Volumn 19, Issue 5, 2011, Pages 976-989

A scatter search algorithm for a multistage production scheduling problem with blocking and semi-continuous batching machine

Author keywords

Blocking; mixed integer linear programming (MILP) model; multistage production scheduling; scatter search; semi continuous batching machine

Indexed keywords

BLOCKING; MIXED INTEGER LINEAR PROGRAMMING MODEL; MULTISTAGE PRODUCTION; SCATTER SEARCH; SEMI-CONTINUOUS;

EID: 80051903961     PISSN: 10636536     EISSN: None     Source Type: Journal    
DOI: 10.1109/TCST.2010.2060201     Document Type: Article
Times cited : (19)

References (35)
  • 2
    • 0025597496 scopus 로고
    • Hybrid hierarchical scheduling and control systems in manufacturing
    • Dec.
    • B. Bona, P. Brandimarte, C. Greco, and G. Menga, "Hybrid hierarchical scheduling and control systems in manufacturing," IEEE Trans. Robot. Autom., vol. 6, no. 6, pp. 673-686, Dec. 1990.
    • (1990) IEEE Trans. Robot. Autom. , vol.6 , Issue.6 , pp. 673-686
    • Bona, B.1    Brandimarte, P.2    Greco, C.3    Menga, G.4
  • 3
    • 0024079275 scopus 로고
    • Decision models for aiding FMS scheduling and control
    • Sep./Oct.
    • J. C. Ammons, T. Govindaraj, and C. M. Mitchell, "Decision models for aiding FMS scheduling and control," IEEE Trans. Syst., Man, Cybern., vol. 18, no. 5, pp. 744-756, Sep./Oct. 1988.
    • (1988) IEEE Trans. Syst., Man, Cybern. , vol.18 , Issue.5 , pp. 744-756
    • Ammons, J.C.1    Govindaraj, T.2    Mitchell, C.M.3
  • 4
    • 37149016932 scopus 로고    scopus 로고
    • A predictive reactive scheduling method for color-coating production in steel industry
    • L. X. Tang and X. P. Wang, "A predictive reactive scheduling method for color-coating production in steel industry," Int. J. Adv. Manuf. Technol., vol. 35, no. 7-8, pp. 633-645, 2008.
    • (2008) Int. J. Adv. Manuf. Technol. , vol.35 , Issue.7-8 , pp. 633-645
    • Tang, L.X.1    Wang, X.P.2
  • 5
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • N. G. Hall and C. Sriskandarajah, "A survey of machine scheduling problems with blocking and no-wait in process," Oper. Res., vol. 44, no. 3, pp. 510-525, 1996. (Pubitemid 126669516)
    • (1996) Operations Research , vol.44 , Issue.3 , pp. 510-525
    • Hall, N.G.1    Sriskandarajah, C.2
  • 6
    • 0026880377 scopus 로고
    • Discrete event sequencing as a traveling salesman problem
    • E. D. Kosiba, J. R. Wright, and A. E. Cobbs, "Discrete event sequencing as a traveling salesman problem," Comput. Ind., vol. 19, no. 3, pp. 317-327, 1992.
    • (1992) Comput. Ind. , vol.19 , Issue.3 , pp. 317-327
    • Kosiba, E.D.1    Wright, J.R.2    Cobbs, A.E.3
  • 7
    • 0032049311 scopus 로고    scopus 로고
    • The hot strip mill production scheduling problem: A tabu search approach
    • PII S0377221797002774
    • L. Lopez, M. W. Carter, and M. Gendreau, "The hot strip mill production scheduling problem: A tabu search approach," Euro. J. Operat. Res., vol. 106, no. 2-3, pp. 317-335, 1998. (Pubitemid 128399655)
    • (1998) European Journal of Operational Research , vol.106 , Issue.2-3 , pp. 317-335
    • Lopez, L.1    Carter, M.W.2    Gendreau, M.3
  • 8
    • 0033741404 scopus 로고    scopus 로고
    • Multiple traveling salesman problem model for hot scheduling in Shanghai Baoshan Iron & Steel Complex
    • L. X. Tang, J. Y. Liu, A. Y. Rong, and Z. H. Yang, "Multiple traveling salesman problem model for hot scheduling in Shanghai Baoshan Iron & Steel Complex," Euro. J. Oper. Res., vol. 124, no. 2, pp. 267-282, 2000.
    • (2000) Euro. J. Oper. Res. , vol.124 , Issue.2 , pp. 267-282
    • Tang, L.X.1    Liu, J.Y.2    Rong, A.Y.3    Yang, Z.H.4
  • 9
    • 0038789162 scopus 로고    scopus 로고
    • A flexible decision support system for steel hot rolling mill scheduling
    • P. Cowling, "A flexible decision support system for steel hot rolling mill scheduling," Comput. Ind. Eng., vol. 45, no. 2, pp. 307-321, 2003.
    • (2003) Comput. Ind. Eng. , vol.45 , Issue.2 , pp. 307-321
    • Cowling, P.1
  • 10
    • 43449091631 scopus 로고    scopus 로고
    • Integration of batching and scheduling for hot rolling production in the steel industry
    • X. P. Wang and L. X. Tang, "Integration of batching and scheduling for hot rolling production in the steel industry," Int. J. Adv. Manuf. Technol., vol. 36, no. 5-6, pp. 431-441, 2008.
    • (2008) Int. J. Adv. Manuf. Technol. , vol.36 , Issue.5-6 , pp. 431-441
    • Wang, X.P.1    Tang, L.X.2
  • 11
    • 73249137793 scopus 로고    scopus 로고
    • Cut scheduling optimization in plate mill finishing area through mixed-integer linear programming
    • Jan.
    • C. Aurora, D. Cettolo, and F. A. Cuzzola, "Cut scheduling optimization in plate mill finishing area through mixed-integer linear programming," IEEE Trans. Control Syst. Technol., vol. 18, no. 1, pp. 118-127, Jan. 2010.
    • (2010) IEEE Trans. Control Syst. Technol. , vol.18 , Issue.1 , pp. 118-127
    • Aurora, C.1    Cettolo, D.2    Cuzzola, F.A.3
  • 12
    • 73249132545 scopus 로고    scopus 로고
    • A two phase heuristic for the production scheduling of heavy plates in steel industry
    • Jan.
    • L. X. Tang and X. P. Wang, "A two phase heuristic for the production scheduling of heavy plates in steel industry," IEEE Trans. Control Syst. Technol., vol. 18, no. 1, pp. 104-117, Jan. 2010.
    • (2010) IEEE Trans. Control Syst. Technol. , vol.18 , Issue.1 , pp. 104-117
    • Tang, L.X.1    Wang, X.P.2
  • 13
    • 0026898494 scopus 로고
    • Efficient algorithms for scheduling semiconductor burn-in operations
    • C. Y. Lee, R. Uzsoy, and L. A. Martin-Vega, "Efficient algorithms for scheduling semiconductor burn-in operations," Oper. Res., vol. 40, no. 4, pp. 764-775, 1992. (Pubitemid 23581869)
    • (1992) Operations Research , vol.40 , Issue.4 , pp. 764-775
    • Lee Chung-Yee1    Uzsoy Reha2    Martin-Vega Louis, A.3
  • 14
    • 0036643150 scopus 로고    scopus 로고
    • Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals
    • DOI 10.1016/S0305-0548(00)00098-8, PII S0305054800000988
    • C. S. Sung, Y. I. Choung, J. M. Hong, and Y. H. Kim, "Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals," Comput. Oper. Res., vol. 29, no. 8, pp. 995-1007, 2002. (Pubitemid 34196076)
    • (2002) Computers and Operations Research , vol.29 , Issue.8 , pp. 995-1007
    • Sung, C.S.1    Choung, Y.I.2    Hong, J.M.3    Kim, Y.H.4
  • 15
    • 0036778940 scopus 로고    scopus 로고
    • A genetic algorithm to minimize maximum lateness on a batch processing machine
    • DOI 10.1016/S0305-0548(01)00031-4, PII S0305054801000314
    • C. S.Wang and R. Uzsoy, "A genetic algorithm to minimize maximum lateness on a batch processing machine," Comput. Oper. Res., vol. 29, no. 12, pp. 1621-1640, 2002. (Pubitemid 34589742)
    • (2002) Computers and Operations Research , vol.29 , Issue.12 , pp. 1621-1640
    • Wang, C.-S.1    Uzsoy, R.2
  • 16
    • 40649116895 scopus 로고    scopus 로고
    • Scheduling a single semi-continuous batching machine
    • L. X. Tang and Y. F. Zhao, "Scheduling a single semi-continuous batching machine," Omega, vol. 36, no. 6, pp. 992-1004, 2008.
    • (2008) Omega , vol.36 , Issue.6 , pp. 992-1004
    • Tang, L.X.1    Zhao, Y.F.2
  • 17
    • 34447332235 scopus 로고    scopus 로고
    • Assigning micro UAVs to task tours in an urban terrain
    • Jul.
    • T. Shima, S. Rasmussen, and D. Gross, "Assigning micro UAVs to task tours in an urban terrain," IEEE Trans. Control Syst. Technol., vol. 15, no. 4, pp. 601-611, Jul. 2007.
    • (2007) IEEE Trans. Control Syst. Technol. , vol.15 , Issue.4 , pp. 601-611
    • Shima, T.1    Rasmussen, S.2    Gross, D.3
  • 18
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using petri nets and heuristic search
    • Apr.
    • D. Y. Lee and F. DiCesare, "Scheduling flexible manufacturing systems using petri nets and heuristic search," IEEE Trans. Robot. Autom., vol. 10, no. 2, pp. 123-132, Apr. 1994.
    • (1994) IEEE Trans. Robot. Autom. , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    DiCesare, F.2
  • 19
    • 0242375709 scopus 로고    scopus 로고
    • A hybrid scheduling and control system architecture for warehouse management
    • Dec.
    • B. I. Kim, S. S. Heragu, R. J. Graves, and A. S. Onge, "A hybrid scheduling and control system architecture for warehouse management," IEEE Trans. Robot. Autom., vol. 19, no. 6, pp. 991-1001, Dec. 2003.
    • (2003) IEEE Trans. Robot. Autom. , vol.19 , Issue.6 , pp. 991-1001
    • Kim, B.I.1    Heragu, S.S.2    Graves, R.J.3    Onge, A.S.4
  • 20
    • 25444486755 scopus 로고    scopus 로고
    • Some aspects of scatter search in the flow-shop problem
    • DOI 10.1016/j.ejor.2004.08.021, PII S0377221704005600, Feature Cluster on Scatter Search Methods for Optimization
    • E. Nowicki and C. Smutnicki, "Some aspects of scatter search in the flow-shop problem," Euro. J. Oper. Res., vol. 169, no. 2, pp. 654-666, 2006. (Pubitemid 41375713)
    • (2006) European Journal of Operational Research , vol.169 , Issue.2 , pp. 654-666
    • Nowicki, E.1    Smutnicki, C.2
  • 21
    • 13444251134 scopus 로고    scopus 로고
    • A comprehensive review and evaluation of permutation flowshop heuristics
    • DOI 10.1016/j.ejor.2004.04.017, PII S0377221704002553, Project Management and Scheduling
    • R. Ruiz and C. Maroto, "A comprehensive review and evaluation of permutation flowshop heuristics," Euro. J. Oper. Res., vol. 165, no. 2, pp. 479-494, 2005. (Pubitemid 40206377)
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 479-494
    • Ruiz, R.1    Maroto, C.2
  • 22
    • 84989487658 scopus 로고
    • Heuristics for integer programming using surrogate constraints
    • F. Glover, "Heuristics for integer programming using surrogate constraints," Decision Sci., vol. 8, no. 1, pp. 156-166, 1977.
    • (1977) Decision Sci. , vol.8 , Issue.1 , pp. 156-166
    • Glover, F.1
  • 23
    • 25444485816 scopus 로고    scopus 로고
    • Principles of scatter search
    • DOI 10.1016/j.ejor.2004.08.004, PII S0377221704005430, Feature Cluster on Scatter Search Methods for Optimization
    • R. R. Martí, M. Laguna, and F. Glover, "Principles of scatter search," Euro. J. Oper. Res., vol. 169, no. 2, pp. 359-372, 2006. (Pubitemid 41375696)
    • (2006) European Journal of Operational Research , vol.169 , Issue.2 , pp. 359-372
    • Marti, R.1    Laguna, M.2    Glover, F.3
  • 24
    • 0032000804 scopus 로고    scopus 로고
    • A new constructive heuristic for the flowshop scheduling problem
    • PII S0377221797000271
    • C. Koulamas, "A new constructive heuristic for the flowshop scheduling problem," Euro. J. Oper. Res., vol. 105, no. 1, pp. 66-71, 1998. (Pubitemid 128387761)
    • (1998) European Journal of Operational Research , vol.105 , Issue.1 , pp. 66-71
    • Koulamas, C.1
  • 25
    • 0001393583 scopus 로고
    • Sequencing jobs through a multi-stage process in the minimum total time-A quick method of obtaining a near optimum
    • D. Palmer, "Sequencing jobs through a multi-stage process in the minimum total time-A quick method of obtaining a near optimum," Oper. Res. Quarterly, vol. 16, no. 1, pp. 101-107, 1965.
    • (1965) Oper. Res. Quarterly , vol.16 , Issue.1 , pp. 101-107
    • Palmer, D.1
  • 26
    • 0015316023 scopus 로고
    • Heuristic algorithms for multistage flowshop scheduling problem
    • J. N. G. Gupta, "Heuristic algorithms for multistage flowshop scheduling problem," AIIE Trans., vol. 4, no. 1, pp. 11-18, 1972.
    • (1972) AIIE Trans. , vol.4 , Issue.1 , pp. 11-18
    • Gupta, J.N.G.1
  • 27
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem
    • DOI 10.1016/0305-0483(83)90088-9
    • M. Nawaz, E. E. Enscore, and I. Ham, "A heuristic algorithm for the m-machine, n-job flow shop sequencing problem," OMEGA, vol. 11, no. 1, pp. 91-95, 1983. (Pubitemid 13193807)
    • (1983) Omega , vol.11 , Issue.1 , pp. 91-95
    • Nawaz, M.1    Enscore Jr., E.E.2    Ham, I.3
  • 28
    • 0031281221 scopus 로고    scopus 로고
    • Variable neighborhood search
    • N. Mladenovic, "Variable neighborhood search," Comput. Oper. Res., vol. 24, no. 11, pp. 1097-1100, 1997.
    • (1997) Comput. Oper. Res. , vol.24 , Issue.11 , pp. 1097-1100
    • Mladenovic, N.1
  • 29
    • 33750841084 scopus 로고    scopus 로고
    • A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem
    • DOI 10.1016/j.ejor.2005.12.009, PII S0377221705008507
    • R. Ruiz and T. Stützle, "A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem," Euro. J. Oper. Res., vol. 177, no. 3, pp. 2033-2049, 2007. (Pubitemid 44712036)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 2033-2049
    • Ruiz, R.1    Stutzle, T.2
  • 30
    • 33751236810 scopus 로고    scopus 로고
    • A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem
    • DOI 10.1016/j.ejor.2005.12.024, PII S0377221705008453
    • M. F. Tasgetiren, Y. C. Liang, M. Sevkli, and G. Gencyilmaz, "A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem," Euro. J. Oper. Res., vol. 177, no. 3, pp. 1930-1947, 2007. (Pubitemid 44780934)
    • (2007) European Journal of Operational Research , vol.177 , Issue.3 , pp. 1930-1947
    • Tasgetiren, M.F.1    Liang, Y.-C.2    Sevkli, M.3    Gencyilmaz, G.4
  • 32
    • 0027201278 scopus 로고
    • Benchmarks for basic scheduling problems
    • DOI 10.1016/0377-2217(93)90182-M
    • E. Taillard, "Benchmarks for basic scheduling problems," Euro. J. Oper. Res., vol. 64, no. 2, pp. 278-285, 1993. (Pubitemid 23599340)
    • (1993) European Journal of Operational Research , vol.64 , Issue.2 , pp. 278-285
    • Taillard, E.1
  • 33
    • 24144443448 scopus 로고    scopus 로고
    • A branch-and-bound algorithm to minimize the makespan in a flowshop with blocking
    • DOI 10.1007/s10479-005-2444-3
    • D. P. Ronconi, "A branch-And-bound algorithm to minimize the makespan in a flowshop with blocking," Annals Oper. Res., vol. 138, no. 1, pp. 53-65, 2005. (Pubitemid 41241790)
    • (2005) Annals of Operations Research , vol.138 , Issue.1 , pp. 53-65
    • Ronconi, D.P.1
  • 35
    • 33748279816 scopus 로고    scopus 로고
    • The permutation flow shop problem with blocking. A tabu search approach
    • DOI 10.1016/j.omega.2005.07.004, PII S0305048305000915
    • J. Grabowski and J. Pempera, "The permutation flow shop problem with blocking. A tabu search approach," Omega, vol. 35, no. 3, pp. 302-311, 2007. (Pubitemid 44317633)
    • (2007) Omega , vol.35 , Issue.3 , pp. 302-311
    • Grabowski, J.1    Pempera, J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.