-
1
-
-
0002869954
-
Extending CHIP in order to solve complex scheduling and placement problems
-
Pergamon Press Ltd
-
Aggoun, A., & Beldiceanu, N. (1993). Extending CHIP in order to solve complex scheduling and placement problems (Mathl. Comput. Modelling) (vol. 17, no. 7, pp. 57-73). Pergamon Press Ltd.
-
(1993)
Mathl. Comput. Modelling
, vol.17
, Issue.7
, pp. 57-73
-
-
Aggoun, A.1
Beldiceanu, N.2
-
2
-
-
0031541297
-
Concurrent operations assignment and sequencing for particular assembly problems in flow lines
-
0880.90068 10.1023/A:1018916608787
-
Agnetis, A., & Arbib, C. (1997). Concurrent operations assignment and sequencing for particular assembly problems in flow lines. Annals of Operation Research, 69, 1-31.
-
(1997)
Annals of Operation Research
, vol.69
, pp. 1-31
-
-
Agnetis, A.1
Arbib, C.2
-
3
-
-
77954443380
-
An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem
-
10.1080/00207540903117857
-
Akgündüz, O.S., & TunalI, S. (2009). An adaptive genetic algorithm approach for the mixed-model assembly line sequencing problem. International Journal of Production Research, 48(17), 5157-5179.
-
(2009)
International Journal of Production Research
, vol.48
, Issue.17
, pp. 5157-5179
-
-
Akgündüz, O.S.1
Tunali, S.2
-
4
-
-
84877794707
-
-
Springer
-
Appa, G., Mourtos, I., Magos, D. (2002). Integrating constraint and integers programming for the orthogonal latin squares problem, principles and practice of constraint programming - CP 2002 (pp. 79-90). Springer.
-
(2002)
Integrating Constraint and Integers Programming for the Orthogonal Latin Squares Problem, Principles and Practice of Constraint Programming - CP 2002
, pp. 79-90
-
-
Appa, G.1
Mourtos, I.2
Magos, D.3
-
5
-
-
36849023499
-
Balancing and scheduling tasks in assembly lines with sequenc-dependent setup times
-
1137.90476 10.1016/j.ejor.2006.07.044
-
Andres, C., Miralles, C., Pastor, R. (2008). Balancing and scheduling tasks in assembly lines with sequenc-dependent setup times. European Journal of Operational Research, 187, 1212-1223.
-
(2008)
European Journal of Operational Research
, vol.187
, pp. 1212-1223
-
-
Andres, C.1
Miralles, C.2
Pastor, R.3
-
8
-
-
33746651030
-
Constraint-based scheduling: An introduction for newcomers
-
Bartak, R. (2003). Constraint-based scheduling: An introduction for newcomers. Intelligent manufacturing systems 2003 (pp. 69-75).
-
(2003)
Intelligent Manufacturing Systems 2003
, pp. 69-75
-
-
Bartak, R.1
-
10
-
-
37349007853
-
Assembly line balancing: Which model to use when
-
10.1016/j.ijpe.2007.02.026
-
Boysen, N., Fliedner, M., Scholl, A. (2008). Assembly line balancing: Which model to use when. International Journal of Production Economics, 111, 509-528.
-
(2008)
International Journal of Production Economics
, vol.111
, pp. 509-528
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
11
-
-
51249121803
-
Sequencing mixed-model assembly lines: Survey, classification and model crituqe
-
2454768 1157.90405 10.1016/j.ejor.2007.09.013
-
Boysen, N., Fliedner, M., Scholl, A. (2009). Sequencing mixed-model assembly lines: Survey, classification and model crituqe. European Journal of Operational Research, 192, 349-773.
-
(2009)
European Journal of Operational Research
, vol.192
, pp. 349-773
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
12
-
-
67651205275
-
Production planning of mixed-model assembly lines: Overview and extensions
-
10.1080/09537280903011626
-
Boysen, N., Fliedner, M., Scholl, A. (2009). Production planning of mixed-model assembly lines: overview and extensions. Production Planning & Control, 20(5), 455-471.
-
(2009)
Production Planning & Control
, vol.20
, Issue.5
, pp. 455-471
-
-
Boysen, N.1
Fliedner, M.2
Scholl, A.3
-
13
-
-
0033338820
-
Constraint satisfaction problems: Algorithms and applications
-
10.1016/S0377-2217(98)00364-6
-
Brailsfard, S.C., Potts, C.N., Smith, B.M. (1999). Constraint satisfaction problems: algorithms and applications. European Journal of Operational Research, 119, 557-581.
-
(1999)
European Journal of Operational Research
, vol.119
, pp. 557-581
-
-
Brailsfard, S.C.1
Potts, C.N.2
Smith, B.M.3
-
16
-
-
0035295083
-
Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints
-
1232.90110 10.1287/mnsc.47.3.480.9777
-
Drexl A., & Kimms, A. (2001). Sequencing JIT mixed-model assembly lines under station-load and part-usage constraints. Management Science, 47(3), 480-491.
-
(2001)
Management Science
, vol.47
, Issue.3
, pp. 480-491
-
-
Drexl, A.1
Kimms, A.2
-
17
-
-
0036175860
-
Mathematical programming techniques in constraint programming: A short overview
-
1073.90035 10.1023/A:1013653332557
-
Focacci, F., Lodi, A., Milano, M. (2002). Mathematical programming techniques in constraint programming: A short overview. Journal of Heuristics, 8, 7-17.
-
(2002)
Journal of Heuristics
, vol.8
, pp. 7-17
-
-
Focacci, F.1
Lodi, A.2
Milano, M.3
-
18
-
-
85166265327
-
Solving scheduling problems with setup times and alternative resources
-
Focacci, F., Laborie, P., Nuijten, W. (2000). Solving scheduling problems with setup times and alternative resources. AIPS 2000 Proceedings (pp. 92-101).
-
(2000)
AIPS 2000 Proceedings
, pp. 92-101
-
-
Focacci, F.1
Laborie, P.2
Nuijten, W.3
-
19
-
-
33748428961
-
Extending an algebraic modeling language to support constraint programming
-
1946294 1238.90113 10.1287/ijoc.14.4.322.2825
-
Fourer, R., & Gay, D.M. (2002). Extending an algebraic modeling language to support constraint programming. INFORMS Journal on Computing, 14(4), 322-344.
-
(2002)
INFORMS Journal on Computing
, vol.14
, Issue.4
, pp. 322-344
-
-
Fourer, R.1
Gay, D.M.2
-
21
-
-
0019067870
-
Increasing tree search efficiency for constraint satisfaction problems
-
10.1016/0004-3702(80)90051-X
-
Haralick, R.M., & Elliott, G.L. (1980). Increasing tree search efficiency for constraint satisfaction problems, Artificial Intelligence, 14, 263-314.
-
(1980)
Artificial Intelligence
, vol.14
, pp. 263-314
-
-
Haralick, R.M.1
Elliott, G.L.2
-
22
-
-
4143132806
-
Constraint and integer programming in OPL
-
1946295 1238.90102 10.1287/ijoc.14.4.345.2826
-
Hentenryck, P. (2002). Constraint and integer programming in OPL. INFORMS Journal on Computing, 14(4), 345-372.
-
(2002)
INFORMS Journal on Computing
, vol.14
, Issue.4
, pp. 345-372
-
-
Hentenryck, P.1
-
23
-
-
84976509455
-
Search and strategies in OPL
-
1858926 10.1145/359496.359529
-
Hentenryck, P., Perron, L., Puget, J.F. (2000). Search and strategies in OPL. ACM Transactions on Computational Logic, 1(2), 285-320.
-
(2000)
ACM Transactions on Computational Logic
, vol.1
, Issue.2
, pp. 285-320
-
-
Hentenryck, P.1
Perron, L.2
Puget, J.F.3
-
26
-
-
77956722051
-
Global Constraints
-
F. Rossi van Beek T. Walsh (eds) Elsevier Science Amsterdam 10.1016/S1574-6526(06)80010-6
-
Hoeve, W., Katriel, I. (2006). Global Constraints. In Rossi, F., van Beek, P., Walsh, T. (Ed.), Handbook of constraint programming (pp. 169-208). Elsevier Science, Amsterdam.
-
(2006)
Handbook of Constraint Programming
, pp. 169-208
-
-
Hoeve, W.1
Katriel, I.2
-
28
-
-
0010986664
-
Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems
-
1869880 1238.90106 10.1287/ijoc.13.4.258.9733
-
Jain, V., & Grossmann, I.E. (2001). Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems. INFORMS Journal on Computing, 13(4), 258-276.
-
(2001)
INFORMS Journal on Computing
, vol.13
, Issue.4
, pp. 258-276
-
-
Jain, V.1
Grossmann, I.E.2
-
29
-
-
46149104167
-
Line balancing and model sequencing to reduce work overload in mixed-model U-line production environments
-
2437620 10.1080/03052150801982509
-
Kara, Y. (2008). Line balancing and model sequencing to reduce work overload in mixed-model U-line production environments. Engineering Optimization, 40(7), 669-684.
-
(2008)
Engineering Optimization
, vol.40
, Issue.7
, pp. 669-684
-
-
Kara, Y.1
-
30
-
-
0037508541
-
Assembly line balancing in a mixed-model sequencing environment with synchronous transfers
-
1993142 1103.68117 10.1016/S0377-2217(02)00764-6
-
KarabatI, S., & SayIn, S. (2003). Assembly line balancing in a mixed-model sequencing environment with synchronous transfers. European Journal of Operational Research, 149, 417-429.
-
(2003)
European Journal of Operational Research
, vol.149
, pp. 417-429
-
-
Karabati, S.1
Sayin, S.2
-
31
-
-
33748920331
-
Integrated production and material handling scheduling using mathematical programming and constraint programming
-
1142.90371 10.1016/j.ejor.2005.02.077
-
Khayat, G.E., Langevin, A., Riopel, D. (2006). Integrated production and material handling scheduling using mathematical programming and constraint programming. European Journal of Operations Research, 175, 1818-1832.
-
(2006)
European Journal of Operations Research
, vol.175
, pp. 1818-1832
-
-
Khayat, G.E.1
Langevin, A.2
Riopel, D.3
-
32
-
-
0000945761
-
A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines
-
10.1023/A:1026568011013
-
Kim, Y.K., Kim, J.Y., Kim, Y. (2000a). A coevolutionary algorithm for balancing and sequencing in mixed model assembly lines. Applied Intelligence, 13, 247-258.
-
(2000)
Applied Intelligence
, vol.13
, pp. 247-258
-
-
Kim, Y.K.1
Kim, J.Y.2
Kim, Y.3
-
33
-
-
0034588691
-
Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm
-
10.1080/095372800750038355
-
Kim, Y.K., Kim, S.J., Kim, J.Y. (2000b). Balancing and sequencing mixed-model U-lines with a co-evolutionary algorithm. Production Planning & Control, 11, 754-764.
-
(2000)
Production Planning & Control
, vol.11
, pp. 754-764
-
-
Kim, Y.K.1
Kim, S.J.2
Kim, J.Y.3
-
34
-
-
25144469836
-
An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
-
2169614 1083.90016 10.1016/j.ejor.2004.07.032
-
Kim, Y.K., Kim, J.Y., Kim, Y. (2006). An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines. European Journal of Operational Research, 168, 838-852.
-
(2006)
European Journal of Operational Research
, vol.168
, pp. 838-852
-
-
Kim, Y.K.1
Kim, J.Y.2
Kim, Y.3
-
35
-
-
77956263251
-
On supporting Lean methodologies using constraint-based scheduling
-
10.1007/s10951-009-0144-6
-
Krogt R., Geraghty J., Salman M.R., Little J. (2010). On supporting Lean methodologies using constraint-based scheduling. Journal of Scheduling, 13, 301-314.
-
(2010)
Journal of Scheduling
, vol.13
, pp. 301-314
-
-
Krogt, R.1
Geraghty, J.2
Salman, M.R.3
Little, J.4
-
38
-
-
70350510857
-
Reasoning with conditional time-intervals, Part II: An algebraical model for resources
-
Laborie, P., Rogerie, J., Shaw, P., Vilím, P. (2009). Reasoning with conditional time-intervals, Part II: An algebraical model for resources. In Proc. 22th international FLAIRS conference (FLAIRS 2009) (pp. 201-206).
-
(2009)
Proc. 22th International FLAIRS Conference (FLAIRS 2009)
, pp. 201-206
-
-
Laborie, P.1
-
39
-
-
74549129380
-
Heuristic procedures for solving the general assembly line balancing problem with setups
-
10.1080/00207540802577979
-
Martino, L. & Pastor, R. (2010). Heuristic procedures for solving the general assembly line balancing problem with setups. International Journal of Production Research, 48(6), 1787-1804.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.6
, pp. 1787-1804
-
-
Martino, L.1
Pastor, R.2
-
40
-
-
0032643432
-
Balancing and sequencing manual mixed-model assembly lines
-
0949.90570 10.1080/002075499190545
-
Merengo, C., Nava, F., Pozzetti, A. (1999). Balancing and sequencing manual mixed-model assembly lines. International Journal of Production Research, 37(12), 2835-2860.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.12
, pp. 2835-2860
-
-
Merengo, C.1
Nava, F.2
Pozzetti, A.3
-
41
-
-
33748528934
-
Integrating operations research in constraint programming
-
2262088 1125.90392
-
Milano, M., & Wallace, M. (2006). Integrating operations research in constraint programming. OR, 4, 175-219.
-
(2006)
OR
, vol.4
, pp. 175-219
-
-
Milano, M.1
Wallace, M.2
-
42
-
-
29244479778
-
The role of integer programming techniques in constraint programming's global constraints
-
1946297 1238.90101 10.1287/ijoc.14.4.387.2830
-
Milano, M., Ottosson, G., Refalo, P., Thorsteinsson, E.S. (2002). The role of integer programming techniques in constraint programming's global constraints. INFORMS Journal on Computing, 14(4), 387-402.
-
(2002)
INFORMS Journal on Computing
, vol.14
, Issue.4
, pp. 387-402
-
-
Milano, M.1
Ottosson, G.2
Refalo, P.3
Thorsteinsson, E.S.4
-
43
-
-
0036538669
-
Balancing and scheduling mixed-model U-shaped production lines
-
10.1023/A:1014434117888
-
Miltenburg, J. (2002). Balancing and scheduling mixed-model U-shaped production lines. International Journal of Flexible Manufacturing Systems, 14, 119-151.
-
(2002)
International Journal of Flexible Manufacturing Systems
, vol.14
, pp. 119-151
-
-
Miltenburg, J.1
-
44
-
-
0141678844
-
Mixed global constraints and inference in hybrid CLP-IP solvers
-
1896106 1026.90062 10.1023/A:1014440424150
-
Ottosson, G., Thorsteinsson, E.S., Hooker, J.N. (2002). Mixed global constraints and inference in hybrid CLP-IP solvers. Annals of Mathematics and Artificial Intelligence, 34(4), 271-290.
-
(2002)
Annals of Mathematics and Artificial Intelligence
, vol.34
, Issue.4
, pp. 271-290
-
-
Ottosson, G.1
Thorsteinsson, E.S.2
Hooker, J.N.3
-
45
-
-
77954577006
-
Balancing two-sided assembly lines with sequence-dependent setup times
-
10.1080/00207540903140750
-
Özcan, U., & Toklu, B. (2009). Balancing two-sided assembly lines with sequence-dependent setup times. International Journal of Production Research, 48(18), 5363-5383.
-
(2009)
International Journal of Production Research
, vol.48
, Issue.18
, pp. 5363-5383
-
-
Özcan, U.1
Toklu, B.2
-
47
-
-
38049048184
-
Evaluating optimization models to solve SALBP
-
10.1007/978-3-540-74472-6-65
-
Pastor, R., Ferrer, L., Garcia, A. (2007). Evaluating optimization models to solve SALBP. Lecture Notes in Computer Science, 2007(4705), 791-803.
-
(2007)
Lecture Notes in Computer Science
, vol.2007
, Issue.4705
, pp. 791-803
-
-
Pastor, R.1
Ferrer, L.2
Garcia, A.3
-
49
-
-
70350501947
-
Generating robust schedules through temporal flexibility
-
Policella, N., Cesta, A., Oddi, A., Smith, S. (2004). Generating robust schedules through temporal flexibility. In Proc. ICAPS 04.
-
(2004)
Proc. ICAPS 04
-
-
Policella, N.1
Cesta, A.2
Oddi, A.3
Smith, S.4
-
50
-
-
0346906732
-
Constraint programming and maths programming
-
0994.90133 10.1017/S0269888901000042
-
Puget, J.F., & Lustig, I. (2001). Constraint programming and maths programming. Knowledge Engineering Review, 16(1), 5-23.
-
(2001)
Knowledge Engineering Review
, vol.16
, Issue.1
, pp. 5-23
-
-
Puget, J.F.1
Lustig, I.2
-
52
-
-
0034692663
-
Simultaneous vs. sequential loading and scheduling of flexible assembly systems
-
1094.90563 10.1080/002075400418252
-
Sawik, T. (2000). Simultaneous vs. sequential loading and scheduling of flexible assembly systems. International Journal of Production Research, 38, 3267-3282.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 3267-3282
-
-
Sawik, T.1
-
53
-
-
0037121160
-
Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
-
1922624 1073.90514 10.1016/S0377-2217(01)00328-9
-
Sawik, T. (2002). Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. European Journal of Operational Research, 143, 115-124.
-
(2002)
European Journal of Operational Research
, vol.143
, pp. 115-124
-
-
Sawik, T.1
-
54
-
-
0345306112
-
Loading and Scheculing of a flexible assembly system by mixed integer programming
-
2025657 0176.13301 10.1016/S0377-2217(02)00795-6
-
Sawik, T. (2004). Loading and Scheculing of a flexible assembly system by mixed integer programming. European Journal of Operational Research, 154, 1-19.
-
(2004)
European Journal of Operational Research
, vol.154
, pp. 1-19
-
-
Sawik, T.1
-
56
-
-
43449085514
-
The sequence-dependent assembly line balancing problem
-
2399508 1193.90235 10.1007/s00291-006-0070-3
-
Scholl, A., Boysen N., Fliedner M. (2008). The sequence-dependent assembly line balancing problem. OR Spectrum, 30(3), 579-609.
-
(2008)
OR Spectrum
, vol.30
, Issue.3
, pp. 579-609
-
-
Scholl, A.1
Boysen, N.2
Fliedner, M.3
-
57
-
-
84871947722
-
The assembly line balancing and scheduling problem with sequence-dependent setup times: Problem extension, model formulation and efficient heuristics
-
doi: 10.1007/s00291-011-0265-0
-
Scholl, A., Boysen, N., Fliedner, M. (2011). The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics. OR Spectrum. doi: 10.1007/s00291-011-0265-0.
-
(2011)
OR Spectrum
-
-
Scholl, A.1
Boysen, N.2
Fliedner, M.3
-
58
-
-
77956784132
-
Modelling
-
F. Rossi van Beek T. Walsh (eds) Elsevier Science Amsterdam 10.1016/S1574-6526(06)80015-5
-
Smith, B. (2006). Modelling. In Rossi, F., van Beek, P., Walsh, T. (Eds.), Handbook of constraint programming (pp. 377-406). Elsevier Science, Amsterdam.
-
(2006)
Handbook of Constraint Programming
, pp. 377-406
-
-
Smith, B.1
-
59
-
-
8344285672
-
On selecting and scheduling assembly plans using constraint programming
-
10.1007/978-3-540-45226-3-180
-
Valle, C.D., Marquez, A.A., Gasca, R.M., Toro, M. (2003). On selecting and scheduling assembly plans using constraint programming. Lecture notes in computer science, 2003(2774), 1329-1336.
-
(2003)
Lecture Notes in Computer Science
, vol.2003
, Issue.2774
, pp. 1329-1336
-
-
Valle, C.D.1
Marquez, A.A.2
Gasca, R.M.3
Toro, M.4
-
60
-
-
0032651420
-
A column-generation approach for the assembly system design problem with tool changes
-
1688130 10.1023/A:1008067422364
-
Wilhelm, W.E. (1999). A column-generation approach for the assembly system design problem with tool changes. International Journal of Flexible Manufacturing Systems, 11, 177-205.
-
(1999)
International Journal of Flexible Manufacturing Systems
, vol.11
, pp. 177-205
-
-
Wilhelm, W.E.1
-
61
-
-
34547246295
-
Production smoothing in just-in-time manufacturing systems: A review of the models and solution approaches
-
1160.90464 10.1080/00207540701223410
-
Yavuz, M., & Akcali, E. (2007). Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches. International Journal of Production Research, 45(16), 3579-3597.
-
(2007)
International Journal of Production Research
, vol.45
, Issue.16
, pp. 3579-3597
-
-
Yavuz, M.1
Akcali, E.2
-
62
-
-
75749089533
-
A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations
-
10.1016/j.engappai.2009.07.002
-
Zeballos, L.J., Quiroga, O.D., Henning, G.P. (2010). A constraint programming model for the scheduling of flexible manufacturing systems with machine and tool limitations. Engineering Applications of Artificial Intelligence, 23, 229-248.
-
(2010)
Engineering Applications of Artificial Intelligence
, vol.23
, pp. 229-248
-
-
Zeballos, L.J.1
Quiroga, O.D.2
Henning, G.P.3
|