메뉴 건너뛰기




Volumn 31, Issue 6, 2013, Pages 528-541

Integration of safety risk data with highway construction schedules

Author keywords

Decision support systems; occupational health and safety; risk management; scheduling

Indexed keywords

CONCURRENT ACTIVITIES; DECISION SUPPORT TOOLS; DESIGN AND PLANNING; HIGHWAY CONSTRUCTION; MAINTENANCE SECTORS; OCCUPATIONAL HEALTH AND SAFETY; SAFETY RISK ASSESSMENTS; TEMPORAL AND SPATIAL;

EID: 84884291265     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446193.2012.739288     Document Type: Article
Times cited : (35)

References (81)
  • 2
    • 3543109427 scopus 로고
    • Evaluating decision support systems: a general framework and case study
    • In: Andriole S.J., editors Wellesley, MA, Wellesley, MA,: QED Information Systems
    • Adelman, L. and Donnell, M.L. 1986. " Evaluating decision support systems: a general framework and case study ". In Microcomputer Decision Support Systems, Edited by: Andriole, S.J. 285 - 309. Wellesley, MA: QED Information Systems.
    • (1986) Microcomputer Decision Support Systems , pp. 285-309
    • Adelman, L.1    Donnell, M.L.2
  • 4
    • 0002411207 scopus 로고
    • Evaluating expert system technology
    • In: Andriole S.J., Halpin S.M., editors New York, New York,: IEEE Press
    • Adelman, L. and Ulvila, J.W. 1991. " Evaluating expert system technology ". In Information Technology for Command and Control, Edited by: Andriole, S.J. and Halpin, S.M. 537 - 47. New York: IEEE Press.
    • (1991) Information Technology for Command and Control , pp. 537-547
    • Adelman, L.1    Ulvila, J.W.2
  • 8
    • 0020190720 scopus 로고
    • Group confidence pressures in iterative decisions
    • Boje, D.M. and Murnighan, J.K. 1982. Group confidence pressures in iterative decisions. Management Science, 28 (10): 1187 - 96.
    • (1982) Management Science , vol.28 , Issue.10 , pp. 1187-1196
    • Boje, D.M.1    Murnighan, J.K.2
  • 9
    • 33646174810 scopus 로고
    • Risk management and assessment
    • in Brauer, R.L., Van Nostrand Reinhold, New York
    • Brauer, R.L. (1994) Risk management and assessment, in Brauer, R.L. Safety and Health for Engineers, Van Nostrand Reinhold, New York, pp. 645-64.
    • (1994) Safety and Health for Engineers , pp. 645-664
    • Brauer, R.L.1
  • 10
    • 0003283954 scopus 로고
    • The performance of forecasting groups in computer dialogue and face-to-face discussion
    • In: Linstone H.A., Turloff M., editors Reading, MA, Reading, MA,: Addison-Wesley
    • Brockhoff, K. 1975. " The performance of forecasting groups in computer dialogue and face-to-face discussion ". In The Delphi Method: Techniques and Applications, Edited by: Linstone, H.A. and Turloff, M. 291 - 321. Reading, MA: Addison-Wesley.
    • (1975) The Delphi Method: Techniques and Applications , pp. 291-321
    • Brockhoff, K.1
  • 11
    • 0007048756 scopus 로고    scopus 로고
    • Serious and fatal injuries to workers on highway construction projects
    • Bryden, J.E. and Andrew, L. 1999. Serious and fatal injuries to workers on highway construction projects. Transportation Research Record, 1657: 42 - 7.
    • (1999) Transportation Research Record , vol.1657 , pp. 42-47
    • Bryden, J.E.1    Andrew, L.2
  • 12
  • 14
    • 0035255381 scopus 로고    scopus 로고
    • Algorithm for the implementation of safety improvement programs
    • Cagno, E., Giulio, A.D. and Trucco, A. 2001. Algorithm for the implementation of safety improvement programs. Safety Science, 37: 59 - 75.
    • (2001) Safety Science , vol.37 , pp. 59-75
    • Cagno, E.1    Giulio, A.D.2    Trucco, A.3
  • 16
    • 70349361763 scopus 로고    scopus 로고
    • Center for Construction Research and Training, Silver Spring, MD, Silver Spring, MD,: Center for Construction Research and Training
    • Center for Construction Research and Training. 2008. Construction Chartbook, Silver Spring, MD: Center for Construction Research and Training.
    • (2008) Construction Chartbook
  • 17
    • 84884291003 scopus 로고    scopus 로고
    • Scheduling for construction safety
    • In: Coble R.J., Hinze J., Haupt T.C., editors NJ, NJ,: Prentice Hall, Englewood Cliffs
    • Coble, R.J. and Elliott, R.B. 2000. " Scheduling for construction safety ". In Construction Safety and Health Management, Edited by: Coble, R.J., Hinze, J. and Haupt, T.C. 43 - 57. NJ: Prentice Hall, Englewood Cliffs.
    • (2000) Construction Safety and Health Management , pp. 43-57
    • Coble, R.J.1    Elliott, R.B.2
  • 18
  • 19
    • 33144474642 scopus 로고    scopus 로고
    • On making the right choice. the deliberation-without-attention effect
    • Dijksterhuis, A., Bos, M.W., Nordgren, L.F. and von Baaren, R.B. 2006. On making the right choice. the deliberation-without-attention effect. Science, 311: 1005 - 7.
    • (2006) Science , vol.311 , pp. 1005-1007
    • Dijksterhuis, A.1    Bos, M.W.2    Nordgren, L.F.3    von Baaren, R.B.4
  • 20
    • 0001073758 scopus 로고
    • Building theories from case study research
    • Eisenhardt, K.M. 1989. Building theories from case study research. Academy of Management Review, 14 (4): 532 - 50.
    • (1989) Academy of Management Review , vol.14 , Issue.4 , pp. 532-550
    • Eisenhardt, K.M.1
  • 21
    • 84884280191 scopus 로고    scopus 로고
    • Using network analysis to model fall hazards on construction projects
    • in Tjandra, K. (ed.), CIB W099, Washington, DC, 24-26 August
    • Esmaeili, B. and Hallowell, M.R. (2011) Using network analysis to model fall hazards on construction projects, in Tjandra, K. (ed.) Proceedings of Safety and Health in Construction, CIB W099, Washington, DC, 24-26 August.
    • (2011) Proceedings of Safety and Health in Construction
    • Esmaeili, B.1    Hallowell, M.R.2
  • 23
    • 84866260972 scopus 로고    scopus 로고
    • Attribute safety risk model for measuring safety risk of struck-by accidents
    • in Cai, H., Kandil, A., Hastak, M. and Dunston, P.S. (eds), West Lafayette, 21-23 May
    • Esmaeili, B. and Hallowell, M.R. (2012b) Attribute safety risk model for measuring safety risk of struck-by accidents, in Cai, H., Kandil, A., Hastak, M. and Dunston, P.S. (eds) Proceedings of The 2012 Construction Research Congress (CRC), West Lafayette, 21-23 May.
    • (2012) Proceedings of The 2012 Construction Research Congress (CRC)
    • Esmaeili, B.1    Hallowell, M.R.2
  • 24
    • 77956306541 scopus 로고    scopus 로고
    • Federal Highway Administration, West Lafayette, 21-23 May
    • Federal Highway Administration (2004) Work zone safety facts and statistics, updated on 24 December 2004, available at http://goo.gl/X7crE (accessed February 2012).
    • (2004) Work zone safety facts and statisticsx
  • 27
    • 18844379643 scopus 로고    scopus 로고
    • The quality of accident and health data in the construction industry: interviews with senior managers
    • Gyi, D.E., Gibb, A.G.F. and Haslam, R.A. 1999. The quality of accident and health data in the construction industry: interviews with senior managers. Construction Management and Economics, 17: 197 - 204.
    • (1999) Construction Management and Economics , vol.17 , pp. 197-204
    • Gyi, D.E.1    Gibb, A.G.F.2    Haslam, R.A.3
  • 33
    • 0035392728 scopus 로고    scopus 로고
    • Approaches for making risk-based go/no-go decision for international projects
    • Han, S.H. and Diekmann, J.E. 2001. Approaches for making risk-based go/no-go decision for international projects. ASCE Journal of Construction Engineering and Management, 127 (4): 300 - 8.
    • (2001) ASCE Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 300-308
    • Han, S.H.1    Diekmann, J.E.2
  • 35
    • 34248435160 scopus 로고
    • Group versus individual performance
    • Hill, G.W. 1982. Group versus individual performance. Psychological Bulletin, 91: 517 - 39.
    • (1982) Psychological Bulletin , vol.91 , pp. 517-539
    • Hill, G.W.1
  • 36
    • 84884288985 scopus 로고    scopus 로고
    • Software integration of safety in construction schedules
    • in Haupt, T.C. and Smallwood, J. (eds), Rethinking and Revitalizing Construction Safety, Health, Environment and Quality, Port Elizabeth, South, Africa, 16-17 May
    • Hinze, J., Nelson, J. and Evans, R. (2005) Software integration of safety in construction schedules, in Haupt, T.C. and Smallwood, J. (eds) Proceedings of the 4th Triennial International Conference, Rethinking and Revitalizing Construction Safety, Health, Environment and Quality, Port Elizabeth, South, Africa, 16-17 May, pp. 212-22.
    • (2005) Proceedings of the 4th Triennial International Conference , pp. 212-222
    • Hinze, J.1    Nelson, J.2    Evans, R.3
  • 39
    • 0000140324 scopus 로고
    • The Delphi process in marketing decision making
    • Jolson, M.A. and Rossow, G. 1971. The Delphi process in marketing decision making. Journal of Marketing Research, 8: 443 - 8.
    • (1971) Journal of Marketing Research , vol.8 , pp. 443-448
    • Jolson, M.A.1    Rossow, G.2
  • 41
    • 0019540987 scopus 로고
    • On the quantitative definition of risk
    • Kaplan, S. and Garrick, B.J. 1981. On the quantitative definition of risk. Risk Analysis, 1 (1): 11 - 28.
    • (1981) Risk Analysis , vol.1 , Issue.1 , pp. 11-28
    • Kaplan, S.1    Garrick, B.J.2
  • 42
    • 0000575151 scopus 로고    scopus 로고
    • Integrating safety and health performance into construction CPM
    • Kartam, N. 1997. Integrating safety and health performance into construction CPM. ASCE Journal of Construction Engineering and Management, 123 (2): 121 - 6.
    • (1997) ASCE Journal of Construction Engineering and Management , vol.123 , Issue.2 , pp. 121-126
    • Kartam, N.1
  • 44
    • 0034324916 scopus 로고    scopus 로고
    • Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
    • Leu, S.S., Yang, C.H. and Huang, J.C. 2000. Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Automation in Construction, 10 (1): 27 - 41.
    • (2000) Automation in Construction , vol.10 , Issue.1 , pp. 27-41
    • Leu, S.S.1    Yang, C.H.2    Huang, J.C.3
  • 47
    • 32144432797 scopus 로고    scopus 로고
    • Sustainable construction and drivers of change in Greece. a Delphi study
    • Manoliadis, O., Tsolas, O. and Nakou, A. 2006. Sustainable construction and drivers of change in Greece. a Delphi study. Construction Management and Economics, 24 (2): 113 - 20.
    • (2006) Construction Management and Economics , vol.24 , Issue.2 , pp. 113-120
    • Manoliadis, O.1    Tsolas, O.2    Nakou, A.3
  • 48
    • 77951093318 scopus 로고    scopus 로고
    • An approach for determining the extent of contribution of construction project features to accident causation
    • Manu, P., Ankrah, N., Proverbs, D. and Suresh, S. 2010. An approach for determining the extent of contribution of construction project features to accident causation. Safety Science, 48 (6): 687 - 92.
    • (2010) Safety Science , vol.48 , Issue.6 , pp. 687-692
    • Manu, P.1    Ankrah, N.2    Proverbs, D.3    Suresh, S.4
  • 49
    • 0014745850 scopus 로고
    • The precision of Delphi estimates
    • Martino, J. 1970. The precision of Delphi estimates. Technological Forecasting, 1 (3): 293 - 299.
    • (1970) Technological Forecasting , vol.1 , Issue.3 , pp. 293-299
    • Martino, J.1
  • 51
  • 54
    • 84884284739 scopus 로고    scopus 로고
    • National Institute of Occupational Safety and Health, Fatality Assessment and Control Evaluation (FACE) program (n.d.), available at (accessed February 2012)
    • National Institute of Occupational Safety and Health, Fatality Assessment and Control Evaluation (FACE) program (n.d.) NIOSH FACE reports indexed by industry or cause of fatality, available at http://goo.gl/CYHuw (accessed February 2012).
    • NIOSH FACE reports indexed by industry or cause of fatality
  • 55
    • 33745297554 scopus 로고    scopus 로고
    • Model for automated monitoring of fall hazards in building construction
    • Navon, R. and Kolton, O. 2006. Model for automated monitoring of fall hazards in building construction. Journal of Construction Engineering and Management, 132 (7): 733 - 40.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.7 , pp. 733-740
    • Navon, R.1    Kolton, O.2
  • 56
    • 33845772861 scopus 로고    scopus 로고
    • Algorithms for automated monitoring and control of fall hazards
    • Navon, R. and Kolton, O. 2007. Algorithms for automated monitoring and control of fall hazards. ASCE Journal of Computing in Civil Engineering, 21 (1): 21 - 8.
    • (2007) ASCE Journal of Computing in Civil Engineering , vol.21 , Issue.1 , pp. 21-28
    • Navon, R.1    Kolton, O.2
  • 57
    • 84884284351 scopus 로고    scopus 로고
    • Occupational Safety and Health Administration Integrated Management Information System (OSHA IMIS) (n.d.), available at (accessed February 2012)
    • Occupational Safety and Health Administration Integrated Management Information System (OSHA IMIS) (n.d.) Statistics and Data, Standard Industry Classification (SIC) system search, available at http://goo.gl/iC2dV (accessed February 2012).
    • Statistics and Data, Standard Industry Classification (SIC) system search
  • 58
    • 38649114333 scopus 로고    scopus 로고
    • An integrated decision support system for dealing with time extension claims in construction projects
    • Palaneeswaran, E. and Kumaraswamy, M.M. 2008. An integrated decision support system for dealing with time extension claims in construction projects. Automation in Construction, 17 (4): 425 - 38.
    • (2008) Automation in Construction , vol.17 , Issue.4 , pp. 425-438
    • Palaneeswaran, E.1    Kumaraswamy, M.M.2
  • 61
    • 70349328427 scopus 로고    scopus 로고
    • Development and initial validation of sustainable construction safety and health rating system
    • Rajendran, S. and Gambatese, J.A. 2009. Development and initial validation of sustainable construction safety and health rating system. ASCE Journal of Construction Engineering and Management, 135 (10): 1067 - 75.
    • (2009) ASCE Journal of Construction Engineering and Management , vol.135 , Issue.10 , pp. 1067-1075
    • Rajendran, S.1    Gambatese, J.A.2
  • 62
    • 0000895370 scopus 로고    scopus 로고
    • The Delphi technique as a forecasting tool: issues and analysis
    • Rowe, G. and Wright, G. 1999. The Delphi technique as a forecasting tool: issues and analysis. International Journal of Forecasting, 15: 353 - 75.
    • (1999) International Journal of Forecasting , vol.15 , pp. 353-375
    • Rowe, G.1    Wright, G.2
  • 63
    • 70449348754 scopus 로고    scopus 로고
    • CHASTE': construction hazard assessment with spatial and temporal exposure
    • Rozenfeld, O., Sacks, R. and Rosenfeld, Y. 2009. 'CHASTE': construction hazard assessment with spatial and temporal exposure. Construction Management and Economics, 27 (7): 625 - 38.
    • (2009) Construction Management and Economics , vol.27 , Issue.7 , pp. 625-638
    • Rozenfeld, O.1    Sacks, R.2    Rosenfeld, Y.3
  • 72
    • 0025038691 scopus 로고
    • Safety and health in the construction industry
    • Snashall, D. 1990. Safety and health in the construction industry. British Medical Journal, 301: 563 - 4.
    • (1990) British Medical Journal , vol.301 , pp. 563-564
    • Snashall, D.1
  • 73
    • 22944483650 scopus 로고    scopus 로고
    • Construction project safety planning
    • Szymberski, R. 1997. Construction project safety planning. TAPPI Journal, 80 (11): 69 - 74.
    • (1997) TAPPI Journal , vol.80 , Issue.11 , pp. 69-74
    • Szymberski, R.1
  • 77
    • 0016264378 scopus 로고
    • Judgment under uncertainty: heuristics and biases
    • Tversky, A. and Kahneman, D. 1974. Judgment under uncertainty: heuristics and biases. Science, New Series, 185 (4157): 1124 - 31.
    • (1974) Science, New Series , vol.185 , Issue.4157 , pp. 1124-1131
    • Tversky, A.1    Kahneman, D.2
  • 78
    • 33644667825 scopus 로고    scopus 로고
    • Simulation-based safety evaluation model integrated with network schedule
    • Wang, W.C., Liu, J.J. and Chou, S.C. 2006. Simulation-based safety evaluation model integrated with network schedule. Automation in Construction, 15: 341 - 54.
    • (2006) Automation in Construction , vol.15 , pp. 341-354
    • Wang, W.C.1    Liu, J.J.2    Chou, S.C.3
  • 80
    • 33646753383 scopus 로고    scopus 로고
    • Scheduling-based risk estimation and safety planning for construction projects
    • Yi, K. and Langford, D. 2006. Scheduling-based risk estimation and safety planning for construction projects. ASCE Journal of Construction Engineering and Management, 132 (6): 626 - 35.
    • (2006) ASCE Journal of Construction Engineering and Management , vol.132 , Issue.6 , pp. 626-635
    • Yi, K.1    Langford, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.