-
1
-
-
0034060739
-
Economic lot sizing with consideration of random machine unavailability time
-
N.E. Abboud, M.Y. Jaber, and N.A. Noueihed Economic lot sizing with consideration of random machine unavailability time Computers & Operations Research 27 4 2000 335 351
-
(2000)
Computers & Operations Research
, vol.27
, Issue.4
, pp. 335-351
-
-
Abboud, N.E.1
Jaber, M.Y.2
Noueihed, N.A.3
-
2
-
-
0035247534
-
A discrete-time Markov production-inventory model with machine breakdowns
-
N.E. Abboud A discrete-time Markov production-inventory model with machine breakdowns Computers & Industrial Engineering 39 2001 95 107
-
(2001)
Computers & Industrial Engineering
, vol.39
, pp. 95-107
-
-
Abboud, N.E.1
-
4
-
-
84985846646
-
A joint economic lot size model for purchaser and vendor
-
A. Banerjee A joint economic lot size model for purchaser and vendor Decision Sciences 17 1986 292 311
-
(1986)
Decision Sciences
, vol.17
, pp. 292-311
-
-
Banerjee, A.1
-
5
-
-
4644312239
-
Integrated single vendor single buyer model with stochastic demand and variable lead time
-
M. Ben-Daya, and M. Hariga Integrated single vendor single buyer model with stochastic demand and variable lead time International Journal of Production Economics 92 2004 75 80
-
(2004)
International Journal of Production Economics
, vol.92
, pp. 75-80
-
-
Ben-Daya, M.1
Hariga, M.2
-
6
-
-
33745155074
-
Optimal inspection and economical production quantity strategy for an imperfect production process
-
Y.C. Chen Optimal inspection and economical production quantity strategy for an imperfect production process International Journal of Systems Science 37 5 2006 295 302
-
(2006)
International Journal of Systems Science
, vol.37
, Issue.5
, pp. 295-302
-
-
Chen, Y.C.1
-
7
-
-
48849111365
-
Optimal run time for EMQ model with backordering, failure-in-rework and breakdown happening in stock-piling time
-
Y.S.P Chiu, S.S Wang, C.K. Ting, H.J. Chuang, and Y.L. Lien Optimal run time for EMQ model with backordering, failure-in-rework and breakdown happening in stock-piling time WSEAS Transaction on Information Science & Applications 4 2008 475 486
-
(2008)
WSEAS Transaction on Information Science & Applications
, vol.4
, pp. 475-486
-
-
Chiu, S.P.1
Wang, S.S.2
Ting, C.K.3
Chuang, H.J.4
Lien, Y.L.5
-
8
-
-
78649843827
-
Economic production quantity model for deteriorating inventory with random machine unavailability and shortage
-
C.J. Chung, G.A. Widyadana, and H.M. Wee Economic production quantity model for deteriorating inventory with random machine unavailability and shortage International Journal of Production Research 49 2011 883 902
-
(2011)
International Journal of Production Research
, vol.49
, pp. 883-902
-
-
Chung, C.J.1
Widyadana, G.A.2
Wee, H.M.3
-
9
-
-
35348992049
-
Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy
-
S. El-Ferik Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy European Journal of Operational Research 186 2008 150 163
-
(2008)
European Journal of Operational Research
, vol.186
, pp. 150-163
-
-
El-Ferik, S.1
-
10
-
-
33749988426
-
Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost
-
K. Ertogral, M. Darwish, and M. Ben-Daya Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost European Journal of Operational Research 176 2007 1592 1606
-
(2007)
European Journal of Operational Research
, vol.176
, pp. 1592-1606
-
-
Ertogral, K.1
Darwish, M.2
Ben-Daya, M.3
-
11
-
-
19944389627
-
Computational aspects of an extended EMQ model with variable production rate
-
B.C. Giri, and T. Dohi Computational aspects of an extended EMQ model with variable production rate Computers & Operations Research 32 2005 3143 3161
-
(2005)
Computers & Operations Research
, vol.32
, pp. 3143-3161
-
-
Giri, B.C.1
Dohi, T.2
-
12
-
-
0343081532
-
Determination of economic production-shipment policy for a single-vendor-single-buyer system
-
S.K. Goyal, and F. Nebebe Determination of economic production-shipment policy for a single-vendor-single-buyer system European Journal of Operational Research 121 2000 175 178
-
(2000)
European Journal of Operational Research
, vol.121
, pp. 175-178
-
-
Goyal, S.K.1
Nebebe, F.2
-
14
-
-
0033747626
-
An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment
-
M.A. Hoque, and S.K. Goyal An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment International Journal of Production Economics 65 2000 305 315
-
(2000)
International Journal of Production Economics
, vol.65
, pp. 305-315
-
-
Hoque, M.A.1
Goyal, S.K.2
-
15
-
-
3242717595
-
An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration
-
C.K. Huang An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration International Journal of Production Economics 91 2004 91 98
-
(2004)
International Journal of Production Economics
, vol.91
, pp. 91-98
-
-
Huang, C.K.1
-
16
-
-
0035782495
-
The impact of random machine unavailability on inventory policies in a continuous improvement environment
-
M.Y. Jaber, and N.E. Abboud The impact of random machine unavailability on inventory policies in a continuous improvement environment Production Planning & Control 12 2001 754 763
-
(2001)
Production Planning & Control
, vol.12
, pp. 754-763
-
-
Jaber, M.Y.1
Abboud, N.E.2
-
17
-
-
33748316562
-
Coordinating a two-level supply chain with delay in payments and profit sharing
-
M.Y. Jaber, and I.H. Osman Coordinating a two-level supply chain with delay in payments and profit sharing Computers & Industrial Engineering 50 2006 385 400
-
(2006)
Computers & Industrial Engineering
, vol.50
, pp. 385-400
-
-
Jaber, M.Y.1
Osman, I.H.2
-
18
-
-
0041862633
-
A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage
-
S.L. Kim, and D. Ha A JIT lot-splitting model for supply chain management: Enhancing buyer-supplier linkage International Journal of Production Economics 86 2003 1 10
-
(2003)
International Journal of Production Economics
, vol.86
, pp. 1-10
-
-
Kim, S.L.1
Ha, D.2
-
19
-
-
67349172139
-
An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost
-
Y.J. Lin An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost Computers & Industrial Engineering 56 2009 1597 1606
-
(2009)
Computers & Industrial Engineering
, vol.56
, pp. 1597-1606
-
-
Lin, Y.J.1
-
20
-
-
0012598250
-
The impact of preventive maintenance on system cost and buffer size
-
R.D. Meller, and D.S. Kim The impact of preventive maintenance on system cost and buffer size European Journal of Operational Research 95 1996 577 591
-
(1996)
European Journal of Operational Research
, vol.95
, pp. 577-591
-
-
Meller, R.D.1
Kim, D.S.2
-
21
-
-
33745679872
-
The impact of delivery lot splitting on delivery reliability in a two-stage supply chain
-
I.V. Nieuwenhuyse, and N. Vandaele The impact of delivery lot splitting on delivery reliability in a two-stage supply chain International Journal of Production Economics 104 2006 694 708
-
(2006)
International Journal of Production Economics
, vol.104
, pp. 694-708
-
-
Nieuwenhuyse, I.V.1
Vandaele, N.2
-
22
-
-
33846409121
-
An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation
-
S.T. Lo, H.M. Wee, and W.C Huang An integrated production-inventory model with imperfect production processes and Weibull distribution deterioration under inflation International Journal of Production Economics 106 2007 248 260
-
(2007)
International Journal of Production Economics
, vol.106
, pp. 248-260
-
-
Lo, S.T.1
Wee, H.M.2
Huang, W.C.3
-
23
-
-
61449195305
-
An integrated equal-lots policy for shipping a vendor's final production batch to a single buyer under linearly decreasing demand
-
M. Omar An integrated equal-lots policy for shipping a vendor's final production batch to a single buyer under linearly decreasing demand International Journal of Production Economics 118 2009 185 188
-
(2009)
International Journal of Production Economics
, vol.118
, pp. 185-188
-
-
Omar, M.1
-
24
-
-
37349077845
-
A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space
-
S.H.R Pasandideh, and S.T.A Niaki A genetic algorithm approach to optimize a multi-products EPQ model with discrete delivery orders and constrained space Applied Mathematics and Computation 195 2008 506 514
-
(2008)
Applied Mathematics and Computation
, vol.195
, pp. 506-514
-
-
Pasandideh, H.R.1
Niaki, T.A.2
-
25
-
-
84877583268
-
Minimizing inventory cost
-
T.E. Philips, and K.R. White Minimizing inventory cost Interfaces 11 4 1981 42 47
-
(1981)
Interfaces
, vol.11
, Issue.4
, pp. 42-47
-
-
Philips, T.E.1
White, K.R.2
-
27
-
-
32544454181
-
Optimal models for multi-stage supply chain system controlled by kanban under just-in-time philosophy
-
S. Wang, and B.R. Sarker Optimal models for multi-stage supply chain system controlled by kanban under just-in-time philosophy European Journal of Operational Research 172 2006 179 200
-
(2006)
European Journal of Operational Research
, vol.172
, pp. 179-200
-
-
Wang, S.1
Sarker, B.R.2
-
28
-
-
33846271080
-
Optimal production and shipment models for a single-vendor-single-buyer integrated system
-
Y.W. Zhou, and S.D. Wang Optimal production and shipment models for a single-vendor-single-buyer integrated system European Journal of Operational Research 180 2007 309 328
-
(2007)
European Journal of Operational Research
, vol.180
, pp. 309-328
-
-
Zhou, Y.W.1
Wang, S.D.2
|