-
1
-
-
0037118559
-
A Survey of Maintenance Policies of Deteriorating Systems
-
Wang, H., 2002, "A Survey of Maintenance Policies of Deteriorating Systems," Eur. J. Oper. Res., 139, pp. 469-489.
-
(2002)
Eur. J. Oper. Res
, vol.139
, pp. 469-489
-
-
Wang, H.1
-
2
-
-
0001092349
-
Optimal Replacement Policies for a Two-Unit System With Failure Interactions
-
Nakagawa, T., and Murthy, D. N. P., 1993, "Optimal Replacement Policies for a Two-Unit System With Failure Interactions," RAIRO: Rech. Oper., 27(4), pp. 427-438.
-
(1993)
RAIRO: Rech. Oper
, vol.27
, Issue.4
, pp. 427-438
-
-
Nakagawa, T.1
Murthy, D.N.P.2
-
3
-
-
0030837303
-
A Generalized Group Maintenance Policy
-
Sheu, S.-H., and Jhang, J.-P., 1996, "A Generalized Group Maintenance Policy," Eur. J. Oper. Res., 96, pp. 232-247.
-
(1996)
Eur. J. Oper. Res
, vol.96
, pp. 232-247
-
-
Sheu, S.-H.1
Jhang, J.-P.2
-
4
-
-
0006445925
-
Optimal Group Maintenance of a System With Observable State Parameter
-
Dec, pp
-
Gertsbakh, I., 1984, "Optimal Group Maintenance of a System With Observable State Parameter," Adv. Appl. Probab., 16 (Dec), pp. 923-925.
-
(1984)
Adv. Appl. Probab
, vol.16
, pp. 923-925
-
-
Gertsbakh, I.1
-
5
-
-
0030285780
-
A Maintenance Model With Opportunities and Interrupt Replacement Options
-
Dagpunar, J. S., 1996, "A Maintenance Model With Opportunities and Interrupt Replacement Options," J. Oper. Res. Soc, 47(11), pp. 1406-1409.
-
(1996)
J. Oper. Res. Soc
, vol.47
, Issue.11
, pp. 1406-1409
-
-
Dagpunar, J.S.1
-
6
-
-
0001615257
-
Optimal (τ,T) Opportunistic Maintenance of a Ë-out-of-n: G System With Imperfect Pm and Partial Failure
-
Pham, H., and Wang, H., 2000, "Optimal (τ,T) Opportunistic Maintenance of a Ë-out-of-n: G System With Imperfect Pm and Partial Failure," Naval Res. Logistics Quart., 47, pp. 223-239.
-
(2000)
Naval Res. Logistics Quart
, vol.47
, pp. 223-239
-
-
Pham, H.1
Wang, H.2
-
7
-
-
0006471549
-
Optimal Preparedness Maintenance of Multi-Unit Systems With Imperfect Maintenance and Economic Dependence
-
Pham, H, Ed, World Scientific, Singapore, pp
-
Wang, H., Pham, H., and Izundu, A. E., 2001, "Optimal Preparedness Maintenance of Multi-Unit Systems With Imperfect Maintenance and Economic Dependence," Recent Advances in Reliability and Quality Engineering, Pham, H., Ed., World Scientific, Singapore, pp. 75-92.
-
(2001)
Recent Advances in Reliability and Quality Engineering
, pp. 75-92
-
-
Wang, H.1
Pham, H.2
Izundu, A.E.3
-
8
-
-
0026172219
-
A Maintenance Policy for Repairable Systems Based on Opportunistic Failure Rate Tolerance
-
Zheng, X., and Fard, N., 1991, "A Maintenance Policy for Repairable Systems Based on Opportunistic Failure Rate Tolerance," IEEE Trans. Reliab., 40, pp. 237-244.
-
(1991)
IEEE Trans. Reliab
, vol.40
, pp. 237-244
-
-
Zheng, X.1
Fard, N.2
-
9
-
-
34249899520
-
e-Manufacturing-Trends and Opportunities
-
Koc, M., Ni, J., Lee, J., and Bandyopadhyay, P., 2003, "e-Manufacturing-Trends and Opportunities," Int. J. Adv. Manuf. Technol., 6(1), pp. 29-46.
-
(2003)
Int. J. Adv. Manuf. Technol
, vol.6
, Issue.1
, pp. 29-46
-
-
Koc, M.1
Ni, J.2
Lee, J.3
Bandyopadhyay, P.4
-
10
-
-
0035546218
-
A Genetic Approach to the Scheduling of Preventive Maintenance Tasks on a Single Product Manufacturing Production Line
-
Cavory, G., Dupas, R., and Goncalves, G., 2001, "A Genetic Approach to the Scheduling of Preventive Maintenance Tasks on a Single Product Manufacturing Production Line," Int. J. Prod. Econ., 74, pp. 135-146.
-
(2001)
Int. J. Prod. Econ
, vol.74
, pp. 135-146
-
-
Cavory, G.1
Dupas, R.2
Goncalves, G.3
-
11
-
-
0035546054
-
An Integrated Production Planning and Scheduling System for Hybrid Flowshop Organizations
-
Riane, F., Artiba, A., et al., 2001, "An Integrated Production Planning and Scheduling System for Hybrid Flowshop Organizations," Int. J. Prod. Econ., 74, pp. 33-48.
-
(2001)
Int. J. Prod. Econ
, vol.74
, pp. 33-48
-
-
Riane, F.1
Artiba, A.2
-
12
-
-
34249883987
-
Maintenance Priority Assignment
-
Yang Z Qing, C., Djurdjanovic, D., Ni, J., and Lee, J., 2007, "Maintenance Priority Assignment," ASME J. Manuf. Sci. Eng., 129, pp. 435-446.
-
(2007)
ASME J. Manuf. Sci. Eng
, vol.129
, pp. 435-446
-
-
Yang, Z.1
Qing, C.2
Djurdjanovic, D.3
Ni, J.4
Lee, J.5
-
13
-
-
0003849209
-
-
2nd ed, Irwin/McGraw-Hill, New York, Chap. 7
-
Hopp, W. J., 1995, Factory Physics: Foundation of Manufacturing Management, 2nd ed., Irwin/McGraw-Hill, New York, Chap. 7.
-
(1995)
Factory Physics: Foundation of Manufacturing Management
-
-
Hopp, W.J.1
-
14
-
-
85129282408
-
-
Chang, Q., Ni, J., Bandyopadhyay, P., Biller, S.. and Xiao, G., 2007, Supervisory Factory Control Based on Real-Time Production Feedback. ASME J. Manuf. Sci. Eng., 129, pp. -.
-
Chang, Q., Ni, J., Bandyopadhyay, P., Biller, S.. and Xiao, G., 2007, "Supervisory Factory Control Based on Real-Time Production Feedback." ASME J. Manuf. Sci. Eng., 129, pp. -.
-
-
-
-
15
-
-
0029291550
-
A System-Theoretic Property ot Serial Production Lines-Improvability
-
Jacobs, D., and Meerkov, S. M., 1995, "A System-Theoretic Property ot Serial Production Lines-Improvability," Int. J. Syst. Sci., 26(4), pp. 755-785.
-
(1995)
Int. J. Syst. Sci
, vol.26
, Issue.4
, pp. 755-785
-
-
Jacobs, D.1
Meerkov, S.M.2
-
16
-
-
0004170276
-
-
Prentice-Hall. Englewood Cliffs, NJ, pp
-
Gershwin, S., 1994, Manufacturing Systems Engineering, Prentice-Hall. Englewood Cliffs, NJ, pp. 154-157.
-
(1994)
Manufacturing Systems Engineering
, pp. 154-157
-
-
Gershwin, S.1
|