메뉴 건너뛰기




Volumn 120, Issue 2, 2009, Pages 418-429

Defining inventory control points in multiproduct stochastic pull systems

Author keywords

Buffers; Inventory; Kanban; Pull control

Indexed keywords

ANALYTICAL MODEL; BUFFERS; CONTROL POINT; GI/G/1 QUEUE; INVENTORY; INVENTORY LEVELS; KANBAN; LEAD-TIME VARIABILITY; LEAN MANUFACTURING; MULTI-PRODUCT; OPTIMAL LOCATIONS; OPTIMALITY; OUTPUT BUFFER; PRODUCT MIX; PRODUCTION RESOURCES; PULL CONTROL; PULL PRODUCTION; PULL SYSTEMS; STOCHASTIC DEMAND; SUFFICIENT CONDITIONS; WAITING TIME;

EID: 67651146397     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2008.11.020     Document Type: Article
Times cited : (21)

References (29)
  • 2
    • 0027353436 scopus 로고
    • Determining the number of kanbans in multi-item just-in-time systems
    • Askin R.G., Mitwasi M.G., and Goldberg J.B. Determining the number of kanbans in multi-item just-in-time systems. IIE Transactions 25 1 (1993) 89-98
    • (1993) IIE Transactions , vol.25 , Issue.1 , pp. 89-98
    • Askin, R.G.1    Mitwasi, M.G.2    Goldberg, J.B.3
  • 3
    • 0034466408 scopus 로고    scopus 로고
    • Extended kanban control systems: combining kanban and base stock
    • Dallery Y., and Liberopoulos G. Extended kanban control systems: combining kanban and base stock. IIE Transactions 32 (2000) 369-386
    • (2000) IIE Transactions , vol.32 , pp. 369-386
    • Dallery, Y.1    Liberopoulos, G.2
  • 4
    • 0023345352 scopus 로고
    • Configuring a kanban system using a discrete optimization of multiple stochastic responses
    • Davis W.J., and Stubitz S.J. Configuring a kanban system using a discrete optimization of multiple stochastic responses. International Journal of Production Research 25 (1987) 721-740
    • (1987) International Journal of Production Research , vol.25 , pp. 721-740
    • Davis, W.J.1    Stubitz, S.J.2
  • 7
    • 0002687992 scopus 로고
    • Impact of the setup variable on capacity and inventory decisions
    • Hahn C.K., Bragg D.J., and Shin D. Impact of the setup variable on capacity and inventory decisions. Academy of Management Review 13 1 (1988) 91-103
    • (1988) Academy of Management Review , vol.13 , Issue.1 , pp. 91-103
    • Hahn, C.K.1    Bragg, D.J.2    Shin, D.3
  • 10
    • 0039392544 scopus 로고    scopus 로고
    • Safety stocks in multi-stage inventory systems under different service measures
    • Inderfurth K., and Minner S. Safety stocks in multi-stage inventory systems under different service measures. European Journal of Operational Research 106 (1998) 57-73
    • (1998) European Journal of Operational Research , vol.106 , pp. 57-73
    • Inderfurth, K.1    Minner, S.2
  • 11
    • 0028443055 scopus 로고
    • Safety stocks in multistage divergent inventory systems: a survey
    • Inderfurth K. Safety stocks in multistage divergent inventory systems: a survey. International Journal of Production Economics 35 (1994) 321-329
    • (1994) International Journal of Production Economics , vol.35 , pp. 321-329
    • Inderfurth, K.1
  • 12
    • 0023310940 scopus 로고
    • Lot sizes, lead times and in-process inventories
    • Karmarkar U.S. Lot sizes, lead times and in-process inventories. Management Science 33 3 (1987) 409-418
    • (1987) Management Science , vol.33 , Issue.3 , pp. 409-418
    • Karmarkar, U.S.1
  • 14
    • 0035815864 scopus 로고    scopus 로고
    • Strategic safety stocks in reverse logistics supply chains
    • Minner S. Strategic safety stocks in reverse logistics supply chains. International Journal of Production Economics 71 1-3 (2001) 417-428
    • (2001) International Journal of Production Economics , vol.71 , Issue.1-3 , pp. 417-428
    • Minner, S.1
  • 15
    • 0025564738 scopus 로고
    • Analysis of a kanban discipline for cell coordination in production lines
    • Mitra D., and Mitrani T. Analysis of a kanban discipline for cell coordination in production lines. Management Science 36 (1990) 1548-1566
    • (1990) Management Science , vol.36 , pp. 1548-1566
    • Mitra, D.1    Mitrani, T.2
  • 16
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Norfolk: GA
    • Monden Y. The Toyota Production System (1983), Industrial Engineering and Management Press, Norfolk: GA
    • (1983) The Toyota Production System
    • Monden, Y.1
  • 17
    • 61449145606 scopus 로고    scopus 로고
    • Restricted work-in-process: A study of differences between Kanban and CONWIP
    • doi:10.1016/j.ijpe.2008.08.043
    • Pettersen, J.-A., Segerstedt, A., 2009. Restricted work-in-process: a study of differences between Kanban and CONWIP. International Journal of Production Economics, doi:10.1016/j.ijpe.2008.08.043.
    • (2009) International Journal of Production Economics
    • Pettersen, J.-A.1    Segerstedt, A.2
  • 18
    • 67651195188 scopus 로고
    • An investigation of factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans
    • Philipoom P.R., Rees L.P., Taylor III B.W., and Huang P.Y. An investigation of factors influencing the number of kanbans required in the implementation of the JIT technique with kanbans. International Journal of Production Research 33 (1987) 1171-1177
    • (1987) International Journal of Production Research , vol.33 , pp. 1171-1177
    • Philipoom, P.R.1    Rees, L.P.2    Taylor III, B.W.3    Huang, P.Y.4
  • 19
    • 38049086229 scopus 로고    scopus 로고
    • Performance evaluation of a multiproduct system under CONWIP control
    • Satyam K., and Krishnamurthy A. Performance evaluation of a multiproduct system under CONWIP control. IIE Transactions 40 (2008) 252-264
    • (2008) IIE Transactions , vol.40 , pp. 252-264
    • Satyam, K.1    Krishnamurthy, A.2
  • 23
    • 0009970655 scopus 로고
    • In-process inventories
    • Simpson Jr. K.F. In-process inventories. Operations Research 6 6 (1958) 863-873
    • (1958) Operations Research , vol.6 , Issue.6 , pp. 863-873
    • Simpson Jr., K.F.1
  • 25
    • 0023437336 scopus 로고
    • Setup reduction and increased effective capacity
    • Spence A.M., and Porteus E.L. Setup reduction and increased effective capacity. Management Science 33 10 (1987) 1291-1301
    • (1987) Management Science , vol.33 , Issue.10 , pp. 1291-1301
    • Spence, A.M.1    Porteus, E.L.2
  • 26
    • 0027696153 scopus 로고
    • Structural properties and a heuristic for kanban-controlled serial lines
    • Tayur S. Structural properties and a heuristic for kanban-controlled serial lines. Management Science 39 11 (1993) 1347-1368
    • (1993) Management Science , vol.39 , Issue.11 , pp. 1347-1368
    • Tayur, S.1
  • 28
    • 3943049520 scopus 로고
    • Determining the number of kanbans: a step towards non-stock production
    • Wang H., and Wang H.P. Determining the number of kanbans: a step towards non-stock production. International Journal of Production Research 28 (1990) 2101-2115
    • (1990) International Journal of Production Research , vol.28 , pp. 2101-2115
    • Wang, H.1    Wang, H.P.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.