-
1
-
-
34748891413
-
-
Alamir, M., & Attia, S. A. (2004). An efficient algorithm to solve optimal control problems for switched hybrid systems. In Proceedings of NOLCOS04. Stuttgart, Germany.
-
-
-
-
2
-
-
34748908521
-
-
Barbarisi, O., et al. (2004). Why adopting UML to model hybrid manufacturing systems. In Proceedings of the IEEE systems man and cybernetics conference. Hague, Netherlands.
-
-
-
-
3
-
-
0033097938
-
Control of systems integrating logic, dynamics and constraints
-
Bemporad A., and Morari M. Control of systems integrating logic, dynamics and constraints. Automatica 35 3 (1999) 407-427
-
(1999)
Automatica
, vol.35
, Issue.3
, pp. 407-427
-
-
Bemporad, A.1
Morari, M.2
-
4
-
-
34748904360
-
-
Borrelli, F. (2003). Constrained optimal control of linear and hybrid systems (Vol. 290). Lecture notes in control and information sciences. New york: Springer.
-
-
-
-
5
-
-
0142168927
-
-
Cassandras, C. G., & Mookherjee, R. (2003). Receding horizon control for a class of hybrid systems with event uncertainties. In Proceedings of the American control conference. Denver, Colorado, USA.
-
-
-
-
6
-
-
85128531641
-
-
Christophersen, F., et al. (2004). Stability analysis of hybrid systems with a linear performance index. In Proceedings of conference on decision and control (pp. 4589-4594). Atlantis, Paradise Island, Bahamas, USA.
-
-
-
-
8
-
-
0022094177
-
Short-term production scheduling of an automated manufacturing facility
-
Gershwin S.B., et al. Short-term production scheduling of an automated manufacturing facility. IBM Journal of Research and Development 29 4 (1985) 392-400
-
(1985)
IBM Journal of Research and Development
, vol.29
, Issue.4
, pp. 392-400
-
-
Gershwin, S.B.1
-
10
-
-
0032216021
-
-
Ierapetritou, M., & Floudas, C. A. (1998). Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes. Industrial and Engineering Chemistry Research, (37).
-
-
-
-
11
-
-
0032877613
-
-
Ierapetritou, M., et al. (1999). Effective continuous-time formulation for short-term scheduling: 3. Multiple intermediate due dates. Industrial and Engineering Chemistry Research, (38).
-
-
-
-
12
-
-
34748861181
-
-
ILOG, Inc. (2000). CPLEX 7.0 user manual. France: Gentilly Cedex.
-
-
-
-
13
-
-
34047196825
-
Decentralized inventory control for large-scale supply chains
-
Minnesota, USA, Minneapolis
-
Inalhan G., and How J.P. Decentralized inventory control for large-scale supply chains. Proceedings of the American control conference (2006), Minnesota, USA, Minneapolis
-
(2006)
Proceedings of the American control conference
-
-
Inalhan, G.1
How, J.P.2
-
14
-
-
0031188902
-
-
Karimi, I. A., & McDonald, C. M. (1997). Planning and scheduling of parallel semi-continuous processes 2. Short-term scheduling. Industrial and Engineering Chemistry Research, (36).
-
-
-
-
15
-
-
34748914866
-
-
Kerrigan, E. C. (2000). Robust constraints satisfaction: Invariant sets and predictive control. Ph.D. thesis, Department of Engineering, University of Cambridge, Cambridge.
-
-
-
-
16
-
-
33645868276
-
Receding horizon control of an F-16 aircraft: A comparative study
-
Keviczky T., and Balas G.J. Receding horizon control of an F-16 aircraft: A comparative study. Control Engineering Practice 14 9 (2006) 1023-1033
-
(2006)
Control Engineering Practice
, vol.14
, Issue.9
, pp. 1023-1033
-
-
Keviczky, T.1
Balas, G.J.2
-
17
-
-
0033100636
-
Controllers for reachability specifications for hybrid systems
-
Lygeros J., et al. Controllers for reachability specifications for hybrid systems. Automatica 35 3 (1999) 349-370
-
(1999)
Automatica
, vol.35
, Issue.3
, pp. 349-370
-
-
Lygeros, J.1
-
18
-
-
0037353063
-
Robust nonlinear model predictive control for nonlinear discrete-time systems
-
Magni L., et al. Robust nonlinear model predictive control for nonlinear discrete-time systems. International Journal of Robust and Nonlinear Control 13 3-4 (2003) 229-246
-
(2003)
International Journal of Robust and Nonlinear Control
, vol.13
, Issue.3-4
, pp. 229-246
-
-
Magni, L.1
-
19
-
-
34748840528
-
-
Mayne, D. (2001). Constrained optimal control. In European Control Conference, Plenary Lecture. Porto, Portugal.
-
-
-
-
20
-
-
0002075039
-
Control of constrained dynamic systems
-
Mayne D.Q. Control of constrained dynamic systems. European Journal of Control 7 (2001) 87-99
-
(2001)
European Journal of Control
, vol.7
, pp. 87-99
-
-
Mayne, D.Q.1
-
21
-
-
0033876326
-
Constrained model predictive control: Stability and optimality
-
Mayne D.Q., et al. Constrained model predictive control: Stability and optimality. Automatica 36 6 (2000) 789-814
-
(2000)
Automatica
, vol.36
, Issue.6
, pp. 789-814
-
-
Mayne, D.Q.1
-
22
-
-
33847211105
-
-
Miao, L., & Cassandras, C. (2005). Receding horizon control for a class of discrete event systems with real-time constraints. In Proceedings of conference on decision and control. Seville, Spain.
-
-
-
-
23
-
-
85128572034
-
-
Mignone, D., et al. (2000). Stability and stabilization of piecewise affine and hybrid systems: an LMI approach. In Proceedings of conference on decision and control. Sydney, Australia.
-
-
-
-
24
-
-
0031190611
-
-
Mockus, J., Reklaitis, G. V. (1997). Mathematical programming formulation for scheduling of batch operations based on nonuniform time discretization. Computers and Chemical Engineering, (21).
-
-
-
-
25
-
-
34748842881
-
Simulation-based benchmarking of production control schemes for complex manufacturing systems
-
Mönch L. Simulation-based benchmarking of production control schemes for complex manufacturing systems. Control Engineering Practice 14 6 (2006)
-
(2006)
Control Engineering Practice
, vol.14
, Issue.6
-
-
Mönch, L.1
-
26
-
-
0033135677
-
Model predictive control: past, present and future
-
Morari M., and Lee J. Model predictive control: past, present and future. Computers and Chemical Engineering 23 4-5 (1999) 667-682
-
(1999)
Computers and Chemical Engineering
, vol.23
, Issue.4-5
, pp. 667-682
-
-
Morari, M.1
Lee, J.2
-
28
-
-
0028500039
-
-
Pinto, J., & Grossmann, I. E. (1994). Optimal cyclic scheduling of multistage continuous multiproduct plants. Computers and Chemical Engineering, (18).
-
-
-
-
29
-
-
0001690679
-
-
Pinto, J., & Grossmann, I. E. (1995). A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Industrial and Engineering Chemistry Research, (34).
-
-
-
-
30
-
-
0030713544
-
-
Pinto, J., & Grossmann, I. E. (1997). A logic-based approach to scheduling problems with resource constraints. Computers and Chemical Engineering, (21).
-
-
-
-
31
-
-
33645801795
-
Reachability analysis of discrete-time systems with disturbances
-
Rakovic S.V., et al. Reachability analysis of discrete-time systems with disturbances. IEEE Transactions on Automatic Control 51 (2006) 546-561
-
(2006)
IEEE Transactions on Automatic Control
, vol.51
, pp. 546-561
-
-
Rakovic, S.V.1
-
32
-
-
0026108291
-
Relation between MILP modeling and logical inference for chemical process synthesis
-
Raman R., and Grossmann I. Relation between MILP modeling and logical inference for chemical process synthesis. Computers and Chemical Engineering 15 2 (1991) 73-84
-
(1991)
Computers and Chemical Engineering
, vol.15
, Issue.2
, pp. 73-84
-
-
Raman, R.1
Grossmann, I.2
-
33
-
-
0029717404
-
-
Schilling, G., & Pantelides, C. C. (1996). A simple continuous-time process scheduling formulation and a novel solution algorithm. Computers and Chemical Engineering, (20).
-
-
-
-
34
-
-
34047218389
-
-
Schwartz, J. D., & Rivera, D. E. (2006). Simulation-based optimal tuning of model predictive control policies for supply chain management using simultaneous perturbation stochastic approximation. In Proceedings of American control conference. Minneapolis, Minnesota, USA.
-
-
-
-
35
-
-
34748865674
-
-
Shah, N., (1998). Single and multisite planning and scheduling: Current status and future challenges. In Proceedings of the third international conference on foundations of computer-aided process operations.
-
-
-
-
36
-
-
34748880920
-
-
Tsetimi, J., & Omosigho, S. E. (2004). Multi-stage manufacturing system research issues and challenges. In Proceedings of 2004 Hawaii international conference on statistics, mathematics and related fields.
-
-
-
-
38
-
-
0037036735
-
-
Xiaoxia, L. et a. (2002). Continuous-time optimization approach for medium-range production scheduling of a multi-product batch plant. Industrial and Engineering Chemistry Research, (41), 3884-3906.
-
-
-
-
39
-
-
34247634602
-
-
Zafra-Cabeza, A., et al. (2007). Managing risk in semiconductor manufacturing: A stochastic predictive control approach. Control Engineering Practice, doi:10.1016/j.conengprac.2006.12.004.
-
-
-
-
40
-
-
0030174820
-
-
Zhang, X., & Sargent, R. H. (1996). The optimal operation of mixed production facilities-general formulation and some solution approaches for the solution. Computers and Chemical Engineering, (20).
-
-
-
|