-
1
-
-
0011717155
-
Operations research techniques in manufacturing planning and control systems
-
J. Olhager and B. Rapp, "Operations research techniques in manufacturing planning and control systems," Int. Trans. Oper. Res., vol. 2, pp. 29-43, 1995.
-
(1995)
Int. Trans. Oper. Res
, vol.2
, pp. 29-43
-
-
Olhager, J.1
Rapp, B.2
-
2
-
-
0023643533
-
Use of operations research in production management
-
F. N. Ford, D. A. Bradbard, W. N. Ledbetter, and J. F. Cox, "Use of operations research in production management," Prod. Inventory Manage., vol. 28, no. 3, pp. 59-62, 1987.
-
(1987)
Prod. Inventory Manage
, vol.28
, Issue.3
, pp. 59-62
-
-
Ford, F.N.1
Bradbard, D.A.2
Ledbetter, W.N.3
Cox, J.F.4
-
3
-
-
27144540137
-
A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
-
DOI 10.1016/j.ejor.2004.06.038, PII S0377221705001451
-
R. Ruiz and C. Maroto, "A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility," Eur. J. Oper. Res., vol. 169, no. 3, pp. 781-800, 2006. (Pubitemid 41492016)
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.3
, pp. 781-800
-
-
Ruiz, R.1
Maroto, C.2
-
4
-
-
0002499542
-
The lessons of flowshop scheduling research
-
R. A. Dudek, S. S. Panwalker, andM. L. Smith, "The lessons of flowshop scheduling research," Oper. Res., vol. 40, pp. 7-13, 1992.
-
(1992)
Oper. Res
, vol.40
, pp. 7-13
-
-
Dudek, R.A.1
Panwalker, S.S.2
Smith, M.L.3
-
5
-
-
0027146758
-
Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
-
B. L. MacCarthy and J. Liu, "Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling," Int. J. Prod. Res., vol. 31, no. 1, pp. 59-79, 1993. (Pubitemid 23619847)
-
(1993)
International Journal of Production Research
, vol.31
, Issue.1
, pp. 59-79
-
-
Maccarthy, B.L.1
Liu Jiyin2
-
6
-
-
0005528132
-
Practice-focused research issues for scheduling systems
-
K. Mckay, M. Pinedo, and S. Webster, "Practice-focused research issues for scheduling systems," Prod. Oper. Manage., vol. 11, no. 2, pp. 249-258, 2002.
-
(2002)
Prod. Oper. Manage
, vol.11
, Issue.2
, pp. 249-258
-
-
McKay, K.1
Pinedo, M.2
Webster, S.3
-
7
-
-
84952071818
-
Models and algorithms for a two-stage production process
-
H. D. Sherali, S. C. Sarin, andM. S. Kodialam, "Models and algorithms for a two-stage production process," Production Planning and Control, vol. 1, no. 1, pp. 27-39, 1990.
-
(1990)
Production Planning and Control
, vol.1
, Issue.1
, pp. 27-39
-
-
Sherali, H.D.1
Sarin, S.C.2
Kodialam, M.S.3
-
8
-
-
0026202405
-
Textile production systems. A succession of non-identical parallel processor shops
-
A. Guinet, "Textile production systems: A succession of non-identical parallel processor shops," J. Oper. Res. Soc., vol. 42, no. 8, pp. 655-671, 1991. (Pubitemid 21724746)
-
(1991)
Journal of the Operational Research Society
, vol.42
, Issue.8
, pp. 655-671
-
-
Guinet, A.1
-
9
-
-
0027634134
-
BPSS: A scheduling support system for the packaging industry
-
L. Adler, N. Fraiman, E. Kobacker, M. Pinedo, T. P. Plotnicoff, and T. P. Wu, "BPSS: A scheduling support system for the packaging industry," Oper. Res., vol. 41, no. 4, pp. 641-648, 1993.
-
(1993)
Oper. Res
, vol.41
, Issue.4
, pp. 641-648
-
-
Adler, L.1
Fraiman, N.2
Kobacker, E.3
Pinedo, M.4
Plotnicoff, T.P.5
Wu, T.P.6
-
10
-
-
0342497956
-
Hybrid flowshop problems, a decomposition based heuristic approach
-
FUCAM-INRIA,Marrakech
-
E. Aghezzaf, A. Artiba, O. Moursli, and C. Tahon, "Hybrid flowshop problems, a decomposition based heuristic approach," in Proc. Int. Conf. Ind. Eng. Prod.Manage., IEPM'95, FUCAM-INRIA,Marrakech, 1995, pp. 43-56.
-
(1995)
Proc. Int. Conf. Ind. Eng. Prod.Manage., IEPM'95
, pp. 43-56
-
-
Aghezzaf, E.1
Artiba, A.2
Moursli, O.3
Tahon, C.4
-
11
-
-
3342903540
-
A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation
-
S. Bertel and J. C. Billaut, "A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation," Eur. J. Oper. Res., vol. 159, no. 3, pp. 651-662, 2004.
-
(2004)
Eur. J. Oper. Res
, vol.159
, Issue.3
, pp. 651-662
-
-
Bertel, S.1
Billaut, J.C.2
-
12
-
-
13544254269
-
Group technology in a hybrid flowshop environment: A case study
-
DOI 10.1016/j.ejor.2004.03.026, PII S0377221704002887
-
C. Andres, J. M. Albarracin, G. Tormo, E. Vicens, and J. P. Garcia-Sabater, "Group technology in a hybrid flowshop environment: A case study," Eur. J. Oper. Res., vol. 167, no. 1, pp. 272-281, 2005. (Pubitemid 40220015)
-
(2005)
European Journal of Operational Research
, vol.167
, Issue.1
, pp. 272-281
-
-
Andres, C.1
Albarracin, J.M.2
Tormo, G.3
Vicens, E.4
Garcia-Sabater, J.P.5
-
13
-
-
34548625026
-
Modeling realistic hybrid flexible flowshop scheduling problems
-
DOI 10.1016/j.cor.2006.07.014, PII S0305054806001560
-
R. Ruiz, F. S. Serifoglu, and T. Urlings, "Modeling realistic hybrid flexible flowshop scheduling problems," Comput. Oper. Res., vol. 35, no. 4, pp. 1151-1175, 2008. (Pubitemid 47404765)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.4
, pp. 1151-1175
-
-
Ruiz, R.1
Serifoglu, F.S.2
Urlings, T.3
-
14
-
-
77955552521
-
Genetic algorithms with different representation schemes for complex hybrid flexible flow line problems
-
T. Urlings, R. Ruiz, and F. S. Serifoglu, "Genetic algorithms with different representation schemes for complex hybrid flexible flow line problems," Int. J. Metaheuristics, vol. 1, no. 1, pp. 30-54, 2010.
-
(2010)
Int. J. Metaheuristics
, vol.1
, Issue.1
, pp. 30-54
-
-
Urlings, T.1
Ruiz, R.2
Serifoglu, F.S.3
-
15
-
-
77955556348
-
Shifting representation search for hybrid flexible flowline problems
-
T. Urlings, R. Ruiz, and T. Stuzle, "Shifting representation search for hybrid flexible flowline problems," Eur. J. Oper. Res., vol. 207, no. 2, pp. 1086-1095, 2010.
-
(2010)
Eur. J. Oper. Res
, vol.207
, Issue.2
, pp. 1086-1095
-
-
Urlings, T.1
Ruiz, R.2
Stuzle, T.3
-
16
-
-
69749098025
-
Algorithms for a realistic variant of flowshop scheduling
-
B. Naderi, R. Ruiz, andM. Zandieh, "Algorithms for a realistic variant of flowshop scheduling," Comput. Oper. Res., vol. 37, no. 2, pp. 236-246, 2010.
-
(2010)
Comput. Oper. Res
, vol.37
, Issue.2
, pp. 236-246
-
-
Naderi, B.1
Ruiz, R.2
Zandieh, M.3
-
17
-
-
75849147656
-
The hybrid flow shop scheduling problem
-
R. Ruiz and J. A. Vazquez-Rodriguez, "The hybrid flow shop scheduling problem," Eur. J. Oper. Res., vol. 205, no. 1, pp. 1-18, 2010.
-
(2010)
Eur. J. Oper. Res
, vol.205
, Issue.1
, pp. 1-18
-
-
Ruiz, R.1
Vazquez-Rodriguez, J.A.2
-
18
-
-
73449099561
-
Review and classification of hybrid flow shop scheduling problems from a production systems and a solutions procedure perspective
-
I. Ribas, R. Leisten, and J. M. Framinan, "Review and classification of hybrid flow shop scheduling problems from a production systems and a solutions procedure perspective," Comput. Oper. Res., vol. 37, no. 8, pp. 1439-1454, 2010.
-
(2010)
Comput. Oper. Res
, vol.37
, Issue.8
, pp. 1439-1454
-
-
Ribas, I.1
Leisten, R.2
Framinan, J.M.3
-
19
-
-
0035899628
-
A review of planning and scheduling systems and methods for integrated steel production
-
DOI 10.1016/S0377-2217(00)00240-X, PII S037722170000240X
-
L. Tang, J. Liu, A. Rong, and Z. Yang, "A review of integrated planning & scheduling systems and methods for integrated steel production," Eur. J. Oper. Res., vol. 133, no. 1, pp. 1-20, 2001. (Pubitemid 32518297)
-
(2001)
European Journal of Operational Research
, vol.133
, Issue.1
, pp. 1-20
-
-
Tang, L.1
Liu, J.2
Rong, A.3
Yang, Z.4
-
20
-
-
0037050386
-
Steel-making process scheduling using Lagrangian relaxation
-
DOI 10.1080/00207540110073000
-
L. Tang, P. B. Lub, J. Liu, and L. Fang, "Steelmaking process scheduling using Lagrangian relaxation," Int. J. Prod. Res., vol. 40, no. 1, pp. 55-70, 2002. (Pubitemid 34593845)
-
(2002)
International Journal of Production Research
, vol.40
, Issue.1
, pp. 55-70
-
-
Tang, L.1
Luh, P.B.2
Liu, J.3
Fang, L.4
-
21
-
-
0000142257
-
Cooperative scheduling and its application to steelmaking processes
-
Apr
-
M. Numao and S. I. Morishita, "Cooperative scheduling and its application to steelmaking processes," IEEE Trans. Ind. Electron., vol. 38, no. 2, pp. 150-155, Apr. 1991.
-
(1991)
IEEE Trans. Ind. Electron
, vol.38
, Issue.2
, pp. 150-155
-
-
Numao, M.1
Morishita, S.I.2
-
22
-
-
0033892353
-
Mathematical programming model for scheduling steelmaking-continuous casting production
-
DOI 10.1016/S0377-2217(99)00041-7
-
L. Tang, J. Liu, A. Rong, and Z. Yang, "A mathematical programming model for scheduling steelmaking-continuous casting production scheduling," Eur. J. Oper. Res., vol. 120, no. 2, pp. 423-435, 2000. (Pubitemid 30542641)
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 423-435
-
-
Tang, L.1
Liu, J.2
Rong, A.3
Yang, Z.4
-
23
-
-
0034221374
-
The surplus inventory matching problem in the process industry
-
J. R. Kalagnanam, M. W. Dawande, M. Trumbo, and H. S. Lee, "The surplus inventory matching problem in the process industry," Oper. Res., vol. 48, no. 4, pp. 505-516, 2000.
-
(2000)
Oper. Res
, vol.48
, Issue.4
, pp. 505-516
-
-
Kalagnanam, J.R.1
Dawande, M.W.2
Trumbo, M.3
Lee, H.S.4
-
24
-
-
0001110087
-
Integration of continuous caster and hot strip mill planning for steel production
-
P. Cowling and W. Rezig, "Integration of continuous caster and hot strip mill planning for steel production," J. Scheduling, vol. 3, no. 4, pp. 185-208, 2000.
-
(2000)
J. Scheduling
, vol.3
, Issue.4
, pp. 185-208
-
-
Cowling, P.1
Rezig, W.2
-
25
-
-
0034211907
-
A lot grouping algorithm for a continuous slab caster in an integrated steel mill
-
DOI 10.1080/095372800232090
-
S. Y. Chang, M. R. Chang, and Y. Hong, "A lot grouping algorithm for a continuous slab caster in an integrated steel mill," Prod. Planning Control, vol. 11, no. 4, pp. 363-368, 2000. (Pubitemid 35394344)
-
(2000)
Production Planning and Control
, vol.11
, Issue.4
, pp. 363-368
-
-
Chang, S.Y.1
Chang, M.-R.2
Hong, Y.3
-
26
-
-
34248184498
-
A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex
-
DOI 10.1016/j.ejor.2006.09.090, PII S0377221706009830
-
L. Tang and G. Liu, "A mathematic programming model and solution for scheduling production orders in Shanghai Baoshan iron and steel complex," Eur. J. Oper. Res., vol. 182, no. 3, pp. 1453-1468, 2007. (Pubitemid 46719755)
-
(2007)
European Journal of Operational Research
, vol.182
, Issue.3
, pp. 1453-1468
-
-
Tang, L.1
Liu, G.2
-
27
-
-
33846601882
-
Scheduling a hybrid flowshop with batch production at the last stage
-
DOI 10.1016/j.cor.2005.10.014, PII S0305054805003370
-
H. Xuan and L. Tang, "Scheduling a hybrid flowshop with batch production at the last stage," Comput. Oper. Res., vol. 34, no. 9, pp. 2718-2733, 2007. (Pubitemid 46176402)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.9
, pp. 2718-2733
-
-
Xuan, H.1
Tang, L.2
-
28
-
-
70449590249
-
Ascheduling system for the steelmaking-continuous casting process: A case study from the steelmaking industry
-
H.Missbauer,W. Hauber, andW. Stadler, "Ascheduling system for the steelmaking-continuous casting process: A case study from the steelmaking industry," Int. J. Prod. Res., vol. 47, no. 15, pp. 4147-4172, 2009.
-
(2009)
Int. J. Prod. Res
, vol.47
, Issue.15
, pp. 4147-4172
-
-
Missbauer, H.1
Hauber, W.2
Stadler, W.3
-
29
-
-
58549106334
-
A novel hybrid algorithm for scheduling steel-making continuous casting production
-
A. Atighehchian,M. Bijari, and H. Tarkesh, "A novel hybrid algorithm for scheduling steel-making continuous casting production," Comput. Oper. Res., vol. 36, no. 8, pp. 2450-2461, 2009.
-
(2009)
Comput. Oper. Res
, vol.36
, Issue.8
, pp. 2450-2461
-
-
Atighehchian, A.1
Bijari, M.2
Tarkesh, H.3
-
30
-
-
84876107698
-
Scheduling of steel-making and continuous casting system using the surrogate subgradient algorithm for Lagrangian relaxation
-
Toronto, Ontario, Canada, Aug 21-24
-
L. Sun, T. Chai, and P. B. Luh, "Scheduling of steel-making and continuous casting system using the surrogate subgradient algorithm for Lagrangian relaxation," in Proc. 6th Annu. IEEE Conf. Autom. Sci. Eng., Toronto, Ontario, Canada, Aug. 21-24, 2010, pp. 885-890.
-
(2010)
Proc. 6th Annu. IEEE Conf. Autom. Sci. Eng.
, pp. 885-890
-
-
Sun, L.1
Chai, T.2
Luh, P.B.3
-
31
-
-
0037395532
-
Parallel machine earliness and tardiness scheduling with proportional weights
-
DOI 10.1016/S0305-0548(02)00055-2, PII S0305054802000552
-
H. Sun and G. Wang, "Parallel machine earliness and tardiness scheduling with proportional weights," Comput. Oper. Res., vol. 30, pp. 801-808, 2003. (Pubitemid 36175285)
-
(2003)
Computers and Operations Research
, vol.30
, Issue.5
, pp. 801-808
-
-
Sun, H.1
Wang, G.2
-
32
-
-
79957526144
-
A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops
-
M. F. Tasgetiren, Q. K. Pan, P. N. Suganthan, and A. H. L. Chen, "A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops," Inform. Sci., vol. 181, no. 16, pp. 3459-3475, 2011.
-
(2011)
Inform. Sci
, vol.181
, Issue.16
, pp. 3459-3475
-
-
Tasgetiren, M.F.1
Pan, Q.K.2
Suganthan, P.N.3
Chen, A.H.L.4
-
33
-
-
35148827874
-
An idea based on honey bee swarm for numerical optimization
-
Erciyes Univ., Kayseri, Turkey, Tech. Rep. TR06
-
D. Karaboga, "An idea based on honey bee swarm for numerical optimization," Comput. Eng. Dept., Erciyes Univ., Kayseri, Turkey, Tech. Rep. TR06, 2005.
-
(2005)
Comput. Eng. Dept.
-
-
Karaboga, D.1
-
34
-
-
64149103429
-
A new design method based on artificial bee colony algorithm for digital IIR filters
-
N. Karaboga, "A new design method based on artificial bee colony algorithm for digital IIR filters," J. Franklin Inst., vol. 346, no. 4, pp. 328-348, 2009.
-
(2009)
J. Franklin Inst
, vol.346
, Issue.4
, pp. 328-348
-
-
Karaboga, N.1
-
35
-
-
34548479029
-
On the performance of artificial bee colony (ABC) algorithm
-
DOI 10.1016/j.asoc.2007.05.007, PII S1568494607000531
-
D. Karaboga and B. Basturk, "On the performance of artificial bee colony (ABC) algorithm," Appl. Soft Compu., vol. 8, no. 1, pp. 687-697, 2008. (Pubitemid 47374599)
-
(2008)
Applied Soft Computing Journal
, vol.8
, Issue.1
, pp. 687-697
-
-
Karaboga, D.1
Basturk, B.2
-
36
-
-
67349273050
-
A comparative study of artificial bee colony algorithm
-
D. Karaboga and B. Akay, "A comparative study of artificial bee colony algorithm," Appl. Math. Comput., vol. 24, no. 1, pp. 108-132, 2009.
-
(2009)
Appl. Math. Comput
, vol.24
, Issue.1
, pp. 108-132
-
-
Karaboga, D.1
Akay, B.2
-
37
-
-
35148821762
-
A powerful and efficient algorithm for numerical function optimization: Artificial bee colony (ABC) algorithm
-
DOI 10.1007/s10898-007-9149-x
-
D. Karaboga and B. Basturk, "A powerful and efficient algorithm for numerical function optimization: Artificial bee colony (ABC) algorithm," J. Global Opt., vol. 39, no. 3, pp. 459-471, 2007. (Pubitemid 47551831)
-
(2007)
Journal of Global Optimization
, vol.39
, Issue.3
, pp. 459-471
-
-
Karaboga, D.1
Basturk, B.2
-
38
-
-
79953031480
-
A novel artificial bee colony algorithm for a lot-streaming flow shop scheduling problem
-
Q. K. Pan, P. N. Suganthan, M. F. Tasgetiren, and T. J. Chua, "A novel artificial bee colony algorithm for a lot-streaming flow shop scheduling problem," Inform. Sci., vol. 181, pp. 2455-2468, 2011.
-
(2011)
Inform. Sci
, vol.181
, pp. 2455-2468
-
-
Pan, Q.K.1
Suganthan, P.N.2
Tasgetiren, M.F.3
Chua, T.J.4
-
39
-
-
0026819776
-
A multi-stage parallel processor flowshop problem with minimum flowtime
-
C. Rahendran and D. Chaudhuri, "A multi-stage parallel processor flowshop problem with minimum flowtime," Eur. J. Oper. Res., vol. 57, no. 1, pp. 111-122, 1992.
-
(1992)
Eur. J. Oper. Res
, vol.57
, Issue.1
, pp. 111-122
-
-
Rahendran, C.1
Chaudhuri, D.2
-
40
-
-
0030170411
-
Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
-
A. G. P. Guinet and M. M. Solomon, "Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time," Int. J. Prod. Res., vol. 34, no. 6, pp. 1643-1654, 1996. (Pubitemid 126519773)
-
(1996)
International Journal of Production Research
, vol.34
, Issue.6
, pp. 1643-1654
-
-
Guinet, A.G.P.1
Solomon, M.M.2
-
41
-
-
28444469125
-
Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem
-
DOI 10.1016/j.ijpe.2004.12.025, PII S0925527305000228
-
Z. Jin, Z. Yang, and T. Tto, "Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem," Int. J. Prod. Econ., vol. 100, no. 2, pp. 322-334, 2006. (Pubitemid 41737529)
-
(2006)
International Journal of Production Economics
, vol.100
, Issue.2
, pp. 322-334
-
-
Jin, Z.1
Yang, Z.2
Ito, T.3
-
42
-
-
30044449841
-
Two new robust genetic algorithms for the flowshop scheduling problem
-
DOI 10.1016/j.omega.2004.12.006, PII S0305048305000174
-
R. Ruiz, C.Maroto, and J.Alcaraz, "Two new robust genetic algorithms for the flowshop scheduling problem," OMEGA-Int. J. Manage. Sci., vol. 34, no. 5, pp. 461-476, 2006. (Pubitemid 43046058)
-
(2006)
Omega
, vol.34
, Issue.5
, pp. 461-476
-
-
Ruiz, R.1
Maroto, C.2
Alcaraz, J.3
-
43
-
-
33847668343
-
A review of metrics on permutations for search landscape analysis
-
DOI 10.1016/j.cor.2005.11.022, PII S0305054805003746
-
T. Schiavinotto and T. Stutzle, "A review of metrics on permutations for search landscape analysis," Comput. Oper. Res., vol. 34, no. 10, pp. 3143-3153, 2007. (Pubitemid 46356742)
-
(2007)
Computers and Operations Research
, vol.34
, Issue.10
, pp. 3143-3153
-
-
Schiavinotto, T.1
Stutzle, T.2
-
44
-
-
0025700701
-
Some efficient heuristic methods for the flow shop sequencing problem
-
DOI 10.1016/0377-2217(90)90090-X
-
E. Taillard, "Some efficient heuristic methods for the flow shop sequencing problem," Eur. J. Oper. Res., vol. 47, no. 1, pp. 65-74, 1990. (Pubitemid 20733430)
-
(1990)
European Journal of Operational Research
, vol.47
, Issue.1
, pp. 65-74
-
-
Taillard, E.1
-
45
-
-
38249025037
-
-
I. H. Osman and C. N. Potts, Simulated Annealing for Permutation Flow-Shop Scheduling, vol. 17, no. 6, pp. 551-557, 1989.
-
(1989)
Simulated Annealing for Permutation Flow-Shop Scheduling
, vol.17
, Issue.6
, pp. 551-557
-
-
Osman, I.H.1
Potts, C.N.2
-
46
-
-
84876104474
-
Appling Iterated Local Search to the Permutation Flowshop Problem
-
Darmstdtd, Germany
-
T. Stuzle, Appling Iterated Local Search to the Permutation Flowshop Problem, Forchungbericht AIDA-98-04. Darmstdtd, Germany, 1998.
-
(1998)
Forchungbericht AIDA-98-04
-
-
Stuzle, T.1
-
49
-
-
64449085610
-
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
-
B. Naderi, M. Zandieh, A. K. G. Balagh, and V. Roshanaei, "An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness," Expert Syst. Appl., vol. 36, no. 6, pp. 9625-9633, 2009.
-
(2009)
Expert Syst. Appl
, vol.36
, Issue.6
, pp. 9625-9633
-
-
Naderi, B.1
Zandieh, M.2
Balagh, A.K.G.3
Roshanaei, V.4
-
50
-
-
62549158707
-
A hybrid genetic local search for the permutation flowshop scheduling problem
-
L. Y. Tseng and Y. T. Lin, "A hybrid genetic local search for the permutation flowshop scheduling problem," Eur. J. Oper. Res., vol. 198, no. 1, pp. 84-92, 2009.
-
(2009)
Eur. J. Oper. Res
, vol.198
, Issue.1
, pp. 84-92
-
-
Tseng, L.Y.1
Lin, Y.T.2
-
51
-
-
55749083412
-
An iterated local search algorithm for the permutation flowshop problem with total flowtime criterion
-
X. Dong, H. Huang, and P. Chen, "An iterated local search algorithm for the permutation flowshop problem with total flowtime criterion," Comput. Oper. Res., vol. 36, no. 5, pp. 1664-1669, 2009.
-
(2009)
Comput. Oper. Res
, vol.36
, Issue.5
, pp. 1664-1669
-
-
Dong, X.1
Huang, H.2
Chen, P.3
-
52
-
-
34249018250
-
A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling
-
DOI 10.1109/TSMCB.2006.887946
-
B. B. Li and L. Wang, "A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling," IEEE Trans. Syst., Man, Cybern.-Part B: Cybern., vol. 37, no. 3, pp. 576-591, 2007. (Pubitemid 46784593)
-
(2007)
IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics
, vol.37
, Issue.3
, pp. 576-591
-
-
Li, B.-B.1
Wang, L.2
-
53
-
-
84855375383
-
An effective meta-heuristic for no-wait job shops to minimize makespan
-
Jan.
-
J. Zhu and X. Li, "An effective meta-heuristic for no-wait job shops to minimize makespan," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 189-198, Jan. 2012.
-
(2012)
IEEE Trans. Autom. Sci. Eng
, vol.9
, Issue.1
, pp. 189-198
-
-
Zhu, J.1
Li, X.2
-
54
-
-
50649083283
-
Solving multiple-objective flexible job shop problems by evolution and local search
-
N. B. Ho and J. C. Tay, "Solving multiple-objective flexible job shop problems by evolution and local search," IEEE Trans. Syst., Man, Cybern.-Part C: Appl. Rev., vol. 38, no. 5, pp. 674-685, 2008.
-
(2008)
IEEE Trans. Syst., Man, Cybern.-Part C: Appl. Rev
, vol.38
, Issue.5
, pp. 674-685
-
-
Ho, N.B.1
Tay, J.C.2
-
55
-
-
38149013821
-
Constrained optimal hybrid control of a flow shop system
-
K. Gokbayrak and O. Selvi, "Constrained optimal hybrid control of a flow shop system," IEEE Trans. Autom. Control, vol. 52, no. 12, pp. 2270-2281, 2007.
-
(2007)
IEEE Trans. Autom. Control
, vol.52
, Issue.12
, pp. 2270-2281
-
-
Gokbayrak, K.1
Selvi, O.2
-
56
-
-
46849113696
-
Color-coating production scheduling for coils in inventory in steel industry
-
Jul
-
L. Tang, X. Wang, and J. Liu, "Color-coating production scheduling for coils in inventory in steel industry," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 3, pp. 544-549, Jul. 2008.
-
(2008)
IEEE Trans. Autom. Sci. Eng
, vol.5
, Issue.3
, pp. 544-549
-
-
Tang, L.1
Wang, X.2
Liu, J.3
-
57
-
-
80051903961
-
A scatter search algorithm for a multistage production scheduling problem with blocking and semi-continuous batching machine
-
L. Tang and X. Wang, "A scatter search algorithm for a multistage production scheduling problem with blocking and semi-continuous batching machine," IEEE Trans. Control Syst. Technol., vol. 19, no. 5, pp. 976-989, 2011.
-
(2011)
IEEE Trans. Control Syst. Technol
, vol.19
, Issue.5
, pp. 976-989
-
-
Tang, L.1
Wang, X.2
|