ISO coordination of generator maintenance scheduling in competitive electricity markets using simulated annealing

Author keywords

Competitive electricity market; Generator maintenance scheduling; Independent system operator; Simulated annealing

Indexed keywords

BEST EFFORT; COMBINATORIAL SEARCH; COMPETITIVE ELECTRICITY MARKETS; COORDINATION PROBLEMS; GENERATING UNIT; GENERATOR MAINTENANCE; INDEPENDENT SYSTEM OPERATORS; INSTALLED CAPACITY; MAINTENANCE SCHEDULING; MARKET PARTICIPANTS; OPTIMIZATION METHODOLOGY; PLANNED OUTAGES; PLANNING HORIZONS; TIME PREFERENCES;

EID: 79960771046     PISSN: 19750102     EISSN: None     Source Type: Journal    
DOI: 10.5370/JEET.2011.6.4.431     Document Type: Article
Times cited : (6)

References (14)
  • 5
    • 0031164204 scopus 로고    scopus 로고
    • Generator maintenance scheduling: A fuzzy system approach with genetic enhancement
    • June
    • S. J. Huang, "Generator maintenance scheduling: a fuzzy system approach with genetic enhancement," Electric Power Systems Research, vol. 41, pp. 233-239, June 1997.
    • (1997) Electric Power Systems Research , vol.41 , pp. 233-239
    • Huang, S.J.1
  • 7
    • 0036084789 scopus 로고    scopus 로고
    • Optimizing maintenance scheduling of equipment by element maintenance interval adjustment considering system availability
    • New York, NY, USA, 27-31 January
    • T. Zhang, M. Nakamura, and H. Hatazaki, "Optimizing maintenance scheduling of equipment by element maintenance interval adjustment considering system availability," IEEE/PES Winter Meeting, New York, NY, USA, vol. 1, pp. 205-210, 27-31 January 2002.
    • (2002) IEEE/PES Winter Meeting , vol.1 , pp. 205-210
    • Zhang, T.1    Nakamura, M.2    Hatazaki, H.3
  • 8
    • 0034186789 scopus 로고    scopus 로고
    • Generation maintenance scheduling considering transmission constraints
    • May
    • E.L. da Silva, M.Th. Schilling, and M.C. Rafael, "Generation maintenance scheduling considering transmission constraints," IEEE Transactions on Power Systems, vol. 15, pp. 838-843, May 2000.
    • (2000) IEEE Transactions on Power Systems , vol.15 , pp. 838-843
    • Da Silva, E.L.1    Schilling, M.T.2    Rafael, M.C.3
  • 9
    • 79960761043 scopus 로고    scopus 로고
    • Market rules (Ch. 5 Power System Reliability), [Online] Available
    • Market rules (Ch. 5 Power System Reliability), Market entry, maintenance & exit manual, and System operations manual, [Online] Available: http://www.theimo.com/ imoweb/manuals/marketdocs.asp, 2004.
    • (2004) Market Entry, Maintenance & Exit Manual, and System Operations Manual
  • 13
    • 0026153980 scopus 로고
    • Maintenance scheduling by using simulated annealing method
    • , May
    • T. Satoh and K. Nara, "Maintenance scheduling by using simulated annealing method," IEEE Transactions on Power Systems, vol. 6, pp. 850-857, May 1991.
    • (1991) IEEE Transactions on Power Systems , vol.6 , pp. 850-857
    • Satoh, T.1    Nara, K.2
  • 14
    • 79960781625 scopus 로고    scopus 로고
    • A regulation for congestion of generator maintenance in a deregulated system
    • Bologna, Italy, 23-26 June
    • L. Cai and B. Wu, "A regulation for congestion of generator maintenance in a deregulated system," IEEE Bologna PowerTech Conf., Bologna, Italy, vol. 4, pp. 430-434, 23-26 June 2003.
    • (2003) IEEE Bologna PowerTech Conf. , vol.4 , pp. 430-434
    • Cai, L.1    Wu, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.