메뉴 건너뛰기




Volumn 22, Issue 5, 2000, Pages 343-348

New genetic algorithm for preventive unit maintenance scheduling of power systems

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; GENETIC ALGORITHMS; MATHEMATICAL MODELS; OPTIMIZATION; PREVENTIVE MAINTENANCE; PROBLEM SOLVING; SCHEDULING;

EID: 0033907831     PISSN: 01420615     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0142-0615(99)00062-9     Document Type: Article
Times cited : (78)

References (10)
  • 4
    • 0026153980 scopus 로고
    • Maintenance scheduling by using simulated annealing method
    • Satoh T., Nara K. Maintenance scheduling by using simulated annealing method. IEEE Transactions on Power Systems. 6:(2):1991;850-856.
    • (1991) IEEE Transactions on Power Systems , vol.6 , Issue.2 , pp. 850-856
    • Satoh, T.1    Nara, K.2
  • 7
    • 0032024826 scopus 로고    scopus 로고
    • A genetic-evolved fuzzy system for maintenance scheduling of generating units
    • Huang Shyh-Jier. A genetic-evolved fuzzy system for maintenance scheduling of generating units. International Journal of Electrical Power and Energy Systems. 20:(3):1998;191-195.
    • (1998) International Journal of Electrical Power and Energy Systems , vol.20 , Issue.3 , pp. 191-195
    • Huang, S.-J.1
  • 10
    • 0031999188 scopus 로고    scopus 로고
    • Optimal reactive power planning using evolutionary algorithms: A comparative study for evolutionary programming, evolutionary strategy, genetic algorithm, and linear programming
    • Lee K.Y., Yang F.F. Optimal reactive power planning using evolutionary algorithms: a comparative study for evolutionary programming, evolutionary strategy, genetic algorithm, and linear programming. IEEE Transactions on Power Systems. 13:(1):1998;101-108.
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.1 , pp. 101-108
    • Lee, K.Y.1    Yang, F.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.