Volumn 27, Issue 7, 2009, Pages 625-638

'CHASTE': Construction hazard assessment with spatial and temporal exposure

Author keywords

Construction safety; Lean construction; Risk analysis; Safety management

Indexed keywords

BUILDING MODEL; CONCEPTUAL MODEL; CONSTRUCTION ACTIVITIES; CONSTRUCTION HAZARDS; CONSTRUCTION PLAN; CONSTRUCTION PROJECTS; CONSTRUCTION SAFETY; CONSTRUCTION SITES; CONSTRUCTION WORKERS; KNOWLEDGE BASE; LEAN CONSTRUCTION; LEVELS OF DETAIL; LOSS OF CONTROL; PHYSICAL ENVIRONMENTS; PROTOTYPE SOFTWARE; RISK LEVELS; SAFETY MANAGEMENT; SAFETY RISKS; WORK TEAM;

EID: 70449348754     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190903002771     Document Type: Article
Times cited : (47)

References (30)
  • 4
    • 4944255553 scopus 로고    scopus 로고
    • OSHA Report OSHA 3071 2002 (revised), Occupational Safety and Health Administration, US Department of Labor, USA
    • Chao, E.L. and Henshaw, J.L. (2002) Job Hazard Analysis, OSHA Report OSHA 3071 2002 (revised), Occupational Safety and Health Administration, US Department of Labor, USA.
    • (2002) Job Hazard Analysis
    • Chao, E.L.1    Henshaw, J.L.2
  • 5
    • 0043183513 scopus 로고
    • Wiley-Interscience, New York
    • Covan, J. (1995) Safety Engineering, Wiley-Interscience, New York.
    • (1995) Safety Engineering
    • Covan, J.1
  • 10
    • 18844379643 scopus 로고    scopus 로고
    • The quality of accident and health data in the construction industry: Interviews with senior managers
    • Gyi, D.E., Gibb, A.G.F. and Haslam, R.A. (1999) The quality of accident and health data in the construction industry: interviews with senior managers. Construction Management and Economics, 17, 197-204.
    • (1999) Construction Management and Economics , vol.17 , pp. 197-204
    • Gyi, D.E.1    Gibb, A.G.F.2    Haslam, R.A.3
  • 13
    • 0011743473 scopus 로고    scopus 로고
    • Prentice Hall, Upper Saddle River, NJ
    • Hinze, J.W. (1997) Construction Safety, Prentice Hall, Upper Saddle River, NJ.
    • (1997) Construction Safety
    • Hinze, J.W.1
  • 15
    • 20544434000 scopus 로고    scopus 로고
    • ILO, International Labor Organization, Geneva
    • ILO (2003) Safety in Numbers, Report 061, International Labor Organization, Geneva.
    • (2003) Safety in Numbers
  • 18
    • 0032199670 scopus 로고    scopus 로고
    • Fatalities and injuries in the Kuwaiti construction industry
    • Kartam, N.A. and Bouz, R.G. (1998) Fatalities and injuries in the Kuwaiti construction industry. Accident Analysis and Prevention, 30(6), 805-14.
    • (1998) Accident Analysis and Prevention , vol.30 , Issue.6 , pp. 805-14
    • Kartam, N.A.1    Bouz, R.G.2
  • 19
    • 67651217519 scopus 로고    scopus 로고
    • Risk assessment & hierarchies of control
    • Manuele, F.A. (2005) Risk assessment & hierarchies of control. Professional Safety, 50(5), 33-9.
    • (2005) Professional Safety , vol.50 , Issue.5 , pp. 33-9
    • Manuele, F.A.1
  • 21
    • 70449407561 scopus 로고    scopus 로고
    • Occupational health and safety management systems-general guidelines for occupational risk assessment, in Polish Standardisation Committee
    • Technical Standardization Committee No. 276, OHSM, Warsaw, 11 January, para. 3.2
    • PN-N (2000) Occupational health and safety management systems-general guidelines for occupational risk assessment, in Polish Standardisation Committee, PN-N-18002.Technical Standardization Committee No. 276, OHSM, Warsaw, 11 January, p. 4, para. 3.2.
    • (2000) PN-N-18002 , pp. 4
  • 22
  • 24
    • 70449432185 scopus 로고    scopus 로고
    • Construction job safety analysis
    • (forthcoming)
    • namegr typeauthornamesnameRozenfeld/snamex, /xfnameO./fname/namex, /xnamesnameSacks/snamex, /xfnameR./fname/namex, /xnamesnameRosenfeld/snamex, /xfnameY./fname/namex and /xnamesnameBaum/snamex, /xfnameH./fname/name/namegr (2007) Construction job safety analysis. Safety Science (forthcoming).
    • (2007) Safety Science
  • 25
    • 70449451518 scopus 로고    scopus 로고
    • Lean scheduling for safety: Development of a time-dependent risk level model
    • in Kenley, R. (ed.), 18-21 July, Sydney, Australia, UNSW
    • Sacks, R., Rozenfeld, O. and Rosenfeld, Y. (2005) Lean scheduling for safety: development of a time-dependent risk level model, in Kenley, R. (ed.) 13th Conference of the International Group for Lean Construction, 18-21 July, Sydney, Australia, UNSW, pp. 513-20.
    • (2005) 13th Conference of the International Group for Lean Construction , pp. 513-20
    • Sacks, R.1    Rozenfeld, O.2    Rosenfeld, Y.3
  • 26
    • 0342966280 scopus 로고    scopus 로고
    • Safety cost optimization of building projects in Hong Kong
    • Tang, S.L., Lee, H.K. and Wong, K. (1997) Safety cost optimization of building projects in Hong Kong. Construction Management and Economics, 15(2), 177-86.
    • (1997) Construction Management and Economics , vol.15 , Issue.2 , pp. 177-86
    • Tang, S.L.1    Lee, H.K.2    Wong, K.3
  • 27
    • 84891294593 scopus 로고    scopus 로고
    • Leveraging project models for automated identification of construction safety requirements
    • Carnegie-Mellon University, Pittsburgh, PA, 24-27 July
    • Wang, H.-H. and Boukamp, F. (2007) Leveraging project models for automated identification of construction safety requirements, in Proceedings of the 2007 ASCE International Workshop on Computing in Civil Engineering, Carnegie-Mellon University, Pittsburgh, PA, 24-27 July, pp. 240-7.
    • (2007) Proceedings of the 2007 ASCE International Workshop on Computing in Civil Engineering , pp. 240-7
    • Wang, H.-H.1    Boukamp, F.2
  • 28
    • 13944277321 scopus 로고    scopus 로고
    • Practical multifactor approach to evaluating risk of investment in engineering projects
    • Warszawski, A. and Sacks, R. (2004) Practical multifactor approach to evaluating risk of investment in engineering projects. ASCE Journal of Construction Engineering and Management, 130(3), 357-67.
    • (2004) ASCE Journal of Construction Engineering and Management , vol.130 , Issue.3 , pp. 357-67
    • Warszawski, A.1    Sacks, R.2
  • 30
    • 33646753383 scopus 로고    scopus 로고
    • Scheduling-based risk estimation and safety planning for construction projects
    • Yi, K.-J. and Langford, D. (2006) Scheduling-based risk estimation and safety planning for construction projects.SCE Journal of Construction Engineering and Management, 132(6), 626-35.
    • (2006) SCE Journal of Construction Engineering and Management , vol.132 , Issue.6 , pp. 626-35
    • Yi, K.-J.1    Langford, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.