOI: 10.1049/ip-gtd:20030401     Document Type: Conference Paper
Times cited : (38)

References (15)
  • 2
    • 0030129053 scopus 로고    scopus 로고
    • Reserve capacity assessment in small isolated electric power generating systems
    • Billinton, R., and Fotuhi-Firuzabad, M.: 'Reserve capacity assessment in small isolated electric power generating systems', IEE Power Eng. J., 1996, 10, (2), pp. 73-80
    • (1996) IEE Power Eng. J. , vol.10 , Issue.2 , pp. 73-80
    • Billinton, R.1    Fotuhi-Firuzabad, M.2
  • 3
    • 0032677046 scopus 로고    scopus 로고
    • Capacity reserve assessment using system wellbeing analysis
    • Billinton, R., and Karki, R.: 'Capacity reserve assessment using system wellbeing analysis', IEEE Trans. Power Sys., 1999, 14, (2), pp. 433-438
    • (1999) IEEE Trans. Power Sys. , vol.14 , Issue.2 , pp. 433-438
    • Billinton, R.1    Karki, R.2
  • 5
    • 0017493313 scopus 로고
    • Several objective criteria for optimal generator preventive maintenance scheduling
    • Zurn, H.H., and Quintana, V.H.: 'Several objective criteria for optimal generator preventive maintenance scheduling', IEEE Trans. Power Appar. Syst., 1977, 96, (3), pp. 984-992
    • (1977) IEEE Trans. Power Appar. Syst. , vol.96 , Issue.3 , pp. 984-992
    • Zurn, H.H.1    Quintana, V.H.2
  • 6
    • 0006844518 scopus 로고
    • A method for planning economic unit commitment and maintenance of thermal power systems
    • Hara, K., Kimura, M., and Honda, N.: 'A method for planning economic unit commitment and maintenance of thermal power systems', IEEE Trans. Power Appar. Syst., 1966, 85, (5), pp. 427-346
    • (1966) IEEE Trans. Power Appar. Syst. , vol.85 , Issue.5 , pp. 427-346
    • Hara, K.1    Kimura, M.2    Honda, N.3
  • 8
    • 0015285628 scopus 로고
    • A technique for the automated scheduling of the maintenance of generating facilities
    • Christiaanse, W.R., and Palmer, A.H.: 'A technique for the automated scheduling of the maintenance of generating facilities', IEEE Trans. Power Appar. Syst., 1972, 91, (1), pp. 137-144
    • (1972) IEEE Trans. Power Appar. Syst. , vol.91 , Issue.1 , pp. 137-144
    • Christiaanse, W.R.1    Palmer, A.H.2
  • 9
    • 0015398090 scopus 로고
    • Adjusting maintenance schedules to levelize risk
    • Garver, L.L.: 'Adjusting maintenance schedules to levelize risk', IEEE Trans. Power Appar. Syst., 1972, 91, (5), pp. 2057-2063
    • (1972) IEEE Trans. Power Appar. Syst. , vol.91 , Issue.5 , pp. 2057-2063
    • Garver, L.L.1
  • 10
    • 0017547220 scopus 로고
    • Generator maintenance scheduling using simplified frequency and duration reliability criteria
    • Allan, R.N., and Takieddine, F.N.: 'Generator maintenance scheduling using simplified frequency and duration reliability criteria', Proc. IEEE, 1977, 124, (10), pp. 873-880
    • (1977) Proc. IEEE , vol.124 , Issue.10 , pp. 873-880
    • Allan, R.N.1    Takieddine, F.N.2
  • 11
    • 0018517181 scopus 로고
    • Maintenance scheduling of generating facilities
    • Khatib, H.: 'Maintenance scheduling of generating facilities', IEEE Trans. Power Appar. Syst., 1979, 98, (5), pp. 1604-1608
    • (1979) IEEE Trans. Power Appar. Syst. , vol.98 , Issue.5 , pp. 1604-1608
    • Khatib, H.1
  • 12
    • 0038417353 scopus 로고
    • Comparison of methods for generator maintenance scheduling
    • Paper C72 452-1, July
    • Patton, A.D., and Ali, J.: 'Comparison of methods for generator maintenance scheduling'. Paper C72 452-1 Presented at IEEE summer power meeting, July 1972
    • (1972) IEEE Summer Power Meeting
    • Patton, A.D.1    Ali, J.2
  • 13
    • 0020543251 scopus 로고
    • Preventive maintenance scheduling in power generation systems using a quantitative risk criterion
    • Billinton, R., and El-Sheikhi, F.: 'Preventive maintenance scheduling in power generation systems using a quantitative risk criterion', Can. Electr. Eng. J., 1983, 8, (1), pp. 28-39
    • (1983) Can. Electr. Eng. J. , vol.8 , Issue.1 , pp. 28-39
    • Billinton, R.1    El-Sheikhi, F.2
  • 14
    • 0034451132 scopus 로고    scopus 로고
    • Generating facilities maintenance scheduling using a probabilistic technique
    • 6-8 September, Belfast, United Kingdom
    • Billinton, R., and Abdulwhab, A.: 'Generating facilities maintenance scheduling using a probabilistic technique'. Presented at UPEC 2000, 6-8 September 2000, Belfast, United Kingdom
    • (2000) UPEC 2000
    • Billinton, R.1    Abdulwhab, A.2
  • 15
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • IEEE Committee Report
    • 'IEEE Reliability Test System', IEEE Trans. Power Appar. Syst., 1979, 98, (6), pp. 2047-2054 (IEEE Committee Report)
    • (1979) IEEE Trans. Power Appar. Syst. , vol.98 , Issue.6 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.