메뉴 건너뛰기




Volumn 47, Issue 4, 2004, Pages 313-344

A general decomposition algorithm for parallel queues with correlated arrivals

Author keywords

assemble to order; correlated arrivals; heuristics; matrix decomposition approach; produce to stock

Indexed keywords

QUEUEING NETWORKS;

EID: 4043118254     PISSN: 02570130     EISSN: None     Source Type: Journal    
DOI: 10.1023/B:QUES.0000036395.55351.07     Document Type: Article
Times cited : (12)

References (25)
  • 2
    • 0039506447 scopus 로고    scopus 로고
    • Hewlett-Packard uses operations research to improve the design of a printer production line
    • M. Burman, S.B. Gershwin and C. Suyematsu, Hewlett-Packard uses operations research to improve the design of a printer production line, Interfaces 28 (1998) 24-36.
    • (1998) Interfaces , vol.28 , pp. 24-36
    • Burman, M.1    Gershwin, S.B.2    Suyematsu, C.3
  • 5
    • 0029288586 scopus 로고
    • Multiple failures in a multi-item spare inventory model
    • K.L. Cheung and W. Hausman, Multiple failures in a multi-item spare inventory model, IIE Transactions 27 (1995) 171-180.
    • (1995) IIE Transactions , vol.27 , pp. 171-180
    • Cheung, K.L.1    Hausman, W.2
  • 6
    • 0345548368 scopus 로고    scopus 로고
    • The effectiveness of several performance bounds for capacitated assemble-to-order systems
    • S. Dayanik, J. Song and S. Xu, The effectiveness of several performance bounds for capacitated assemble-to-order systems, Manufacturing and Service Operations Management 5 (2003) 230-251.
    • (2003) Manufacturing and Service Operations Management , vol.5 , pp. 230-251
    • Dayanik, S.1    Song, J.2    Xu, S.3
  • 7
    • 84989694468 scopus 로고
    • Component commonality in assemble-to-order systems: Models and properties
    • Y. Gerchak and M. Henig, Component commonality in assemble-to-order systems: Models and properties, Naval Research Logistics 3 (1989) 61-68.
    • (1989) Naval Research Logistics , vol.3 , pp. 61-68
    • Gerchak, Y.1    Henig, M.2
  • 8
    • 0032202098 scopus 로고    scopus 로고
    • Lead-time-inventory trade offs in assemble-to-order systems
    • P. Glasserman and Y. Wang, Lead-time-inventory trade offs in assemble-to-order systems, Operations Research 46 (1998) 858-871.
    • (1998) Operations Research , vol.46 , pp. 858-871
    • Glasserman, P.1    Wang, Y.2
  • 10
    • 0032169180 scopus 로고    scopus 로고
    • Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies
    • W. Hausman, W.H. Lee and A. Zhang. Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies, European Journal of Operations Research 109 (1998) 646-659.
    • (1998) European Journal of Operations Research , vol.109 , pp. 646-659
    • Hausman, W.1    Lee, W.H.2    Zhang, A.3
  • 16
    • 0032201713 scopus 로고    scopus 로고
    • On the order fill rate in a multi-item, base-stock inventory system
    • J.S. Song, On the order fill rate in a multi-item, base-stock inventory system, Operations Research 46 (1998) 831-845.
    • (1998) Operations Research , vol.46 , pp. 831-845
    • Song, J.S.1
  • 17
    • 0002779268 scopus 로고    scopus 로고
    • Order-fulfillment performance measure in an assemble-to-order system with stochastic lead-times
    • J.S. Song, S. Xu and B. Liu, Order-fulfillment performance measure in an assemble-to-order system with stochastic lead-times, Operations Research 47 (1999) 131-149.
    • (1999) Operations Research , vol.47 , pp. 131-149
    • Song, J.S.1    Xu, S.2    Liu, B.3
  • 20
    • 0032292446 scopus 로고    scopus 로고
    • Managing broader product lines through delayed differentiation using vanilla boxes
    • J.M. Swaminathan and S.R. Tayur. Managing broader product lines through delayed differentiation using vanilla boxes, Management Science 44 (1998) S161-S172.
    • (1998) Management Science , vol.44
    • Swaminathan, J.M.1    Tayur, S.R.2
  • 21
    • 0037943470 scopus 로고
    • Assemble-to-order manufacturing, implication for material planning
    • U. Wemmerlov, Assemble-to-order manufacturing, implication for material planning, Journal of Operations Management 4 (1984) 347-368.
    • (1984) Journal of Operations Management , vol.4 , pp. 347-368
    • Wemmerlov, U.1
  • 22
    • 0032687318 scopus 로고    scopus 로고
    • Structural analysis of a queuing system with multiclasses of correlated arrivals and blocking
    • S.H. Xu, Structural analysis of a queuing system with multiclasses of correlated arrivals and blocking, Operations Research 47 (1999) 264-276.
    • (1999) Operations Research , vol.47 , pp. 264-276
    • Xu, S.H.1
  • 23
    • 0010352003 scopus 로고    scopus 로고
    • Dependence analysis of assemble-to-order systems
    • eds. J.S. Song and D.D. Yao Kluwer Academic, Boston
    • S.H. Xu, Dependence analysis of assemble-to-order systems, in: Supply Chain Structures: Coordination, Information and Optimization, eds. J.S. Song and D.D. Yao (Kluwer Academic, Boston, 2001).
    • (2001) Supply Chain Structures: Coordination, Information and Optimization
    • Xu, S.H.1
  • 24
    • 0034186998 scopus 로고    scopus 로고
    • Majorization of weighted trees: A new tool to study correlated stochastic systems
    • S.H. Xu and H. Li, Majorization of weighted trees: a new tool to study correlated stochastic systems, Mathematics of Operations Research 25 (2000) 298-323.
    • (2000) Mathematics of Operations Research , vol.25 , pp. 298-323
    • Xu, S.H.1    Li, H.2
  • 25
    • 0033357354 scopus 로고    scopus 로고
    • Expected time delay in multi-item inventory systems with correlated demands
    • R.Q. Zhang, Expected time delay in multi-item inventory systems with correlated demands, Naval Research Logistics 46 (1999) 671-688.
    • (1999) Naval Research Logistics , vol.46 , pp. 671-688
    • Zhang, R.Q.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.