메뉴 건너뛰기




Volumn 15, Issue 3, 2006, Pages 341-354

Simulation-based safety evaluation model integrated with network schedule

Author keywords

Accident cost; Construction safety; Schedule control; Simulation; Uncertainty

Indexed keywords

COMPUTER SIMULATION; MATHEMATICAL MODELS; PROJECT MANAGEMENT; RISK MANAGEMENT; SCHEDULING;

EID: 33644667825     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2005.06.015     Document Type: Article
Times cited : (76)

References (22)
  • 1
    • 2942607866 scopus 로고
    • A survey of construction site safety in Honduras
    • E.J. Jaselskis, and G.A.R. Suazo A survey of construction site safety in Honduras Constr. Manag. Econ. 12 1994 245 255
    • (1994) Constr. Manag. Econ. , vol.12 , pp. 245-255
    • Jaselskis, E.J.1    Suazo, G.A.R.2
  • 2
    • 0008503342 scopus 로고
    • Serious occupational accidents in the construction industry
    • S. Salminen Serious occupational accidents in the construction industry Constr. Manag. Econ. 13 1995 299 306
    • (1995) Constr. Manag. Econ. , vol.13 , pp. 299-306
    • Salminen, S.1
  • 3
    • 0002808790 scopus 로고    scopus 로고
    • Effectiveness of safety management strategies on safety performance in Hong Kong
    • C.M. Tam, and I.W.H. Fung Effectiveness of safety management strategies on safety performance in Hong Kong Constr. Manag. Econ. 16 1998 49 55
    • (1998) Constr. Manag. Econ. , vol.16 , pp. 49-55
    • Tam, C.M.1    Fung, I.W.H.2
  • 5
    • 1842842991 scopus 로고    scopus 로고
    • Safety and production: An integrated planning and control model
    • T.A. Saurin, C.T. Formoso, and L.B.M. Guimaraes Safety and production: an integrated planning and control model Constr. Manag. Econ. 22 2004 159 169
    • (2004) Constr. Manag. Econ. , vol.22 , pp. 159-169
    • Saurin, T.A.1    Formoso, C.T.2    Guimaraes, L.B.M.3
  • 6
    • 0000575151 scopus 로고    scopus 로고
    • Integrating safety and health performance into construction CPM
    • N.A. Kartam Integrating safety and health performance into construction CPM J. Constr. Eng. Manag., ASCE 123 2 1997 121 126
    • (1997) J. Constr. Eng. Manag., ASCE , vol.123 , Issue.2 , pp. 121-126
    • Kartam, N.A.1
  • 8
    • 0032649287 scopus 로고    scopus 로고
    • Factors affecting safety performance on construction sites
    • E. Sawacha, S. Naoum, and D. Fong Factors affecting safety performance on construction sites Int. J. Proj. Manag. 17 5 1999 309 315
    • (1999) Int. J. Proj. Manag. , vol.17 , Issue.5 , pp. 309-315
    • Sawacha, E.1    Naoum, S.2    Fong, D.3
  • 9
    • 0344667726 scopus 로고    scopus 로고
    • Factors analysis-based studies on construction workplace safety management in China
    • D.P. Fang, F. Xie, X.Y. Huang, and H. Li Factors analysis-based studies on construction workplace safety management in China Int. J. Proj. Manag. 22 2004 43 49
    • (2004) Int. J. Proj. Manag. , vol.22 , pp. 43-49
    • Fang, D.P.1    Xie, F.2    Huang, X.Y.3    Li, H.4
  • 10
    • 0022886835 scopus 로고
    • Assessment of safety performance measures at construction sites
    • A. Laufer, and W.B. Ledbetter Assessment of safety performance measures at construction sites J. Constr. Eng. Manag., ASCE 112 4 1986 530 542
    • (1986) J. Constr. Eng. Manag., ASCE , vol.112 , Issue.4 , pp. 530-542
    • Laufer, A.1    Ledbetter, W.B.2
  • 11
    • 0029470506 scopus 로고
    • Experience modification rating as measure of safety performance
    • J. Hinze, D.C. Bren, and N. Piepho Experience modification rating as measure of safety performance J. Constr. Eng. Manag., ASCE 121 4 1995 455 458
    • (1995) J. Constr. Eng. Manag., ASCE , vol.121 , Issue.4 , pp. 455-458
    • Hinze, J.1    Bren, D.C.2    Piepho, N.3
  • 14
    • 0029747849 scopus 로고    scopus 로고
    • Strategies for achieving excellence in construction safety performance
    • E.J. Jaselskis, S.D. Anderson, and J.S. Russell Strategies for achieving excellence in construction safety performance J. Constr. Eng. Manag., ASCE 122 1 1996 61 70
    • (1996) J. Constr. Eng. Manag., ASCE , vol.122 , Issue.1 , pp. 61-70
    • Jaselskis, E.J.1    Anderson, S.D.2    Russell, J.S.3
  • 16
    • 0043278302 scopus 로고    scopus 로고
    • Cost of accidents and injuries to the construction industry
    • J.G. Everett, and P.B. Frank Cost of accidents and injuries to the construction industry J. Constr. Eng. Manag., ASCE 122 2 1996 158 164
    • (1996) J. Constr. Eng. Manag., ASCE , vol.122 , Issue.2 , pp. 158-164
    • Everett, J.G.1    Frank, P.B.2
  • 17
    • 0032593172 scopus 로고    scopus 로고
    • Designing for construction worker safety
    • J. Gambatese, and J. Hinze Designing for construction worker safety Autom. Constr. 8 1999 643 649
    • (1999) Autom. Constr. , vol.8 , pp. 643-649
    • Gambatese, J.1    Hinze, J.2
  • 20
    • 0034322763 scopus 로고    scopus 로고
    • Model for evaluating networks under correlated uncertainty-NETCOR
    • W.C. Wang, and L.A. Demsetz Model for evaluating networks under correlated uncertainty-NETCOR J. Constr. Eng. Manag., ASCE 126 6 2000 458 466
    • (2000) J. Constr. Eng. Manag., ASCE , vol.126 , Issue.6 , pp. 458-466
    • Wang, W.C.1    Demsetz, L.A.2
  • 21
    • 33644696457 scopus 로고
    • Investigation of occupational accident cost for the Taiwan's construction industry
    • Institute of Occupational Safety and Health (IOSH)
    • IOSH, Investigation of Occupational Accident Cost for the Taiwan's Construction Industry (in Chinese), Research Report, Institute of Occupational Safety and Health (IOSH) (1995).
    • (1995) Research Report


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.