-
1
-
-
3042771395
-
The slab design problem in the steel industry
-
M. Dawande, J. Kalagnanam, H. S. Lee, C. Reddy, S. Siegel, and M. Trumbo, "The slab design problem in the steel industry," Interfaces, vol. 34, no. 3, pp. 215-225, 2004.
-
(2004)
Interfaces
, vol.34
, Issue.3
, pp. 215-225
-
-
Dawande, M.1
Kalagnanam, J.2
Lee, H.S.3
Reddy, C.4
Siegel, S.5
Trumbo, M.6
-
2
-
-
0025597496
-
Hybrid hierarchical scheduling and control systems in manufacturing
-
Dec.
-
B. Bona, P. Brandimarte, C. Greco, and G. Menga, "Hybrid hierarchical scheduling and control systems in manufacturing," IEEE Trans. Robot. Autom., vol. 6, no. 6, pp. 673-686, Dec. 1990.
-
(1990)
IEEE Trans. Robot. Autom.
, vol.6
, Issue.6
, pp. 673-686
-
-
Bona, B.1
Brandimarte, P.2
Greco, C.3
Menga, G.4
-
3
-
-
0024079275
-
Decision models for aiding FMS scheduling and control
-
Sep./Oct.
-
J. C. Ammons, T. Govindaraj, and C. M. Mitchell, "Decision models for aiding FMS scheduling and control," IEEE Trans. Syst., Man, Cybern., vol. 18, no. 5, pp. 744-756, Sep./Oct. 1988.
-
(1988)
IEEE Trans. Syst., Man, Cybern.
, vol.18
, Issue.5
, pp. 744-756
-
-
Ammons, J.C.1
Govindaraj, T.2
Mitchell, C.M.3
-
4
-
-
37149016932
-
A predictive reactive scheduling method for color-coating production in steel industry
-
L. X. Tang and X. P. Wang, "A predictive reactive scheduling method for color-coating production in steel industry," Int. J. Adv. Manuf. Technol., vol. 35, no. 7-8, pp. 633-645, 2008.
-
(2008)
Int. J. Adv. Manuf. Technol.
, vol.35
, Issue.7-8
, pp. 633-645
-
-
Tang, L.X.1
Wang, X.P.2
-
5
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
N. G. Hall and C. Sriskandarajah, "A survey of machine scheduling problems with blocking and no-wait in process," Oper. Res., vol. 44, no. 3, pp. 510-525, 1996. (Pubitemid 126669516)
-
(1996)
Operations Research
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.G.1
Sriskandarajah, C.2
-
6
-
-
0026880377
-
Discrete event sequencing as a traveling salesman problem
-
E. D. Kosiba, J. R. Wright, and A. E. Cobbs, "Discrete event sequencing as a traveling salesman problem," Comput. Ind., vol. 19, no. 3, pp. 317-327, 1992.
-
(1992)
Comput. Ind.
, vol.19
, Issue.3
, pp. 317-327
-
-
Kosiba, E.D.1
Wright, J.R.2
Cobbs, A.E.3
-
7
-
-
0032049311
-
The hot strip mill production scheduling problem: A tabu search approach
-
PII S0377221797002774
-
L. Lopez, M. W. Carter, and M. Gendreau, "The hot strip mill production scheduling problem: A tabu search approach," Euro. J. Operat. Res., vol. 106, no. 2-3, pp. 317-335, 1998. (Pubitemid 128399655)
-
(1998)
European Journal of Operational Research
, vol.106
, Issue.2-3
, pp. 317-335
-
-
Lopez, L.1
Carter, M.W.2
Gendreau, M.3
-
8
-
-
0033741404
-
Multiple traveling salesman problem model for hot scheduling in Shanghai Baoshan Iron & Steel Complex
-
L. X. Tang, J. Y. Liu, A. Y. Rong, and Z. H. Yang, "Multiple traveling salesman problem model for hot scheduling in Shanghai Baoshan Iron & Steel Complex," Euro. J. Oper. Res., vol. 124, no. 2, pp. 267-282, 2000.
-
(2000)
Euro. J. Oper. Res.
, vol.124
, Issue.2
, pp. 267-282
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
-
9
-
-
0038789162
-
A flexible decision support system for steel hot rolling mill scheduling
-
P. Cowling, "A flexible decision support system for steel hot rolling mill scheduling," Comput. Ind. Eng., vol. 45, no. 2, pp. 307-321, 2003.
-
(2003)
Comput. Ind. Eng.
, vol.45
, Issue.2
, pp. 307-321
-
-
Cowling, P.1
-
10
-
-
43449091631
-
Integration of batching and scheduling for hot rolling production in the steel industry
-
X. P. Wang and L. X. Tang, "Integration of batching and scheduling for hot rolling production in the steel industry," Int. J. Adv. Manuf. Technol., vol. 36, no. 5-6, pp. 431-441, 2008.
-
(2008)
Int. J. Adv. Manuf. Technol.
, vol.36
, Issue.5-6
, pp. 431-441
-
-
Wang, X.P.1
Tang, L.X.2
-
11
-
-
73249137793
-
Cut scheduling optimization in plate mill finishing area through mixed-integer linear programming
-
Jan.
-
C. Aurora, D. Cettolo, and F. A. Cuzzola, "Cut scheduling optimization in plate mill finishing area through mixed-integer linear programming," IEEE Trans. Control Syst. Technol., vol. 18, no. 1, pp. 118-127, Jan. 2010.
-
(2010)
IEEE Trans. Control Syst. Technol.
, vol.18
, Issue.1
, pp. 118-127
-
-
Aurora, C.1
Cettolo, D.2
Cuzzola, F.A.3
-
12
-
-
73249132545
-
A two phase heuristic for the production scheduling of heavy plates in steel industry
-
Jan.
-
L. X. Tang and X. P. Wang, "A two phase heuristic for the production scheduling of heavy plates in steel industry," IEEE Trans. Control Syst. Technol., vol. 18, no. 1, pp. 104-117, Jan. 2010.
-
(2010)
IEEE Trans. Control Syst. Technol.
, vol.18
, Issue.1
, pp. 104-117
-
-
Tang, L.X.1
Wang, X.P.2
-
13
-
-
0026898494
-
Efficient algorithms for scheduling semiconductor burn-in operations
-
C. Y. Lee, R. Uzsoy, and L. A. Martin-Vega, "Efficient algorithms for scheduling semiconductor burn-in operations," Oper. Res., vol. 40, no. 4, pp. 764-775, 1992. (Pubitemid 23581869)
-
(1992)
Operations Research
, vol.40
, Issue.4
, pp. 764-775
-
-
Lee Chung-Yee1
Uzsoy Reha2
Martin-Vega Louis, A.3
-
14
-
-
0036643150
-
Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals
-
DOI 10.1016/S0305-0548(00)00098-8, PII S0305054800000988
-
C. S. Sung, Y. I. Choung, J. M. Hong, and Y. H. Kim, "Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals," Comput. Oper. Res., vol. 29, no. 8, pp. 995-1007, 2002. (Pubitemid 34196076)
-
(2002)
Computers and Operations Research
, vol.29
, Issue.8
, pp. 995-1007
-
-
Sung, C.S.1
Choung, Y.I.2
Hong, J.M.3
Kim, Y.H.4
-
15
-
-
0036778940
-
A genetic algorithm to minimize maximum lateness on a batch processing machine
-
DOI 10.1016/S0305-0548(01)00031-4, PII S0305054801000314
-
C. S.Wang and R. Uzsoy, "A genetic algorithm to minimize maximum lateness on a batch processing machine," Comput. Oper. Res., vol. 29, no. 12, pp. 1621-1640, 2002. (Pubitemid 34589742)
-
(2002)
Computers and Operations Research
, vol.29
, Issue.12
, pp. 1621-1640
-
-
Wang, C.-S.1
Uzsoy, R.2
-
16
-
-
40649116895
-
Scheduling a single semi-continuous batching machine
-
L. X. Tang and Y. F. Zhao, "Scheduling a single semi-continuous batching machine," Omega, vol. 36, no. 6, pp. 992-1004, 2008.
-
(2008)
Omega
, vol.36
, Issue.6
, pp. 992-1004
-
-
Tang, L.X.1
Zhao, Y.F.2
-
17
-
-
34447332235
-
Assigning micro UAVs to task tours in an urban terrain
-
Jul.
-
T. Shima, S. Rasmussen, and D. Gross, "Assigning micro UAVs to task tours in an urban terrain," IEEE Trans. Control Syst. Technol., vol. 15, no. 4, pp. 601-611, Jul. 2007.
-
(2007)
IEEE Trans. Control Syst. Technol.
, vol.15
, Issue.4
, pp. 601-611
-
-
Shima, T.1
Rasmussen, S.2
Gross, D.3
-
18
-
-
0028413979
-
Scheduling flexible manufacturing systems using petri nets and heuristic search
-
Apr.
-
D. Y. Lee and F. DiCesare, "Scheduling flexible manufacturing systems using petri nets and heuristic search," IEEE Trans. Robot. Autom., vol. 10, no. 2, pp. 123-132, Apr. 1994.
-
(1994)
IEEE Trans. Robot. Autom.
, vol.10
, Issue.2
, pp. 123-132
-
-
Lee, D.Y.1
DiCesare, F.2
-
19
-
-
0242375709
-
A hybrid scheduling and control system architecture for warehouse management
-
Dec.
-
B. I. Kim, S. S. Heragu, R. J. Graves, and A. S. Onge, "A hybrid scheduling and control system architecture for warehouse management," IEEE Trans. Robot. Autom., vol. 19, no. 6, pp. 991-1001, Dec. 2003.
-
(2003)
IEEE Trans. Robot. Autom.
, vol.19
, Issue.6
, pp. 991-1001
-
-
Kim, B.I.1
Heragu, S.S.2
Graves, R.J.3
Onge, A.S.4
-
20
-
-
25444486755
-
Some aspects of scatter search in the flow-shop problem
-
DOI 10.1016/j.ejor.2004.08.021, PII S0377221704005600, Feature Cluster on Scatter Search Methods for Optimization
-
E. Nowicki and C. Smutnicki, "Some aspects of scatter search in the flow-shop problem," Euro. J. Oper. Res., vol. 169, no. 2, pp. 654-666, 2006. (Pubitemid 41375713)
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.2
, pp. 654-666
-
-
Nowicki, E.1
Smutnicki, C.2
-
21
-
-
13444251134
-
A comprehensive review and evaluation of permutation flowshop heuristics
-
DOI 10.1016/j.ejor.2004.04.017, PII S0377221704002553, Project Management and Scheduling
-
R. Ruiz and C. Maroto, "A comprehensive review and evaluation of permutation flowshop heuristics," Euro. J. Oper. Res., vol. 165, no. 2, pp. 479-494, 2005. (Pubitemid 40206377)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 479-494
-
-
Ruiz, R.1
Maroto, C.2
-
22
-
-
84989487658
-
Heuristics for integer programming using surrogate constraints
-
F. Glover, "Heuristics for integer programming using surrogate constraints," Decision Sci., vol. 8, no. 1, pp. 156-166, 1977.
-
(1977)
Decision Sci.
, vol.8
, Issue.1
, pp. 156-166
-
-
Glover, F.1
-
23
-
-
25444485816
-
Principles of scatter search
-
DOI 10.1016/j.ejor.2004.08.004, PII S0377221704005430, Feature Cluster on Scatter Search Methods for Optimization
-
R. R. Martí, M. Laguna, and F. Glover, "Principles of scatter search," Euro. J. Oper. Res., vol. 169, no. 2, pp. 359-372, 2006. (Pubitemid 41375696)
-
(2006)
European Journal of Operational Research
, vol.169
, Issue.2
, pp. 359-372
-
-
Marti, R.1
Laguna, M.2
Glover, F.3
-
24
-
-
0032000804
-
A new constructive heuristic for the flowshop scheduling problem
-
PII S0377221797000271
-
C. Koulamas, "A new constructive heuristic for the flowshop scheduling problem," Euro. J. Oper. Res., vol. 105, no. 1, pp. 66-71, 1998. (Pubitemid 128387761)
-
(1998)
European Journal of Operational Research
, vol.105
, Issue.1
, pp. 66-71
-
-
Koulamas, C.1
-
25
-
-
0001393583
-
Sequencing jobs through a multi-stage process in the minimum total time-A quick method of obtaining a near optimum
-
D. Palmer, "Sequencing jobs through a multi-stage process in the minimum total time-A quick method of obtaining a near optimum," Oper. Res. Quarterly, vol. 16, no. 1, pp. 101-107, 1965.
-
(1965)
Oper. Res. Quarterly
, vol.16
, Issue.1
, pp. 101-107
-
-
Palmer, D.1
-
26
-
-
0015316023
-
Heuristic algorithms for multistage flowshop scheduling problem
-
J. N. G. Gupta, "Heuristic algorithms for multistage flowshop scheduling problem," AIIE Trans., vol. 4, no. 1, pp. 11-18, 1972.
-
(1972)
AIIE Trans.
, vol.4
, Issue.1
, pp. 11-18
-
-
Gupta, J.N.G.1
-
27
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
-
DOI 10.1016/0305-0483(83)90088-9
-
M. Nawaz, E. E. Enscore, and I. Ham, "A heuristic algorithm for the m-machine, n-job flow shop sequencing problem," OMEGA, vol. 11, no. 1, pp. 91-95, 1983. (Pubitemid 13193807)
-
(1983)
Omega
, vol.11
, Issue.1
, pp. 91-95
-
-
Nawaz, M.1
Enscore Jr., E.E.2
Ham, I.3
-
28
-
-
0031281221
-
Variable neighborhood search
-
N. Mladenovic, "Variable neighborhood search," Comput. Oper. Res., vol. 24, no. 11, pp. 1097-1100, 1997.
-
(1997)
Comput. Oper. Res.
, vol.24
, Issue.11
, pp. 1097-1100
-
-
Mladenovic, N.1
-
29
-
-
33750841084
-
A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
-
DOI 10.1016/j.ejor.2005.12.009, PII S0377221705008507
-
R. Ruiz and T. Stützle, "A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem," Euro. J. Oper. Res., vol. 177, no. 3, pp. 2033-2049, 2007. (Pubitemid 44712036)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 2033-2049
-
-
Ruiz, R.1
Stutzle, T.2
-
30
-
-
33751236810
-
A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
-
DOI 10.1016/j.ejor.2005.12.024, PII S0377221705008453
-
M. F. Tasgetiren, Y. C. Liang, M. Sevkli, and G. Gencyilmaz, "A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem," Euro. J. Oper. Res., vol. 177, no. 3, pp. 1930-1947, 2007. (Pubitemid 44780934)
-
(2007)
European Journal of Operational Research
, vol.177
, Issue.3
, pp. 1930-1947
-
-
Tasgetiren, M.F.1
Liang, Y.-C.2
Sevkli, M.3
Gencyilmaz, G.4
-
32
-
-
0027201278
-
Benchmarks for basic scheduling problems
-
DOI 10.1016/0377-2217(93)90182-M
-
E. Taillard, "Benchmarks for basic scheduling problems," Euro. J. Oper. Res., vol. 64, no. 2, pp. 278-285, 1993. (Pubitemid 23599340)
-
(1993)
European Journal of Operational Research
, vol.64
, Issue.2
, pp. 278-285
-
-
Taillard, E.1
-
33
-
-
24144443448
-
A branch-and-bound algorithm to minimize the makespan in a flowshop with blocking
-
DOI 10.1007/s10479-005-2444-3
-
D. P. Ronconi, "A branch-And-bound algorithm to minimize the makespan in a flowshop with blocking," Annals Oper. Res., vol. 138, no. 1, pp. 53-65, 2005. (Pubitemid 41241790)
-
(2005)
Annals of Operations Research
, vol.138
, Issue.1
, pp. 53-65
-
-
Ronconi, D.P.1
-
34
-
-
0035277503
-
Minimizing makespan in a blocking flowshop using genetic algorithms
-
DOI 10.1016/S0925-5273(99)00104-8
-
V. Caraffa, S. Ianes, T. P. Bagchi, and C. Sriskandarajah, "Minimizing makespan in a blocking flowshop using genetic algorithms," Int. J. Prod. Econom., vol. 70, no. 2, pp. 101-115, 2001. (Pubitemid 32264325)
-
(2001)
International Journal of Production Economics
, vol.70
, Issue.2
, pp. 101-115
-
-
Caraffa, V.1
Ianes, S.2
Bagchi, T.P.3
Sriskandarajah, C.4
-
35
-
-
33748279816
-
The permutation flow shop problem with blocking. A tabu search approach
-
DOI 10.1016/j.omega.2005.07.004, PII S0305048305000915
-
J. Grabowski and J. Pempera, "The permutation flow shop problem with blocking. A tabu search approach," Omega, vol. 35, no. 3, pp. 302-311, 2007. (Pubitemid 44317633)
-
(2007)
Omega
, vol.35
, Issue.3
, pp. 302-311
-
-
Grabowski, J.1
Pempera, J.2
|