메뉴 건너뛰기




Volumn 13, Issue 4, 2010, Pages 301-314

On supporting Lean methodologies using constraint-based scheduling

Author keywords

Constraint programming; Lean manufacturing; Scheduling

Indexed keywords

COMPLEX ENVIRONMENTS; CONSTRAINT PROGRAMMING; CONSTRAINT-BASED; CONSTRAINT-BASED SCHEDULING; LEAN MANUFACTURING; PLANNING SUPPORT; PROCESS MANAGEMENT; PRODUCTION PROCESS; SCHEDULING TOOLS; SHOW THROUGH; SMOOTH TRANSITIONS;

EID: 77956263251     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-009-0144-6     Document Type: Article
Times cited : (8)

References (45)
  • 1
    • 33846919290 scopus 로고    scopus 로고
    • Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study
    • 10.1016/j.ijpe.2006.09.009
    • F. A. Abdulmalek J. Rajgopal 2007 Analyzing the benefits of lean manufacturing and value stream mapping via simulation: a process sector case study International Journal of Production Economics 107 223 236 10.1016/j.ijpe.2006.09.009
    • (2007) International Journal of Production Economics , vol.107 , pp. 223-236
    • Abdulmalek, F.A.1    Rajgopal, J.2
  • 2
    • 77956264179 scopus 로고    scopus 로고
    • Sustainability
    • Lean Enterpreise Research Centre, Cardiff, UK, April 2002
    • Bateman, N. (2002). Sustainability. In Lean enterprise research centre publication (pp. 2-24). Lean Enterpreise Research Centre, Cardiff, UK, April 2002.
    • (2002) Lean Enterprise Research Centre Publication , pp. 2-24
    • Bateman, N.1
  • 6
    • 0032046474 scopus 로고    scopus 로고
    • Optimum junction point location and inventory levels in serial hybrid push/pull production systems
    • 10.1080/002075498193561
    • J. K. Cochran S.-S. Kim 1998 Optimum junction point location and inventory levels in serial hybrid push/pull production systems International Journal of Production Research 36 4 1141 1155 10.1080/002075498193561
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 1141-1155
    • Cochran, J.K.1    Kim, S.-S.2
  • 7
    • 0034688387 scopus 로고    scopus 로고
    • Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
    • 10.1080/002075400189509
    • R. B. Detty J. C. Yingling 2000 Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study International Journal of Production Research 38 2 429 445 10.1080/002075400189509
    • (2000) International Journal of Production Research , vol.38 , Issue.2 , pp. 429-445
    • Detty, R.B.1    Yingling, J.C.2
  • 10
    • 46649107399 scopus 로고    scopus 로고
    • Running like clockwork
    • A. Gregory 2004 Running like clockwork Works Management 57 2 14 17
    • (2004) Works Management , vol.57 , Issue.2 , pp. 14-17
    • Gregory, A.1
  • 11
    • 0026168681 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part i
    • 10.1080/00207549108930133
    • T. J. Hodgson D. Wang 1991 Optimal hybrid push/pull control strategies for a parallel multistage system: Part I International Journal of Production Research 29 6 1279 1287 10.1080/00207549108930133
    • (1991) International Journal of Production Research , vol.29 , Issue.6 , pp. 1279-1287
    • Hodgson, T.J.1    Wang, D.2
  • 12
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part II
    • 10.1080/00207549108948022
    • T. J. Hodgson D. Wang 1991 Optimal hybrid push/pull control strategies for a parallel multistage system: Part II International Journal of Production Research 29 7 1453 1460 10.1080/00207549108948022
    • (1991) International Journal of Production Research , vol.29 , Issue.7 , pp. 1453-1460
    • Hodgson, T.J.1    Wang, D.2
  • 16
    • 0002303124 scopus 로고
    • Triumph of the lean production system
    • J. Krafcik 1988 Triumph of the lean production system Sloan Management Review 30 1 41 52
    • (1988) Sloan Management Review , vol.30 , Issue.1 , pp. 41-52
    • Krafcik, J.1
  • 26
    • 77956268120 scopus 로고    scopus 로고
    • Burt's bees implementation of production processes
    • 2-4
    • Parker, V. (2003). Burt's bees implementation of production processes. Tribune Business News, (1-3), 2-4.
    • (2003) Tribune Business News , pp. 1-3
    • Parker, V.1
  • 28
    • 29144525644 scopus 로고    scopus 로고
    • Lincoln looks leaner in its manufacturing process
    • April 2001
    • Prizinsky, D. (2001). Lincoln looks leaner in its manufacturing process. In Crains Cleveland business (pp. 1-8). April 2001.
    • (2001) Crains Cleveland Business , pp. 1-8
    • Prizinsky, D.1
  • 30
    • 77956263878 scopus 로고    scopus 로고
    • Reprint from Gale Group, 20 August
    • Rea, D. (2002). Following the lean route. Reprint from Gale Group, 20 August 2002.
    • (2002) Following the Lean Route
    • Rea, D.1
  • 33
    • 84864160402 scopus 로고    scopus 로고
    • SAP (2008). SAP lean planning and operations.
    • SAP (2008). SAP lean planning and operations. http://www.sap.com/ solutions/manufacturing/lean-planning-and-operations-software/index.epx, retrieved June 23 2008.
  • 34
    • 4344717123 scopus 로고    scopus 로고
    • Simulation as a tool in understanding the concepts of lean manufacturing
    • 10.1177/0037549704045049
    • B. J. Schroer 2004 Simulation as a tool in understanding the concepts of lean manufacturing Simulation 80 3 171 175 10.1177/0037549704045049
    • (2004) Simulation , vol.80 , Issue.3 , pp. 171-175
    • Schroer, B.J.1
  • 35
    • 0037357671 scopus 로고    scopus 로고
    • Lean manufacturing: Context, practice bundles, and performance
    • 10.1016/S0272-6963(02)00108-0
    • R. Shah P. T. Ward 2003 Lean manufacturing: Context, practice bundles, and performance Journal of Operations Management 21 2 129 149 10.1016/S0272-6963(02)00108-0
    • (2003) Journal of Operations Management , vol.21 , Issue.2 , pp. 129-149
    • Shah, R.1    Ward, P.T.2
  • 36
    • 29144508882 scopus 로고    scopus 로고
    • Cessna tackles lean manufacturing
    • P. Siekman 2000 Cessna tackles lean manufacturing Fortune 141 222 231
    • (2000) Fortune , vol.141 , pp. 222-231
    • Siekman, P.1
  • 37
    • 0035855086 scopus 로고    scopus 로고
    • Toyota alters face of production
    • P. Strozniak 2001 Toyota alters face of production Industry Week 250 11 46
    • (2001) Industry Week , vol.250 , Issue.11 , pp. 46
    • Strozniak, P.1
  • 38
    • 24944457399 scopus 로고    scopus 로고
    • Running lean running strong: Lean manufacturing processes lead to a stronger, more efficient business
    • Trombly, R. (2002). Running lean running strong: lean manufacturing processes lead to a stronger, more efficient business. Reprint from Gale Group, August 2002.
    • (2002) Reprint from Gale Group, August
    • Trombly, R.1
  • 44
    • 0030230721 scopus 로고    scopus 로고
    • Using anytime algorithms in intelligent systems
    • S. Zilberstein 1996 Using anytime algorithms in intelligent systems AI Magazine 17 3 73 83
    • (1996) AI Magazine , vol.17 , Issue.3 , pp. 73-83
    • Zilberstein, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.