Volumn 10, Issue 2, 2013, Pages 307-322

An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process

Author keywords

Artificial bee colony (ABC); heuristic; hybrid flowshop; scheduling

Indexed keywords

ARTIFICIAL BEE COLONIES (ABC); ARTIFICIAL BEE COLONY ALGORITHMS; ARTIFICIAL BEE COLONY ALGORITHMS (ABC); COMPUTATIONAL COMPARISONS; HEURISTIC; HYBRID FLOW SHOP; HYBRID FLOW SHOP PROBLEM; HYBRID FLOW SHOP SCHEDULING;

EID: 84876099449     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2012.2204874     Document Type: Article
Times cited : (206)

References (57)
  • 1
    • 0011717155 scopus 로고
    • Operations research techniques in manufacturing planning and control systems
    • J. Olhager and B. Rapp, "Operations research techniques in manufacturing planning and control systems," Int. Trans. Oper. Res., vol. 2, pp. 29-43, 1995.
    • (1995) Int. Trans. Oper. Res , vol.2 , pp. 29-43
    • Olhager, J.1    Rapp, B.2
  • 3
    • 27144540137 scopus 로고    scopus 로고
    • A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility
    • DOI 10.1016/j.ejor.2004.06.038, PII S0377221705001451
    • R. Ruiz and C. Maroto, "A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility," Eur. J. Oper. Res., vol. 169, no. 3, pp. 781-800, 2006. (Pubitemid 41492016)
    • (2006) European Journal of Operational Research , vol.169 , Issue.3 , pp. 781-800
    • Ruiz, R.1    Maroto, C.2
  • 4
    • 0002499542 scopus 로고
    • The lessons of flowshop scheduling research
    • R. A. Dudek, S. S. Panwalker, andM. L. Smith, "The lessons of flowshop scheduling research," Oper. Res., vol. 40, pp. 7-13, 1992.
    • (1992) Oper. Res , vol.40 , pp. 7-13
    • Dudek, R.A.1    Panwalker, S.S.2    Smith, M.L.3
  • 5
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • B. L. MacCarthy and J. Liu, "Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling," Int. J. Prod. Res., vol. 31, no. 1, pp. 59-79, 1993. (Pubitemid 23619847)
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • Maccarthy, B.L.1    Liu Jiyin2
  • 6
    • 0005528132 scopus 로고    scopus 로고
    • Practice-focused research issues for scheduling systems
    • K. Mckay, M. Pinedo, and S. Webster, "Practice-focused research issues for scheduling systems," Prod. Oper. Manage., vol. 11, no. 2, pp. 249-258, 2002.
    • (2002) Prod. Oper. Manage , vol.11 , Issue.2 , pp. 249-258
    • McKay, K.1    Pinedo, M.2    Webster, S.3
  • 7
    • 84952071818 scopus 로고
    • Models and algorithms for a two-stage production process
    • H. D. Sherali, S. C. Sarin, andM. S. Kodialam, "Models and algorithms for a two-stage production process," Production Planning and Control, vol. 1, no. 1, pp. 27-39, 1990.
    • (1990) Production Planning and Control , vol.1 , Issue.1 , pp. 27-39
    • Sherali, H.D.1    Sarin, S.C.2    Kodialam, M.S.3
  • 8
    • 0026202405 scopus 로고
    • Textile production systems. A succession of non-identical parallel processor shops
    • A. Guinet, "Textile production systems: A succession of non-identical parallel processor shops," J. Oper. Res. Soc., vol. 42, no. 8, pp. 655-671, 1991. (Pubitemid 21724746)
    • (1991) Journal of the Operational Research Society , vol.42 , Issue.8 , pp. 655-671
    • Guinet, A.1
  • 9
    • 0027634134 scopus 로고
    • BPSS: A scheduling support system for the packaging industry
    • L. Adler, N. Fraiman, E. Kobacker, M. Pinedo, T. P. Plotnicoff, and T. P. Wu, "BPSS: A scheduling support system for the packaging industry," Oper. Res., vol. 41, no. 4, pp. 641-648, 1993.
    • (1993) Oper. Res , vol.41 , Issue.4 , pp. 641-648
    • Adler, L.1    Fraiman, N.2    Kobacker, E.3    Pinedo, M.4    Plotnicoff, T.P.5    Wu, T.P.6
  • 11
    • 3342903540 scopus 로고    scopus 로고
    • A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation
    • S. Bertel and J. C. Billaut, "A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation," Eur. J. Oper. Res., vol. 159, no. 3, pp. 651-662, 2004.
    • (2004) Eur. J. Oper. Res , vol.159 , Issue.3 , pp. 651-662
    • Bertel, S.1    Billaut, J.C.2
  • 13
    • 34548625026 scopus 로고    scopus 로고
    • Modeling realistic hybrid flexible flowshop scheduling problems
    • DOI 10.1016/j.cor.2006.07.014, PII S0305054806001560
    • R. Ruiz, F. S. Serifoglu, and T. Urlings, "Modeling realistic hybrid flexible flowshop scheduling problems," Comput. Oper. Res., vol. 35, no. 4, pp. 1151-1175, 2008. (Pubitemid 47404765)
    • (2008) Computers and Operations Research , vol.35 , Issue.4 , pp. 1151-1175
    • Ruiz, R.1    Serifoglu, F.S.2    Urlings, T.3
  • 14
    • 77955552521 scopus 로고    scopus 로고
    • Genetic algorithms with different representation schemes for complex hybrid flexible flow line problems
    • T. Urlings, R. Ruiz, and F. S. Serifoglu, "Genetic algorithms with different representation schemes for complex hybrid flexible flow line problems," Int. J. Metaheuristics, vol. 1, no. 1, pp. 30-54, 2010.
    • (2010) Int. J. Metaheuristics , vol.1 , Issue.1 , pp. 30-54
    • Urlings, T.1    Ruiz, R.2    Serifoglu, F.S.3
  • 15
    • 77955556348 scopus 로고    scopus 로고
    • Shifting representation search for hybrid flexible flowline problems
    • T. Urlings, R. Ruiz, and T. Stuzle, "Shifting representation search for hybrid flexible flowline problems," Eur. J. Oper. Res., vol. 207, no. 2, pp. 1086-1095, 2010.
    • (2010) Eur. J. Oper. Res , vol.207 , Issue.2 , pp. 1086-1095
    • Urlings, T.1    Ruiz, R.2    Stuzle, T.3
  • 16
    • 69749098025 scopus 로고    scopus 로고
    • Algorithms for a realistic variant of flowshop scheduling
    • B. Naderi, R. Ruiz, andM. Zandieh, "Algorithms for a realistic variant of flowshop scheduling," Comput. Oper. Res., vol. 37, no. 2, pp. 236-246, 2010.
    • (2010) Comput. Oper. Res , vol.37 , Issue.2 , pp. 236-246
    • Naderi, B.1    Ruiz, R.2    Zandieh, M.3
  • 17
    • 75849147656 scopus 로고    scopus 로고
    • The hybrid flow shop scheduling problem
    • R. Ruiz and J. A. Vazquez-Rodriguez, "The hybrid flow shop scheduling problem," Eur. J. Oper. Res., vol. 205, no. 1, pp. 1-18, 2010.
    • (2010) Eur. J. Oper. Res , vol.205 , Issue.1 , pp. 1-18
    • Ruiz, R.1    Vazquez-Rodriguez, J.A.2
  • 18
    • 73449099561 scopus 로고    scopus 로고
    • Review and classification of hybrid flow shop scheduling problems from a production systems and a solutions procedure perspective
    • I. Ribas, R. Leisten, and J. M. Framinan, "Review and classification of hybrid flow shop scheduling problems from a production systems and a solutions procedure perspective," Comput. Oper. Res., vol. 37, no. 8, pp. 1439-1454, 2010.
    • (2010) Comput. Oper. Res , vol.37 , Issue.8 , pp. 1439-1454
    • Ribas, I.1    Leisten, R.2    Framinan, J.M.3
  • 19
    • 0035899628 scopus 로고    scopus 로고
    • A review of planning and scheduling systems and methods for integrated steel production
    • DOI 10.1016/S0377-2217(00)00240-X, PII S037722170000240X
    • L. Tang, J. Liu, A. Rong, and Z. Yang, "A review of integrated planning & scheduling systems and methods for integrated steel production," Eur. J. Oper. Res., vol. 133, no. 1, pp. 1-20, 2001. (Pubitemid 32518297)
    • (2001) European Journal of Operational Research , vol.133 , Issue.1 , pp. 1-20
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 20
    • 0037050386 scopus 로고    scopus 로고
    • Steel-making process scheduling using Lagrangian relaxation
    • DOI 10.1080/00207540110073000
    • L. Tang, P. B. Lub, J. Liu, and L. Fang, "Steelmaking process scheduling using Lagrangian relaxation," Int. J. Prod. Res., vol. 40, no. 1, pp. 55-70, 2002. (Pubitemid 34593845)
    • (2002) International Journal of Production Research , vol.40 , Issue.1 , pp. 55-70
    • Tang, L.1    Luh, P.B.2    Liu, J.3    Fang, L.4
  • 21
    • 0000142257 scopus 로고
    • Cooperative scheduling and its application to steelmaking processes
    • Apr
    • M. Numao and S. I. Morishita, "Cooperative scheduling and its application to steelmaking processes," IEEE Trans. Ind. Electron., vol. 38, no. 2, pp. 150-155, Apr. 1991.
    • (1991) IEEE Trans. Ind. Electron , vol.38 , Issue.2 , pp. 150-155
    • Numao, M.1    Morishita, S.I.2
  • 22
    • 0033892353 scopus 로고    scopus 로고
    • Mathematical programming model for scheduling steelmaking-continuous casting production
    • DOI 10.1016/S0377-2217(99)00041-7
    • L. Tang, J. Liu, A. Rong, and Z. Yang, "A mathematical programming model for scheduling steelmaking-continuous casting production scheduling," Eur. J. Oper. Res., vol. 120, no. 2, pp. 423-435, 2000. (Pubitemid 30542641)
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 423-435
    • Tang, L.1    Liu, J.2    Rong, A.3    Yang, Z.4
  • 23
    • 0034221374 scopus 로고    scopus 로고
    • The surplus inventory matching problem in the process industry
    • J. R. Kalagnanam, M. W. Dawande, M. Trumbo, and H. S. Lee, "The surplus inventory matching problem in the process industry," Oper. Res., vol. 48, no. 4, pp. 505-516, 2000.
    • (2000) Oper. Res , vol.48 , Issue.4 , pp. 505-516
    • Kalagnanam, J.R.1    Dawande, M.W.2    Trumbo, M.3    Lee, H.S.4
  • 24
    • 0001110087 scopus 로고    scopus 로고
    • Integration of continuous caster and hot strip mill planning for steel production
    • P. Cowling and W. Rezig, "Integration of continuous caster and hot strip mill planning for steel production," J. Scheduling, vol. 3, no. 4, pp. 185-208, 2000.
    • (2000) J. Scheduling , vol.3 , Issue.4 , pp. 185-208
    • Cowling, P.1    Rezig, W.2
  • 25
    • 0034211907 scopus 로고    scopus 로고
    • A lot grouping algorithm for a continuous slab caster in an integrated steel mill
    • DOI 10.1080/095372800232090
    • S. Y. Chang, M. R. Chang, and Y. Hong, "A lot grouping algorithm for a continuous slab caster in an integrated steel mill," Prod. Planning Control, vol. 11, no. 4, pp. 363-368, 2000. (Pubitemid 35394344)
    • (2000) Production Planning and Control , vol.11 , Issue.4 , pp. 363-368
    • Chang, S.Y.1    Chang, M.-R.2    Hong, Y.3
  • 26
    • 34248184498 scopus 로고    scopus 로고
    • A mathematical programming model and solution for scheduling production orders in Shanghai Baoshan Iron and Steel Complex
    • DOI 10.1016/j.ejor.2006.09.090, PII S0377221706009830
    • L. Tang and G. Liu, "A mathematic programming model and solution for scheduling production orders in Shanghai Baoshan iron and steel complex," Eur. J. Oper. Res., vol. 182, no. 3, pp. 1453-1468, 2007. (Pubitemid 46719755)
    • (2007) European Journal of Operational Research , vol.182 , Issue.3 , pp. 1453-1468
    • Tang, L.1    Liu, G.2
  • 27
    • 33846601882 scopus 로고    scopus 로고
    • Scheduling a hybrid flowshop with batch production at the last stage
    • DOI 10.1016/j.cor.2005.10.014, PII S0305054805003370
    • H. Xuan and L. Tang, "Scheduling a hybrid flowshop with batch production at the last stage," Comput. Oper. Res., vol. 34, no. 9, pp. 2718-2733, 2007. (Pubitemid 46176402)
    • (2007) Computers and Operations Research , vol.34 , Issue.9 , pp. 2718-2733
    • Xuan, H.1    Tang, L.2
  • 28
    • 70449590249 scopus 로고    scopus 로고
    • Ascheduling system for the steelmaking-continuous casting process: A case study from the steelmaking industry
    • H.Missbauer,W. Hauber, andW. Stadler, "Ascheduling system for the steelmaking-continuous casting process: A case study from the steelmaking industry," Int. J. Prod. Res., vol. 47, no. 15, pp. 4147-4172, 2009.
    • (2009) Int. J. Prod. Res , vol.47 , Issue.15 , pp. 4147-4172
    • Missbauer, H.1    Hauber, W.2    Stadler, W.3
  • 29
    • 58549106334 scopus 로고    scopus 로고
    • A novel hybrid algorithm for scheduling steel-making continuous casting production
    • A. Atighehchian,M. Bijari, and H. Tarkesh, "A novel hybrid algorithm for scheduling steel-making continuous casting production," Comput. Oper. Res., vol. 36, no. 8, pp. 2450-2461, 2009.
    • (2009) Comput. Oper. Res , vol.36 , Issue.8 , pp. 2450-2461
    • Atighehchian, A.1    Bijari, M.2    Tarkesh, H.3
  • 30
    • 84876107698 scopus 로고    scopus 로고
    • Scheduling of steel-making and continuous casting system using the surrogate subgradient algorithm for Lagrangian relaxation
    • Toronto, Ontario, Canada, Aug 21-24
    • L. Sun, T. Chai, and P. B. Luh, "Scheduling of steel-making and continuous casting system using the surrogate subgradient algorithm for Lagrangian relaxation," in Proc. 6th Annu. IEEE Conf. Autom. Sci. Eng., Toronto, Ontario, Canada, Aug. 21-24, 2010, pp. 885-890.
    • (2010) Proc. 6th Annu. IEEE Conf. Autom. Sci. Eng. , pp. 885-890
    • Sun, L.1    Chai, T.2    Luh, P.B.3
  • 31
    • 0037395532 scopus 로고    scopus 로고
    • Parallel machine earliness and tardiness scheduling with proportional weights
    • DOI 10.1016/S0305-0548(02)00055-2, PII S0305054802000552
    • H. Sun and G. Wang, "Parallel machine earliness and tardiness scheduling with proportional weights," Comput. Oper. Res., vol. 30, pp. 801-808, 2003. (Pubitemid 36175285)
    • (2003) Computers and Operations Research , vol.30 , Issue.5 , pp. 801-808
    • Sun, H.1    Wang, G.2
  • 32
    • 79957526144 scopus 로고    scopus 로고
    • A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops
    • M. F. Tasgetiren, Q. K. Pan, P. N. Suganthan, and A. H. L. Chen, "A discrete artificial bee colony algorithm for the total flowtime minimization in permutation flow shops," Inform. Sci., vol. 181, no. 16, pp. 3459-3475, 2011.
    • (2011) Inform. Sci , vol.181 , Issue.16 , pp. 3459-3475
    • Tasgetiren, M.F.1    Pan, Q.K.2    Suganthan, P.N.3    Chen, A.H.L.4
  • 33
    • 35148827874 scopus 로고    scopus 로고
    • An idea based on honey bee swarm for numerical optimization
    • Erciyes Univ., Kayseri, Turkey, Tech. Rep. TR06
    • D. Karaboga, "An idea based on honey bee swarm for numerical optimization," Comput. Eng. Dept., Erciyes Univ., Kayseri, Turkey, Tech. Rep. TR06, 2005.
    • (2005) Comput. Eng. Dept.
    • Karaboga, D.1
  • 34
    • 64149103429 scopus 로고    scopus 로고
    • A new design method based on artificial bee colony algorithm for digital IIR filters
    • N. Karaboga, "A new design method based on artificial bee colony algorithm for digital IIR filters," J. Franklin Inst., vol. 346, no. 4, pp. 328-348, 2009.
    • (2009) J. Franklin Inst , vol.346 , Issue.4 , pp. 328-348
    • Karaboga, N.1
  • 35
    • 34548479029 scopus 로고    scopus 로고
    • On the performance of artificial bee colony (ABC) algorithm
    • DOI 10.1016/j.asoc.2007.05.007, PII S1568494607000531
    • D. Karaboga and B. Basturk, "On the performance of artificial bee colony (ABC) algorithm," Appl. Soft Compu., vol. 8, no. 1, pp. 687-697, 2008. (Pubitemid 47374599)
    • (2008) Applied Soft Computing Journal , vol.8 , Issue.1 , pp. 687-697
    • Karaboga, D.1    Basturk, B.2
  • 36
    • 67349273050 scopus 로고    scopus 로고
    • A comparative study of artificial bee colony algorithm
    • D. Karaboga and B. Akay, "A comparative study of artificial bee colony algorithm," Appl. Math. Comput., vol. 24, no. 1, pp. 108-132, 2009.
    • (2009) Appl. Math. Comput , vol.24 , Issue.1 , pp. 108-132
    • Karaboga, D.1    Akay, B.2
  • 37
    • 35148821762 scopus 로고    scopus 로고
    • A powerful and efficient algorithm for numerical function optimization: Artificial bee colony (ABC) algorithm
    • DOI 10.1007/s10898-007-9149-x
    • D. Karaboga and B. Basturk, "A powerful and efficient algorithm for numerical function optimization: Artificial bee colony (ABC) algorithm," J. Global Opt., vol. 39, no. 3, pp. 459-471, 2007. (Pubitemid 47551831)
    • (2007) Journal of Global Optimization , vol.39 , Issue.3 , pp. 459-471
    • Karaboga, D.1    Basturk, B.2
  • 38
    • 79953031480 scopus 로고    scopus 로고
    • A novel artificial bee colony algorithm for a lot-streaming flow shop scheduling problem
    • Q. K. Pan, P. N. Suganthan, M. F. Tasgetiren, and T. J. Chua, "A novel artificial bee colony algorithm for a lot-streaming flow shop scheduling problem," Inform. Sci., vol. 181, pp. 2455-2468, 2011.
    • (2011) Inform. Sci , vol.181 , pp. 2455-2468
    • Pan, Q.K.1    Suganthan, P.N.2    Tasgetiren, M.F.3    Chua, T.J.4
  • 39
    • 0026819776 scopus 로고
    • A multi-stage parallel processor flowshop problem with minimum flowtime
    • C. Rahendran and D. Chaudhuri, "A multi-stage parallel processor flowshop problem with minimum flowtime," Eur. J. Oper. Res., vol. 57, no. 1, pp. 111-122, 1992.
    • (1992) Eur. J. Oper. Res , vol.57 , Issue.1 , pp. 111-122
    • Rahendran, C.1    Chaudhuri, D.2
  • 40
    • 0030170411 scopus 로고    scopus 로고
    • Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time
    • A. G. P. Guinet and M. M. Solomon, "Scheduling hybrid flowshops to minimize maximum tardiness or maximum completion time," Int. J. Prod. Res., vol. 34, no. 6, pp. 1643-1654, 1996. (Pubitemid 126519773)
    • (1996) International Journal of Production Research , vol.34 , Issue.6 , pp. 1643-1654
    • Guinet, A.G.P.1    Solomon, M.M.2
  • 41
    • 28444469125 scopus 로고    scopus 로고
    • Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem
    • DOI 10.1016/j.ijpe.2004.12.025, PII S0925527305000228
    • Z. Jin, Z. Yang, and T. Tto, "Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem," Int. J. Prod. Econ., vol. 100, no. 2, pp. 322-334, 2006. (Pubitemid 41737529)
    • (2006) International Journal of Production Economics , vol.100 , Issue.2 , pp. 322-334
    • Jin, Z.1    Yang, Z.2    Ito, T.3
  • 42
    • 30044449841 scopus 로고    scopus 로고
    • Two new robust genetic algorithms for the flowshop scheduling problem
    • DOI 10.1016/j.omega.2004.12.006, PII S0305048305000174
    • R. Ruiz, C.Maroto, and J.Alcaraz, "Two new robust genetic algorithms for the flowshop scheduling problem," OMEGA-Int. J. Manage. Sci., vol. 34, no. 5, pp. 461-476, 2006. (Pubitemid 43046058)
    • (2006) Omega , vol.34 , Issue.5 , pp. 461-476
    • Ruiz, R.1    Maroto, C.2    Alcaraz, J.3
  • 43
    • 33847668343 scopus 로고    scopus 로고
    • A review of metrics on permutations for search landscape analysis
    • DOI 10.1016/j.cor.2005.11.022, PII S0305054805003746
    • T. Schiavinotto and T. Stutzle, "A review of metrics on permutations for search landscape analysis," Comput. Oper. Res., vol. 34, no. 10, pp. 3143-3153, 2007. (Pubitemid 46356742)
    • (2007) Computers and Operations Research , vol.34 , Issue.10 , pp. 3143-3153
    • Schiavinotto, T.1    Stutzle, T.2
  • 44
    • 0025700701 scopus 로고
    • Some efficient heuristic methods for the flow shop sequencing problem
    • DOI 10.1016/0377-2217(90)90090-X
    • E. Taillard, "Some efficient heuristic methods for the flow shop sequencing problem," Eur. J. Oper. Res., vol. 47, no. 1, pp. 65-74, 1990. (Pubitemid 20733430)
    • (1990) European Journal of Operational Research , vol.47 , Issue.1 , pp. 65-74
    • Taillard, E.1
  • 46
    • 84876104474 scopus 로고    scopus 로고
    • Appling Iterated Local Search to the Permutation Flowshop Problem
    • Darmstdtd, Germany
    • T. Stuzle, Appling Iterated Local Search to the Permutation Flowshop Problem, Forchungbericht AIDA-98-04. Darmstdtd, Germany, 1998.
    • (1998) Forchungbericht AIDA-98-04
    • Stuzle, T.1
  • 49
    • 64449085610 scopus 로고    scopus 로고
    • An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness
    • B. Naderi, M. Zandieh, A. K. G. Balagh, and V. Roshanaei, "An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness," Expert Syst. Appl., vol. 36, no. 6, pp. 9625-9633, 2009.
    • (2009) Expert Syst. Appl , vol.36 , Issue.6 , pp. 9625-9633
    • Naderi, B.1    Zandieh, M.2    Balagh, A.K.G.3    Roshanaei, V.4
  • 50
    • 62549158707 scopus 로고    scopus 로고
    • A hybrid genetic local search for the permutation flowshop scheduling problem
    • L. Y. Tseng and Y. T. Lin, "A hybrid genetic local search for the permutation flowshop scheduling problem," Eur. J. Oper. Res., vol. 198, no. 1, pp. 84-92, 2009.
    • (2009) Eur. J. Oper. Res , vol.198 , Issue.1 , pp. 84-92
    • Tseng, L.Y.1    Lin, Y.T.2
  • 51
    • 55749083412 scopus 로고    scopus 로고
    • An iterated local search algorithm for the permutation flowshop problem with total flowtime criterion
    • X. Dong, H. Huang, and P. Chen, "An iterated local search algorithm for the permutation flowshop problem with total flowtime criterion," Comput. Oper. Res., vol. 36, no. 5, pp. 1664-1669, 2009.
    • (2009) Comput. Oper. Res , vol.36 , Issue.5 , pp. 1664-1669
    • Dong, X.1    Huang, H.2    Chen, P.3
  • 52
    • 34249018250 scopus 로고    scopus 로고
    • A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling
    • DOI 10.1109/TSMCB.2006.887946
    • B. B. Li and L. Wang, "A hybrid quantum-inspired genetic algorithm for multiobjective flow shop scheduling," IEEE Trans. Syst., Man, Cybern.-Part B: Cybern., vol. 37, no. 3, pp. 576-591, 2007. (Pubitemid 46784593)
    • (2007) IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics , vol.37 , Issue.3 , pp. 576-591
    • Li, B.-B.1    Wang, L.2
  • 53
    • 84855375383 scopus 로고    scopus 로고
    • An effective meta-heuristic for no-wait job shops to minimize makespan
    • Jan.
    • J. Zhu and X. Li, "An effective meta-heuristic for no-wait job shops to minimize makespan," IEEE Trans. Autom. Sci. Eng., vol. 9, no. 1, pp. 189-198, Jan. 2012.
    • (2012) IEEE Trans. Autom. Sci. Eng , vol.9 , Issue.1 , pp. 189-198
    • Zhu, J.1    Li, X.2
  • 54
    • 50649083283 scopus 로고    scopus 로고
    • Solving multiple-objective flexible job shop problems by evolution and local search
    • N. B. Ho and J. C. Tay, "Solving multiple-objective flexible job shop problems by evolution and local search," IEEE Trans. Syst., Man, Cybern.-Part C: Appl. Rev., vol. 38, no. 5, pp. 674-685, 2008.
    • (2008) IEEE Trans. Syst., Man, Cybern.-Part C: Appl. Rev , vol.38 , Issue.5 , pp. 674-685
    • Ho, N.B.1    Tay, J.C.2
  • 55
    • 38149013821 scopus 로고    scopus 로고
    • Constrained optimal hybrid control of a flow shop system
    • K. Gokbayrak and O. Selvi, "Constrained optimal hybrid control of a flow shop system," IEEE Trans. Autom. Control, vol. 52, no. 12, pp. 2270-2281, 2007.
    • (2007) IEEE Trans. Autom. Control , vol.52 , Issue.12 , pp. 2270-2281
    • Gokbayrak, K.1    Selvi, O.2
  • 56
    • 46849113696 scopus 로고    scopus 로고
    • Color-coating production scheduling for coils in inventory in steel industry
    • Jul
    • L. Tang, X. Wang, and J. Liu, "Color-coating production scheduling for coils in inventory in steel industry," IEEE Trans. Autom. Sci. Eng., vol. 5, no. 3, pp. 544-549, Jul. 2008.
    • (2008) IEEE Trans. Autom. Sci. Eng , vol.5 , Issue.3 , pp. 544-549
    • Tang, L.1    Wang, X.2    Liu, J.3
  • 57
    • 80051903961 scopus 로고    scopus 로고
    • A scatter search algorithm for a multistage production scheduling problem with blocking and semi-continuous batching machine
    • L. Tang and X. Wang, "A scatter search algorithm for a multistage production scheduling problem with blocking and semi-continuous batching machine," IEEE Trans. Control Syst. Technol., vol. 19, no. 5, pp. 976-989, 2011.
    • (2011) IEEE Trans. Control Syst. Technol , vol.19 , Issue.5 , pp. 976-989
    • Tang, L.1    Wang, X.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.