-
1
-
-
0024108191
-
Economic design of x̃ chart under weibull shock models
-
P.K. Banerjee and M.A. Rahim, "Economic design of x̃ chart under weibull shock models", Technometrics, 30, pp. 407-414, 1988.
-
(1988)
Technometrics
, vol.30
, pp. 407-414
-
-
Banerjee, P.K.1
Rahim, M.A.2
-
2
-
-
0037061529
-
The economic production lot-sizing problem with imperfect production process and imperfect maintenance
-
M. Ben-Daya, "The economic production lot-sizing problem with imperfect production process and imperfect maintenance", International Journal of Production Economics, 76, pp. 257-264, 2002.
-
(2002)
International Journal of Production Economics
, vol.76
, pp. 257-264
-
-
Ben-Daya, M.1
-
3
-
-
0031120716
-
Optimal replacement policies with minimal repair and age-dependent cost
-
M. Chen and R.M. Feldman, "Optimal replacement policies with minimal repair and age-dependent cost", European Journal of Operational Research, 98, pp. 75-84, 1997.
-
(1997)
European Journal of Operational Research
, vol.98
, pp. 75-84
-
-
Chen, M.1
Feldman, R.M.2
-
4
-
-
0032096710
-
Note: The economic manufacturing lot-sizing problem with imperfect production process: Bounds and optimal solutions
-
M. Hariga and M. Ben-Daya, "Note: the economic manufacturing lot-sizing problem with imperfect production process: bounds and optimal solutions", Naval Research Logistics, 45, pp. 423-432, 1998.
-
(1998)
Naval Research Logistics
, vol.45
, pp. 423-432
-
-
Hariga, M.1
Ben-Daya, M.2
-
5
-
-
33745170881
-
Some results for repairable systems with general repair
-
M. Kijima, "Some results for repairable systems with general repair", Journal of Applied Probability, 49, pp. 215-223, 1997.
-
(1997)
Journal of Applied Probability
, vol.49
, pp. 215-223
-
-
Kijima, M.1
-
6
-
-
0024914068
-
A production and maintenance planning model with restoration cost dependent on detection delay
-
H.L. Lee and M.J. Rosenblatt, "A production and maintenance planning model with restoration cost dependent on detection delay", IIE Transaction, 21, pp. 368-375, 1989.
-
(1989)
IIE Transaction
, vol.21
, pp. 368-375
-
-
Lee, H.L.1
Rosenblatt, M.J.2
-
7
-
-
0002899872
-
Optimal inspection schedule in the imperfect production system under general shift distribution
-
T.M. Lin, S.T. Tseng and M.J. Liou, "Optimal inspection schedule in the imperfect production system under general shift distribution", Journal of Chinese Institute of Industrial Engineers, 8, pp. 73-81, 1991.
-
(1991)
Journal of Chinese Institute of Industrial Engineers
, vol.8
, pp. 73-81
-
-
Lin, T.M.1
Tseng, S.T.2
Liou, M.J.3
-
9
-
-
0022676316
-
Economic production cycles with imperfect production process
-
M.J. Rosenblatt and H.L. Lee, "Economic production cycles with imperfect production process", IIE Transactions, 18, pp. 48-55, 1986.
-
(1986)
IIE Transactions
, vol.18
, pp. 48-55
-
-
Rosenblatt, M.J.1
Lee, H.L.2
-
11
-
-
1642301525
-
Optimal lot-sizing problem with imperfect maintenance and imperfect production
-
S.H. Sheu and J.A. Chen, "Optimal lot-sizing problem with imperfect maintenance and imperfect production", International Journal of Systems Sciences, 35, pp. 69-77, 2004.
-
(2004)
International Journal of Systems Sciences
, vol.35
, pp. 69-77
-
-
Sheu, S.H.1
Chen, J.A.2
-
12
-
-
0032117210
-
Imperfect maintenance for deteriorating production systems
-
S.T. Tseng, R.H. Yeah and W.T. Ho, "Imperfect maintenance for deteriorating production systems", International Journal of Production Economics, 55, pp. 191-201, 1998.
-
(1998)
International Journal of Production Economics
, vol.55
, pp. 191-201
-
-
Tseng, S.T.1
Yeah, R.H.2
Ho, W.T.3
|