메뉴 건너뛰기




Volumn 15, Issue 12, 2007, Pages 1556-1568

Event-based receding horizon control for two-stage multi-product production plants

Author keywords

Manufacturing processes; Manufacturing systems; Model based control; Predictive control; Receding horizon control; Scheduling algorithms

Indexed keywords

ASSEMBLY; AUTOMOBILE ENGINE MANUFACTURE; PREDICTIVE CONTROL SYSTEMS; SCHEDULING ALGORITHMS; TIME VARYING CONTROL SYSTEMS;

EID: 34748842011     PISSN: 09670661     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.conengprac.2007.03.003     Document Type: Article
Times cited : (6)

References (40)
  • 1
    • 34748891413 scopus 로고    scopus 로고
    • Alamir, M., & Attia, S. A. (2004). An efficient algorithm to solve optimal control problems for switched hybrid systems. In Proceedings of NOLCOS04. Stuttgart, Germany.
  • 2
    • 34748908521 scopus 로고    scopus 로고
    • Barbarisi, O., et al. (2004). Why adopting UML to model hybrid manufacturing systems. In Proceedings of the IEEE systems man and cybernetics conference. Hague, Netherlands.
  • 3
    • 0033097938 scopus 로고    scopus 로고
    • Control of systems integrating logic, dynamics and constraints
    • Bemporad A., and Morari M. Control of systems integrating logic, dynamics and constraints. Automatica 35 3 (1999) 407-427
    • (1999) Automatica , vol.35 , Issue.3 , pp. 407-427
    • Bemporad, A.1    Morari, M.2
  • 4
    • 34748904360 scopus 로고    scopus 로고
    • Borrelli, F. (2003). Constrained optimal control of linear and hybrid systems (Vol. 290). Lecture notes in control and information sciences. New york: Springer.
  • 5
    • 0142168927 scopus 로고    scopus 로고
    • Cassandras, C. G., & Mookherjee, R. (2003). Receding horizon control for a class of hybrid systems with event uncertainties. In Proceedings of the American control conference. Denver, Colorado, USA.
  • 6
    • 85128531641 scopus 로고    scopus 로고
    • Christophersen, F., et al. (2004). Stability analysis of hybrid systems with a linear performance index. In Proceedings of conference on decision and control (pp. 4589-4594). Atlantis, Paradise Island, Bahamas, USA.
  • 8
    • 0022094177 scopus 로고
    • Short-term production scheduling of an automated manufacturing facility
    • Gershwin S.B., et al. Short-term production scheduling of an automated manufacturing facility. IBM Journal of Research and Development 29 4 (1985) 392-400
    • (1985) IBM Journal of Research and Development , vol.29 , Issue.4 , pp. 392-400
    • Gershwin, S.B.1
  • 10
    • 0032216021 scopus 로고    scopus 로고
    • Ierapetritou, M., & Floudas, C. A. (1998). Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes. Industrial and Engineering Chemistry Research, (37).
  • 11
    • 0032877613 scopus 로고    scopus 로고
    • Ierapetritou, M., et al. (1999). Effective continuous-time formulation for short-term scheduling: 3. Multiple intermediate due dates. Industrial and Engineering Chemistry Research, (38).
  • 12
    • 34748861181 scopus 로고    scopus 로고
    • ILOG, Inc. (2000). CPLEX 7.0 user manual. France: Gentilly Cedex.
  • 13
    • 34047196825 scopus 로고    scopus 로고
    • Decentralized inventory control for large-scale supply chains
    • Minnesota, USA, Minneapolis
    • Inalhan G., and How J.P. Decentralized inventory control for large-scale supply chains. Proceedings of the American control conference (2006), Minnesota, USA, Minneapolis
    • (2006) Proceedings of the American control conference
    • Inalhan, G.1    How, J.P.2
  • 14
    • 0031188902 scopus 로고    scopus 로고
    • Karimi, I. A., & McDonald, C. M. (1997). Planning and scheduling of parallel semi-continuous processes 2. Short-term scheduling. Industrial and Engineering Chemistry Research, (36).
  • 15
    • 34748914866 scopus 로고    scopus 로고
    • Kerrigan, E. C. (2000). Robust constraints satisfaction: Invariant sets and predictive control. Ph.D. thesis, Department of Engineering, University of Cambridge, Cambridge.
  • 16
    • 33645868276 scopus 로고    scopus 로고
    • Receding horizon control of an F-16 aircraft: A comparative study
    • Keviczky T., and Balas G.J. Receding horizon control of an F-16 aircraft: A comparative study. Control Engineering Practice 14 9 (2006) 1023-1033
    • (2006) Control Engineering Practice , vol.14 , Issue.9 , pp. 1023-1033
    • Keviczky, T.1    Balas, G.J.2
  • 17
    • 0033100636 scopus 로고    scopus 로고
    • Controllers for reachability specifications for hybrid systems
    • Lygeros J., et al. Controllers for reachability specifications for hybrid systems. Automatica 35 3 (1999) 349-370
    • (1999) Automatica , vol.35 , Issue.3 , pp. 349-370
    • Lygeros, J.1
  • 18
    • 0037353063 scopus 로고    scopus 로고
    • Robust nonlinear model predictive control for nonlinear discrete-time systems
    • Magni L., et al. Robust nonlinear model predictive control for nonlinear discrete-time systems. International Journal of Robust and Nonlinear Control 13 3-4 (2003) 229-246
    • (2003) International Journal of Robust and Nonlinear Control , vol.13 , Issue.3-4 , pp. 229-246
    • Magni, L.1
  • 19
    • 34748840528 scopus 로고    scopus 로고
    • Mayne, D. (2001). Constrained optimal control. In European Control Conference, Plenary Lecture. Porto, Portugal.
  • 20
    • 0002075039 scopus 로고    scopus 로고
    • Control of constrained dynamic systems
    • Mayne D.Q. Control of constrained dynamic systems. European Journal of Control 7 (2001) 87-99
    • (2001) European Journal of Control , vol.7 , pp. 87-99
    • Mayne, D.Q.1
  • 21
    • 0033876326 scopus 로고    scopus 로고
    • Constrained model predictive control: Stability and optimality
    • Mayne D.Q., et al. Constrained model predictive control: Stability and optimality. Automatica 36 6 (2000) 789-814
    • (2000) Automatica , vol.36 , Issue.6 , pp. 789-814
    • Mayne, D.Q.1
  • 22
    • 33847211105 scopus 로고    scopus 로고
    • Miao, L., & Cassandras, C. (2005). Receding horizon control for a class of discrete event systems with real-time constraints. In Proceedings of conference on decision and control. Seville, Spain.
  • 23
    • 85128572034 scopus 로고    scopus 로고
    • Mignone, D., et al. (2000). Stability and stabilization of piecewise affine and hybrid systems: an LMI approach. In Proceedings of conference on decision and control. Sydney, Australia.
  • 24
    • 0031190611 scopus 로고    scopus 로고
    • Mockus, J., Reklaitis, G. V. (1997). Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization. Computers and Chemical Engineering, (21).
  • 25
    • 34748842881 scopus 로고    scopus 로고
    • Simulation-based benchmarking of production control schemes for complex manufacturing systems
    • Mönch L. Simulation-based benchmarking of production control schemes for complex manufacturing systems. Control Engineering Practice 14 6 (2006)
    • (2006) Control Engineering Practice , vol.14 , Issue.6
    • Mönch, L.1
  • 26
    • 0033135677 scopus 로고    scopus 로고
    • Model predictive control: past, present and future
    • Morari M., and Lee J. Model predictive control: past, present and future. Computers and Chemical Engineering 23 4-5 (1999) 667-682
    • (1999) Computers and Chemical Engineering , vol.23 , Issue.4-5 , pp. 667-682
    • Morari, M.1    Lee, J.2
  • 28
    • 0028500039 scopus 로고    scopus 로고
    • Pinto, J., & Grossmann, I. E. (1994). Optimal cyclic scheduling of multistage continuous multiproduct plants. Computers and Chemical Engineering, (18).
  • 29
    • 0001690679 scopus 로고    scopus 로고
    • Pinto, J., & Grossmann, I. E. (1995). A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Industrial and Engineering Chemistry Research, (34).
  • 30
    • 0030713544 scopus 로고    scopus 로고
    • Pinto, J., & Grossmann, I. E. (1997). A logic-based approach to scheduling problems with resource constraints. Computers and Chemical Engineering, (21).
  • 31
    • 33645801795 scopus 로고    scopus 로고
    • Reachability analysis of discrete-time systems with disturbances
    • Rakovic S.V., et al. Reachability analysis of discrete-time systems with disturbances. IEEE Transactions on Automatic Control 51 (2006) 546-561
    • (2006) IEEE Transactions on Automatic Control , vol.51 , pp. 546-561
    • Rakovic, S.V.1
  • 32
    • 0026108291 scopus 로고
    • Relation between MILP modeling and logical inference for chemical process synthesis
    • Raman R., and Grossmann I. Relation between MILP modeling and logical inference for chemical process synthesis. Computers and Chemical Engineering 15 2 (1991) 73-84
    • (1991) Computers and Chemical Engineering , vol.15 , Issue.2 , pp. 73-84
    • Raman, R.1    Grossmann, I.2
  • 33
    • 0029717404 scopus 로고    scopus 로고
    • Schilling, G., & Pantelides, C. C. (1996). A simple continuous-time process scheduling formulation and a novel solution algorithm. Computers and Chemical Engineering, (20).
  • 34
    • 34047218389 scopus 로고    scopus 로고
    • Schwartz, J. D., & Rivera, D. E. (2006). Simulation-based optimal tuning of model predictive control policies for supply chain management using simultaneous perturbation stochastic approximation. In Proceedings of American control conference. Minneapolis, Minnesota, USA.
  • 35
    • 34748865674 scopus 로고    scopus 로고
    • Shah, N., (1998). Single and multisite planning and scheduling: Current status and future challenges. In Proceedings of the third international conference on foundations of computer-aided process operations.
  • 36
    • 34748880920 scopus 로고    scopus 로고
    • Tsetimi, J., & Omosigho, S. E. (2004). Multi-stage manufacturing system research issues and challenges. In Proceedings of 2004 Hawaii international conference on statistics, mathematics and related fields.
  • 38
    • 0037036735 scopus 로고    scopus 로고
    • Xiaoxia, L. et a. (2002). Continuous-time optimization approach for medium-range production scheduling of a multi-product batch plant. Industrial and Engineering Chemistry Research, (41), 3884-3906.
  • 39
    • 34247634602 scopus 로고    scopus 로고
    • Zafra-Cabeza, A., et al. (2007). Managing risk in semiconductor manufacturing: A stochastic predictive control approach. Control Engineering Practice, doi:10.1016/j.conengprac.2006.12.004.
  • 40
    • 0030174820 scopus 로고    scopus 로고
    • Zhang, X., & Sargent, R. H. (1996). The optimal operation of mixed production facilities-general formulation and some solution approaches for the solution. Computers and Chemical Engineering, (20).


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.