메뉴 건너뛰기




Volumn , Issue , 2012, Pages 289-298

Attribute-based risk model for measuring safety risk of struck-by accidents

Author keywords

[No Author keywords available]

Indexed keywords

ANALYSIS METHOD; BUILDING INFORMATION MODEL - BIM; FATAL INJURY; HEAVY EQUIPMENT; PLANNING PHASIS; PRE-CONSTRUCTION; PROJECT DESIGNS; RELATIVE RISKS; RISK IDENTIFICATION; RISK MODEL; SAFETY MANAGEMENT; SAFETY RISKS; SPECIFIC ACTIVITY;

EID: 84866260972     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/9780784412329.030     Document Type: Conference Paper
Times cited : (30)

References (22)
  • 1
    • 33646197919 scopus 로고    scopus 로고
    • Comparative injury and fatality risk analysis of building trades
    • Baradan, S., and Usmen, M. A., (2006), "Comparative injury and fatality risk analysis of building trades." Journal of Construction Engineering and Management, 132(5), 533-539.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.5 , pp. 533-539
    • Baradan, S.1    Usmen, M.A.2
  • 4
    • 84873725099 scopus 로고    scopus 로고
    • Diffusion of safety innovations in the construction industry
    • ASCE doi:10.1061/(ASCE)CO.1943-7862.0000499 (published online ahead of print)
    • Esmaeili, B., and Hallowell, M.R. (2011a) "Diffusion of safety innovations in the construction industry." Journal of Construction Engineering and Management, ASCE doi:10.1061/(ASCE)CO.1943-7862.0000499 (published online ahead of print).
    • (2011) Journal of Construction Engineering and Management
    • Esmaeili, B.1    Hallowell, M.R.2
  • 5
    • 84974687200 scopus 로고    scopus 로고
    • Using network analysis to model fall hazards on construction projects
    • August 24 - 26 2011, Washington DC
    • Esmaeili, B., Hallowell, M. R., (2011b). "Using network analysis to model fall hazards on construction projects," Safety and Health in Construction, CIB W099, August 24 - 26 2011, Washington DC.
    • (2011) Safety and Health in Construction, CIB W099
    • Esmaeili, B.1    Hallowell, M.R.2
  • 6
    • 84866263100 scopus 로고    scopus 로고
    • A decision support tool for integrating safety risk with project schedules
    • August 24 - 26 2011, Washington DC
    • Esmaeili, B., Hallowell, M. R., (2011c). "A decision support tool for integrating safety risk with project schedules," Safety and Health in Construction, CIB W099, August 24 - 26 2011, Washington DC.
    • (2011) Safety and Health in Construction, CIB W099
    • Esmaeili, B.1    Hallowell, M.R.2
  • 8
    • 80051729841 scopus 로고    scopus 로고
    • Risk-based framework for safety investment in construction organizations
    • Hallowell, M. R. (2011). "Risk-Based Framework for Safety Investment in Construction Organizations." Journal of Construction Engineering and Management, 137(8), 592-599.
    • (2011) Journal of Construction Engineering and Management , vol.137 , Issue.8 , pp. 592-599
    • Hallowell, M.R.1
  • 10
    • 84860595361 scopus 로고    scopus 로고
    • A formal model of construction safety risk management
    • sponsored by the Royal Institution of Chartered Surveyors and Georgia Tech, Atlanta, GA, September 6-7, 2007
    • Hallowell, M. R. and Gambatese, J.A. (2007). "A formal model of construction safety risk management." 2007 Construction and Building Research Conference (COBRA), sponsored by the Royal Institution of Chartered Surveyors and Georgia Tech, Atlanta, GA, September 6-7, 2007.
    • (2007) 2007 Construction and Building Research Conference (COBRA)
    • Hallowell, M.R.1    Gambatese, J.A.2
  • 11
    • 70349324675 scopus 로고    scopus 로고
    • Activity-based safety and health risk quantification for formwork construction
    • ASCE
    • Hallowell, M.R. and Gambatese, J.A. (2009a) "Activity-based safety and health risk quantification for formwork construction." Journal of Construction Engineering and Management, ASCE, 135(10): 990-998.
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.10 , pp. 990-998
    • Hallowell, M.R.1    Gambatese, J.A.2
  • 13
    • 0026260005 scopus 로고
    • Safety hazards and motivation for safe work in the construction industry
    • Helander, M. G. (1991). Safety hazards and motivation for safe work in the construction industry. Int. J. Ind. Ergonom., 8(3), 205-223.
    • (1991) Int. J. Ind. Ergonom. , vol.8 , Issue.3 , pp. 205-223
    • Helander, M.G.1
  • 16
    • 33745297554 scopus 로고    scopus 로고
    • Model for automated monitoring of fall hazards in building construction
    • Navon, R., and Kolton, O., (2006). "Model for automated monitoring of fall hazards in building construction." Journal of Construction Engineering and Management, 132(7), 733-740.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.7 , pp. 733-740
    • Navon, R.1    Kolton, O.2
  • 19
    • 22944483650 scopus 로고    scopus 로고
    • Construction project safety planning
    • Syzmberski, R. (1997). "Construction project safety planning." TAPPI Journal 80(11): 69-74.
    • (1997) TAPPI Journal , vol.80 , Issue.11 , pp. 69-74
    • Syzmberski, R.1
  • 22
    • 33646753383 scopus 로고    scopus 로고
    • Scheduling-based risk estimation and safety planning for construction projects
    • Yi, K. and Langford, D. (2006). "Scheduling-based risk estimation and safety planning for construction projects." Journal of Construction Engineering and Management, 132(6), 626-635.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.6 , pp. 626-635
    • Yi, K.1    Langford, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.