-
1
-
-
33846919290
-
Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
-
10.1016/j.ijpe.2006.09.009
-
F. A. Abdulmalek J. Rajgopal 2007 Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study International Journal of Production Economics 107 223 236 10.1016/j.ijpe.2006.09.009
-
(2007)
International Journal of Production Economics
, vol.107
, pp. 223-236
-
-
Abdulmalek, F.A.1
Rajgopal, J.2
-
2
-
-
77956264179
-
Sustainability
-
Lean Enterpreise Research Centre, Cardiff, UK, April 2002
-
Bateman, N. (2002). Sustainability. In Lean enterprise research centre publication (pp. 2-24). Lean Enterpreise Research Centre, Cardiff, UK, April 2002.
-
(2002)
Lean Enterprise Research Centre Publication
, pp. 2-24
-
-
Bateman, N.1
-
5
-
-
0030416316
-
Supporting manufacturing with simulation: Model design, development, and deployment
-
Chance, F., Robinson, J., & Fowler, J. W. (1996). Supporting manufacturing with simulation: model design, development, and deployment. In Proceedings of the 1996 winter simulation conference (pp. 114-121).
-
(1996)
Proceedings of the 1996 Winter Simulation Conference
, pp. 114-121
-
-
Chance, F.1
Robinson, J.2
Fowler, J.W.3
-
6
-
-
0032046474
-
Optimum junction point location and inventory levels in serial hybrid push/pull production systems
-
10.1080/002075498193561
-
J. K. Cochran S.-S. Kim 1998 Optimum junction point location and inventory levels in serial hybrid push/pull production systems International Journal of Production Research 36 4 1141 1155 10.1080/002075498193561
-
(1998)
International Journal of Production Research
, vol.36
, Issue.4
, pp. 1141-1155
-
-
Cochran, J.K.1
Kim, S.-S.2
-
7
-
-
0034688387
-
Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
-
10.1080/002075400189509
-
R. B. Detty J. C. Yingling 2000 Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study International Journal of Production Research 38 2 429 445 10.1080/002075400189509
-
(2000)
International Journal of Production Research
, vol.38
, Issue.2
, pp. 429-445
-
-
Detty, R.B.1
Yingling, J.C.2
-
10
-
-
46649107399
-
Running like clockwork
-
A. Gregory 2004 Running like clockwork Works Management 57 2 14 17
-
(2004)
Works Management
, vol.57
, Issue.2
, pp. 14-17
-
-
Gregory, A.1
-
11
-
-
0026168681
-
Optimal hybrid push/pull control strategies for a parallel multistage system: Part i
-
10.1080/00207549108930133
-
T. J. Hodgson D. Wang 1991 Optimal hybrid push/pull control strategies for a parallel multistage system: Part I International Journal of Production Research 29 6 1279 1287 10.1080/00207549108930133
-
(1991)
International Journal of Production Research
, vol.29
, Issue.6
, pp. 1279-1287
-
-
Hodgson, T.J.1
Wang, D.2
-
12
-
-
0026187108
-
Optimal hybrid push/pull control strategies for a parallel multistage system: Part II
-
10.1080/00207549108948022
-
T. J. Hodgson D. Wang 1991 Optimal hybrid push/pull control strategies for a parallel multistage system: Part II International Journal of Production Research 29 7 1453 1460 10.1080/00207549108948022
-
(1991)
International Journal of Production Research
, vol.29
, Issue.7
, pp. 1453-1460
-
-
Hodgson, T.J.1
Wang, D.2
-
16
-
-
0002303124
-
Triumph of the lean production system
-
J. Krafcik 1988 Triumph of the lean production system Sloan Management Review 30 1 41 52
-
(1988)
Sloan Management Review
, vol.30
, Issue.1
, pp. 41-52
-
-
Krafcik, J.1
-
18
-
-
77956264355
-
Time-versus-capacity compromises in project scheduling
-
LePape, C., Couronne, P., Vergamini, D., & Gosselin, V. (1994). Time-versus-capacity compromises in project scheduling. In Proceedings of the thirteenth workshop of the UK planning special interest grouppages (pp. 39-45).
-
(1994)
Proceedings of the Thirteenth Workshop of the UK Planning Special Interest Grouppages
, pp. 39-45
-
-
Lepape, C.1
Couronne, P.2
Vergamini, D.3
Gosselin, V.4
-
26
-
-
77956268120
-
Burt's bees implementation of production processes
-
2-4
-
Parker, V. (2003). Burt's bees implementation of production processes. Tribune Business News, (1-3), 2-4.
-
(2003)
Tribune Business News
, pp. 1-3
-
-
Parker, V.1
-
28
-
-
29144525644
-
Lincoln looks leaner in its manufacturing process
-
April 2001
-
Prizinsky, D. (2001). Lincoln looks leaner in its manufacturing process. In Crains Cleveland business (pp. 1-8). April 2001.
-
(2001)
Crains Cleveland Business
, pp. 1-8
-
-
Prizinsky, D.1
-
29
-
-
0038351785
-
Dynamic scheduling and line balancing methods, and software tools for lean and reconfigurable disassembly cells and lines
-
Ranky, P. G., Subramanyam, M., Caudill, R. J., Limaye, K., & Alli, N. (2003). Dynamic scheduling and line balancing methods, and software tools for lean and reconfigurable disassembly cells and lines. In Proceedings of the IEEE international symposium on electronics and the environment (pp. 234-239).
-
(2003)
Proceedings of the IEEE International Symposium on Electronics and the Environment
, pp. 234-239
-
-
Ranky, P.G.1
Subramanyam, M.2
Caudill, R.J.3
Limaye, K.4
Alli, N.5
-
30
-
-
77956263878
-
-
Reprint from Gale Group, 20 August
-
Rea, D. (2002). Following the lean route. Reprint from Gale Group, 20 August 2002.
-
(2002)
Following the Lean Route
-
-
Rea, D.1
-
32
-
-
18444388771
-
-
McGraw-Hill New York
-
Rowlands, D., Maxey, J., George, M., & Price, M. (2004). The lean six sigma pocket toolbook: A quick reference guide to 100 tools for improving quality and speed. New York: McGraw-Hill.
-
(2004)
The Lean Six Sigma Pocket Toolbook: A Quick Reference Guide to 100 Tools for Improving Quality and Speed
-
-
Rowlands, D.1
Maxey, J.2
George, M.3
Price, M.4
-
33
-
-
84864160402
-
-
SAP (2008). SAP lean planning and operations.
-
SAP (2008). SAP lean planning and operations. http://www.sap.com/ solutions/manufacturing/lean-planning-and-operations-software/index.epx, retrieved June 23 2008.
-
-
-
-
34
-
-
4344717123
-
Simulation as a tool in understanding the concepts of lean manufacturing
-
10.1177/0037549704045049
-
B. J. Schroer 2004 Simulation as a tool in understanding the concepts of lean manufacturing Simulation 80 3 171 175 10.1177/0037549704045049
-
(2004)
Simulation
, vol.80
, Issue.3
, pp. 171-175
-
-
Schroer, B.J.1
-
35
-
-
0037357671
-
Lean manufacturing: Context, practice bundles, and performance
-
10.1016/S0272-6963(02)00108-0
-
R. Shah P. T. Ward 2003 Lean manufacturing: Context, practice bundles, and performance Journal of Operations Management 21 2 129 149 10.1016/S0272-6963(02)00108-0
-
(2003)
Journal of Operations Management
, vol.21
, Issue.2
, pp. 129-149
-
-
Shah, R.1
Ward, P.T.2
-
36
-
-
29144508882
-
Cessna tackles lean manufacturing
-
P. Siekman 2000 Cessna tackles lean manufacturing Fortune 141 222 231
-
(2000)
Fortune
, vol.141
, pp. 222-231
-
-
Siekman, P.1
-
37
-
-
0035855086
-
Toyota alters face of production
-
P. Strozniak 2001 Toyota alters face of production Industry Week 250 11 46
-
(2001)
Industry Week
, vol.250
, Issue.11
, pp. 46
-
-
Strozniak, P.1
-
38
-
-
24944457399
-
Running lean running strong: Lean manufacturing processes lead to a stronger, more efficient business
-
Trombly, R. (2002). Running lean running strong: lean manufacturing processes lead to a stronger, more efficient business. Reprint from Gale Group, August 2002.
-
(2002)
Reprint from Gale Group, August
-
-
Trombly, R.1
-
40
-
-
38149119675
-
Scheduling for cellular manufacturing
-
van der Krogt, R., Little, J., Pulliam, K., Hanhilammi, S., & Jin, Y. (2007). Scheduling for cellular manufacturing. In Proceedings of the thirteenth international conference on principles and practice of constraint programming (CP-07) (pp. 105-117).
-
(2007)
Proceedings of the Thirteenth International Conference on Principles and Practice of Constraint Programming (CP-07)
, pp. 105-117
-
-
Van Der Krogt, R.1
Little, J.2
Pulliam, K.3
Hanhilammi, S.4
Jin, Y.5
-
44
-
-
0030230721
-
Using anytime algorithms in intelligent systems
-
S. Zilberstein 1996 Using anytime algorithms in intelligent systems AI Magazine 17 3 73 83
-
(1996)
AI Magazine
, vol.17
, Issue.3
, pp. 73-83
-
-
Zilberstein, S.1
|