-
2
-
-
0030086817
-
Expert systems in the steel industry
-
Dorn J. Expert systems in the steel industry. IEEE Expert 1996; 11(1):18-21.
-
(1996)
IEEE Expert
, vol.11
, Issue.1
, pp. 18-21
-
-
Dorn, J.1
-
3
-
-
0029290723
-
Status of real time closed loop optimisation in 1995
-
April
-
Haspel DW. Status of real time closed loop optimisation in 1995. Steel Times, April 1995.
-
(1995)
Steel Times
-
-
Haspel, D.W.1
-
5
-
-
0043271409
-
Optimization in steel hot rolling
-
Wiley: Anna Sciomachen
-
Cowling P. Optimization in steel hot rolling. Optimization in Industry (3 edn.). Wiley: Anna Sciomachen, 1995.
-
(1995)
Optimization in Industry (3 Edn.)
-
-
Cowling, P.1
-
6
-
-
84955068698
-
-
A.I. Systems, J. Wybran Ave., B-1070 Brussels, Belgium
-
A. I. Systems. BetaPlanner product specification. A.I. Systems, J. Wybran Ave., B-1070 Brussels, Belgium, 1995.
-
(1995)
BetaPlanner Product Specification
-
-
-
7
-
-
84955068698
-
-
A.I. Systems, J. Wybran Ave., B-1070 Brussels, Belgium
-
A. I. Systems. AlphaPlanner product specification. A.I. Systems, J. Wybran Ave., B-1070 Brussels, Belgium, 1997.
-
(1997)
AlphaPlanner Product Specification
-
-
-
9
-
-
0030102183
-
Primary production scheduling at steel making industries
-
Lee US, Murthy SS, Haider SW, Morse DV. Primary production scheduling at steel making industries. IBM Journal of Research and Development 1996; 40(2):231-252.
-
(1996)
IBM Journal of Research and Development
, vol.40
, Issue.2
, pp. 231-252
-
-
Lee, U.S.1
Murthy, S.S.2
Haider, S.W.3
Morse, D.V.4
-
10
-
-
0000142257
-
Co-operative scheduling and its application to steel making processes
-
Numao M, Morishita S. Co-operative scheduling and its application to steel making processes. IEEE Transactions on Industrial Electronics 1991; 38(2):150-155.
-
(1991)
IEEE Transactions on Industrial Electronics
, vol.38
, Issue.2
, pp. 150-155
-
-
Numao, M.1
Morishita, S.2
-
11
-
-
0011586319
-
Development of a co-operative scheduling system for a steel-making process
-
Morgan-Kaufmann: Los Altos, CA
-
Numao M. Development of a co-operative scheduling system for a steel-making process. In Intelligent Scheduling, Morgan-Kaufmann: Los Altos, CA, 1994; 607-628.
-
(1994)
Intelligent Scheduling
, pp. 607-628
-
-
Numao, M.1
-
12
-
-
0041977737
-
A flowshop with compatibility constraints in a steel making plant
-
Morgan-Kaufmann: Los Altos, CA
-
Dorn J, Slany W. A flowshop with compatibility constraints in a steel making plant. In Intelligent Scheduling, Morgan-Kaufmann: Los Altos, CA, 1994; 629-654.
-
(1994)
Intelligent Scheduling
, pp. 629-654
-
-
Dorn, J.1
Slany, W.2
-
13
-
-
0030108090
-
Scheduling as a fuzzy multiple criteria optimization problem
-
Slany W. Scheduling as a fuzzy multiple criteria optimization problem. Fuzzy Sets and Systems 1996; 78:197-222.
-
(1996)
Fuzzy Sets and Systems
, vol.78
, pp. 197-222
-
-
Slany, W.1
-
14
-
-
0030085003
-
Scheduling high-grade steel making
-
Dorn J, Shams. Scheduling high-grade steel making. IEEE Expert 1996; 11(1):28-35.
-
(1996)
IEEE Expert
, vol.11
, Issue.1
, pp. 28-35
-
-
Dorn, J.1
Shams2
-
15
-
-
0003212293
-
A model for sequencing a continuous casting operation to minimize costs
-
October
-
Lally B, Biegler L, Henein H. A model for sequencing a continuous casting operation to minimize costs. Iron and Steelmaker, October 1987.
-
(1987)
Iron and Steelmaker
-
-
Lally, B.1
Biegler, L.2
Henein, H.3
-
16
-
-
0242633667
-
Continuous caster planning using advanced search algorithms
-
January
-
Vaessen N, Van Nerom L. Continuous caster planning using advanced search algorithms. Steel Times, January 1994.
-
(1994)
Steel Times
-
-
Vaessen, N.1
Van Nerom, L.2
-
17
-
-
0003259634
-
A caster sequencing optimisation program for Geneva Steel's facility modernization project
-
September
-
Tong X, Silverman J, Clausen S. A caster sequencing optimisation program for Geneva Steel's facility modernization project. Presented at 1994 Annual AISE Convention, September 1994.
-
(1994)
1994 Annual AISE Convention
-
-
Tong, X.1
Silverman, J.2
Clausen, S.3
|