-
1
-
-
0023843528
-
A scheduling model for LTV steel's Cleveland works' twin-strand continuous slab caster
-
Box, R.E., and Herbe, D.G., 1988, A scheduling model for LTV Steel'S Cleveland Works' twin-strand continuous slab caster. Interface, 18, 42-56.
-
(1988)
Interface
, vol.18
, pp. 42-56
-
-
Box, R.E.1
Herbe, D.G.2
-
2
-
-
0000901914
-
The trim problem
-
Eisemann, K., 1957, The trim problem. Management Science, 3, 279-284.
-
(1957)
Management Science
, vol.3
, pp. 279-284
-
-
Eisemann, K.1
-
4
-
-
0001510482
-
A linear programming approach to the cutting stock problems
-
Gilmore, P.C., and Gomery, R.E., 1961, A linear programming approach to the cutting stock problems. Operations Research, 9, 849-859.
-
(1961)
Operations Research
, vol.9
, pp. 849-859
-
-
Gilmore, P.C.1
Gomery, R.E.2
-
5
-
-
0011773060
-
Twin-strand continuous slab caster scheduling model
-
London, UK
-
Herbe, D.G., and Ivey, R.T., 1990, Twin-strand continuous slab caster scheduling model. Proceedings of the 3rd International Oxygen Steel-making Congress, London, UK.
-
(1990)
Proceedings of the 3rd International Oxygen Steel-making Congress
-
-
Herbe, D.G.1
Ivey, R.T.2
-
6
-
-
0011750513
-
-
The Iron and Steelmaker Society, Warrendale, PA, USA
-
Lally, B., Biegler, L., and Herein, H., 1987, A model for sequencing a continuous casting operation to minimize costs. The Iron and Steelmaker Society, Warrendale, PA, USA, pp. 6370.
-
(1987)
A model for sequencing a continuous casting operation to minimize costs
, pp. 6370
-
-
Lally, B.1
Biegler, L.2
Herein, H.3
-
7
-
-
0030102183
-
Primary production scheduling at steelmaking industries
-
Lee, H.S., Murthy, S.S., Haider, S.W., and Morse, D.V., 1996, Primary production scheduling at steelmaking industries. IBM Journal of Research and Development, 40, 231-252.
-
(1996)
IBM Journal of Research and Development
, vol.40
, pp. 231-252
-
-
Lee, H.S.1
Murthy, S.S.2
Haider, S.W.3
Morse, D.V.4
-
8
-
-
0011717151
-
Scheplan - A scheduling expert for steel making processes
-
Hitachi City, Japan
-
Masayuki, N., and Morishita, S.-I., 1988, Scheplan-A scheduling expert for steel making processes. In Proceedings of the International Workshop on Artificial Intelligence for Industrial Applications, Hitachi City, Japan, pp. 467-472.
-
(1988)
Proceedings of the International Workshop on Artificial Intelligence for Industrial Applications
, pp. 467-472
-
-
Masayuki, N.1
Morishita, S.-I.2
-
9
-
-
0000142257
-
Cooperative scheduling and its application to steel making processes
-
Masayuki, N., and Morishita, S.-I., 1991, Cooperative scheduling and its application to steel making processes. IEEE Trans. Industrial Electron., 38, 150-155.
-
(1991)
IEEE Trans. Industrial Electron.
, vol.38
, pp. 150-155
-
-
Masayuki, N.1
Morishita, S.-I.2
-
10
-
-
0003320291
-
Scheduling steel production on two twin strand casters
-
East Fishkill, NY, USA
-
Meil, D., and Lee, H.S., 1993, Scheduling steel production on two twin strand casters. Proceedings of the International Manufacturing Productivity Symposium, East Fishkill, NY, USA.
-
(1993)
Proceedings of the International Manufacturing Productivity Symposium
-
-
Meil, D.1
Lee, H.S.2
-
13
-
-
0003259634
-
A caster sequencing optimization program for Geneva steel's facility modernization project
-
Tong, X., Silverman, J., and Clausen, S., 1994, A caster sequencing optimization program for Geneva Steel'S Facility Modernization Project. Presented at the 1994 Annual AISE Convention.
-
(1994)
1994 Annual AISE Convention
-
-
Tong, X.1
Silverman, J.2
Clausen, S.3
|