메뉴 건너뛰기




Volumn 47, Issue 1, 1999, Pages 131-149

Order-fulfillment performance measures in an assemble-to-order system with stochastic leadtimes

Author keywords

Inventory production: multi item, operating characteristics, stochastic; Probability: applications, Markov processes, stochastic model applications

Indexed keywords


EID: 0002779268     PISSN: 0030364X     EISSN: None     Source Type: Journal    
DOI: 10.1287/opre.47.1.131     Document Type: Article
Times cited : (131)

References (19)
  • 2
    • 0032073456 scopus 로고    scopus 로고
    • Managing stochastic multiproduct systems: Model, measures, and analysis
    • Anupindi, R., S. Tayur. 1998. Managing stochastic multiproduct systems: model, measures, and analysis. Oper. Res. 46, 98-111.
    • (1998) Oper. Res. , vol.46 , pp. 98-111
    • Anupindi, R.1    Tayur, S.2
  • 3
    • 0029288586 scopus 로고
    • Multiple failures in a multi-item spare inventory model
    • Cheung, K-L., W. Hausman. 1995. Multiple failures in a multi-item spare inventory model. IIE Trans. 27, 171-180.
    • (1995) IIE Trans. , vol.27 , pp. 171-180
    • Cheung, K.-L.1    Hausman, W.2
  • 4
    • 0006668731 scopus 로고
    • Out of touch with customer needs? Spare parts and after sales service
    • Cohen, M., H. Lee. 1990. Out of touch with customer needs? Spare parts and after sales service. Sloan Management Rev. (Winter) 55-66.
    • (1990) Sloan Management Rev. , Issue.WINTER , pp. 55-66
    • Cohen, M.1    Lee, H.2
  • 5
    • 0021506349 scopus 로고
    • Two parallel queues created by arrivals with two demands I
    • Flatto, L., S. Hahn. 1984. Two parallel queues created by arrivals with two demands I. SIAM J. Appl. Math. 44, 1041-1052.
    • (1984) SIAM J. Appl. Math. , vol.44 , pp. 1041-1052
    • Flatto, L.1    Hahn, S.2
  • 6
    • 0032202098 scopus 로고    scopus 로고
    • Leadtime-inventory trade-offs in assemble-to-order systems
    • Glasserman, P., Y. Wang. 1998. Leadtime-inventory trade-offs in assemble-to-order systems. Oper. Res. 46(6).
    • (1998) Oper. Res. , vol.46 , Issue.6
    • Glasserman, P.1    Wang, Y.2
  • 7
    • 0032169180 scopus 로고    scopus 로고
    • Joint demand fulfillment probability in a multi-item inventory Order response time reliability in a multi-item inventory system with independent order-up-to policies
    • Hausman, W., H. Lee, A. Zhang. 1998. Joint demand fulfillment probability in a multi-item inventory Order response time reliability in a multi-item inventory system with independent order-up-to policies. European J. Oper. Res. 109, 646-659.
    • (1998) European J. Oper. Res. , vol.109 , pp. 646-659
    • Hausman, W.1    Lee, H.2    Zhang, A.3
  • 9
    • 0027658539 scopus 로고
    • Material management in decentralized supply chains
    • Lee, H., and C. Billington. 1993. Material management in decentralized supply chains. Oper. Res. 41, 835-847.
    • (1993) Oper. Res. , vol.41 , pp. 835-847
    • Lee, H.1    Billington, C.2
  • 10
    • 0026814867 scopus 로고
    • The role of inventory in delivery-time competition
    • Li, L. 1992. The role of inventory in delivery-time competition. Management Sci. 38, 182-197.
    • (1992) Management Sci. , vol.38 , pp. 182-197
    • Li, L.1
  • 13
    • 0000837351 scopus 로고
    • Induced rare events: Analysis via large deviations and time reversal
    • Shwartz, A., A. Weiss. 1993. Induced rare events: analysis via large deviations and time reversal. Adv. Appl. Prob. 25, 667-689.
    • (1993) Adv. Appl. Prob. , vol.25 , pp. 667-689
    • Shwartz, A.1    Weiss, A.2
  • 14
    • 0032201713 scopus 로고    scopus 로고
    • On the order fill rate in a multi-item, base-stock inventory system
    • Song, J. 1998. On the order fill rate in a multi-item, base-stock inventory system. Oper. Res. 46(6).
    • (1998) Oper. Res. , vol.46 , Issue.6
    • Song, J.1
  • 15
    • 0004134551 scopus 로고
    • Procurement of common components in a stochastic environment
    • IBM Watson Research Center, Yorktown Heights, NY
    • Srinivasan, R., R. Jayaraman, R. Roundy, S. Tayur. 1992. Procurement of common components in a stochastic environment. Research Report. IBM Watson Research Center, Yorktown Heights, NY.
    • (1992) Research Report
    • Srinivasan, R.1    Jayaraman, R.2    Roundy, R.3    Tayur, S.4
  • 16
    • 0007173374 scopus 로고
    • Two parallel processors with coupled inputs
    • Wright, P. 1992. Two parallel processors with coupled inputs. Adv. Appl. Prob. 24, 986-1007.
    • (1992) Adv. Appl. Prob. , vol.24 , pp. 986-1007
    • Wright, P.1
  • 17
    • 0032687318 scopus 로고    scopus 로고
    • Structural analysis of a queueing system with multi-classes of correlated arrivals and blocking
    • forthcoming
    • Xu, S. H. 1999. Structural analysis of a queueing system with multi-classes of correlated arrivals and blocking. Oper. Res. (forthcoming).
    • (1999) Oper. Res.
    • Xu, S.H.1
  • 18
    • 20044368515 scopus 로고
    • Working Paper. Department of Industrial and Operations Engineering, University of Michigan, Ann Arbor, MI
    • Zhang, R. 1995. Time delay in a multi-item production-inventory system. Working Paper. Department of Industrial and Operations Engineering, University of Michigan, Ann Arbor, MI.
    • (1995) Time Delay in a Multi-item Production-inventory System
    • Zhang, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.