The SCRAPESIM computer simulation
-
Clemmens, J. R, and Willenbrock, J. H. (1978). "The SCRAPESIM computer simulation. " J. Constr. Div., 104(4), 419-435.
-
(1978)
J. Constr. Div.
, vol.104
, Issue.4
, pp. 419-435
-
-
Clemmens, J.R.1
Willenbrock, J.H.2
-
3
-
-
0028452701
-
Simulation verifies queuing program for selecting loader-truck fleets
-
Farid, F., and Koning, T. L. (1994). "Simulation verifies queuing program for selecting loader-truck fleets." J. Constr. Eng. Manage., 120 (2). 386-404.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.2
, pp. 386-404
-
-
Farid, F.1
Koning, T.L.2
-
4
-
-
0027666467
-
Comparison of two simulation methodologies in construction
-
Gonzalez-Quevedo, A. A., Abourizk, S. M., Iseley, D. T., and Halpin, D. W. (1993). "Comparison of two simulation methodologies in construction. " J. Constr. Eng. Manage., 119(3), 573-589.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.3
, pp. 573-589
-
-
Gonzalez-Quevedo, A.A.1
Abourizk, S.M.2
Iseley, D.T.3
Halpin, D.W.4
-
5
-
-
84873649447
-
-
MSc. thesis, Dept. of Civil, Construction, and Envrionmental Engineering, North Carolina State Univ., Raleigh, NC
-
Hajifathalian, K. (2011). "Effects of working strategy and duration variance on productivity and work in process a simulation-based investigation and oops game: Cost-benefits tradeoff analysis of reliable planning for construction activities." MSc. thesis, Dept. of Civil, Construction, and Envrionmental Engineering, North Carolina State Univ., Raleigh, NC.
-
(2011)
Effects of Working Strategy and Duration Variance on Productivity and Work in Process a Simulation-based Investigation and Oops Game: Cost-benefits Tradeoff Analysis of Reliable Planning for Construction Activities
-
-
Hajifathalian, K.1
-
6
-
-
0003849209
-
-
Irwin, Chicago, IL
-
Nopp, W. J., and Spearman, M. L. (1996). Factory physics: Foundation of manufacturing management, Irwin, Chicago, IL.
-
(1996)
Factory Physics: Foundation of Manufacturing Management
-
-
Nopp, W.J.1
Spearman, M.L.2
-
7
-
-
0000290973
-
Comparison of construction alternatives using matched simulation experiments
-
Ioannou, P. G., and Martinez, J. C. (1996). "Comparison of construction alternatives using matched simulation experiments." J. Constr. Eng. Manage., 122(3), 231-241.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.3
, pp. 231-241
-
-
Ioannou, P.G.1
Martinez, J.C.2
-
8
-
-
84856737237
-
-
Taylor & Francis, Independence, KY
-
Kenley, R., and Seppanen, O. (2009). Location-based management system for construction: improving productivity using flowline, Taylor & Francis, Independence, KY.
-
(2009)
Location-based Management System for Construction: Improving Productivity Using Flowline
-
-
Kenley, R.1
Seppanen, O.2
-
10
-
-
12244286007
-
The theory of project management: Explanation to novel methods
-
Lean Construction Institute, San Diego, CA
-
Koskela, L. (2002). "The theory of project management: explanation to novel methods." Proc., 10th Int. Annual Conf. of the Int. Group for Lean Construction, Lean Construction Institute, San Diego, CA, 1-11.
-
(2002)
Proc., 10th Int. Annual Conf. of the Int. Group for Lean Construction
, pp. 1-11
-
-
Koskela, L.1
-
11
-
-
34250664260
-
Making-do-The eighth category of waste
-
Lean Construction Institute, San Diego, CA
-
Koskela, L. (2004). "Making-do-The eighth category of waste." Proc, 12th Int. Annual Conf. of the Int. Croup for Lean Construction, Lean Construction Institute, San Diego, CA, 1-10.
-
(2004)
Proc, 12th Int. Annual Conf. of the Int. Croup for Lean Construction
, pp. 1-10
-
-
Koskela, L.1
-
12
-
-
0000861722
-
A proof of the queuing formula: L = λW
-
Little, J. D. C. (1961). "A proof of the queuing formula: L = λW." Oper. Res., 9(3), 383-387.
-
(1961)
Oper. Res.
, vol.9
, Issue.3
, pp. 383-387
-
-
Little, J.D.C.1
-
13
-
-
0034225611
-
Probability distribution functions for construction simulation
-
Maio, C., Schexnayder, C., Knutson, K., and Weber, S. (2000). "Probability distribution functions for construction simulation. " J. Constr. Eng. Manage., 126(4), 285-292.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 285-292
-
-
Maio, C.1
Schexnayder, C.2
Knutson, K.3
Weber, S.4
-
16
-
-
0031371933
-
State-based probabilistic scheduling using STROBOSCOPE'S CPM add-on
-
ASCE, Reston, VA
-
Martinez, J. C., and Ioannou, P. G. (1997). "State-based probabilistic scheduling using STROBOSCOPE'S CPM add-on. " Proc, Construction Congress V, ASCE, Reston, VA, 438-445.
-
(1997)
Proc, Construction Congress V
, pp. 438-445
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
17
-
-
0032677122
-
General-purpose systems for effective construction simulation
-
Martinez, J. C., and Ioannou, P. G. (1999). "General-purpose systems for effective construction simulation. " J. Constr. Eng. Manage., 125(4), 256-276.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.4
, pp. 256-276
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
18
-
-
0004158431
-
-
McGraw-Hill, New York
-
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction, McGraw-Hill, New York.
-
(1989)
Productivity Improvement in Construction
-
-
Oglesby, C.H.1
Parker, H.W.2
Howell, G.A.3
-
19
-
-
0003454484
-
-
Brooks/Cole, Belmont, CA
-
Ott, L. R., and Longnecker, M. (2001). An introduction to statistical methods and data analysis, Brooks/Cole, Belmont, CA.
-
(2001)
An Introduction to Statistical Methods and Data Analysis
-
-
Ott, L.R.1
Longnecker, M.2
-
20
-
-
84856683531
-
Using controlled experiments to calibrate computer models: The airplane game as a lean simulation exercise
-
Lean Construction Institute, San Diego, CA
-
Rybkowski, Z. K., Wong, J., Ballard, G., and Tommelein, I. D. (2008). "Using controlled experiments to calibrate computer models: The airplane game as a lean simulation exercise." Proc. 16th Int. Annual Conf. of the Int. Group for Lean Construction, Lean Construction Institute, San Diego, CA, 1-10.
-
(2008)
Proc. 16th Int. Annual Conf. of the Int. Group for Lean Construction
, pp. 1-10
-
-
Rybkowski, Z.K.1
Wong, J.2
Ballard, G.3
Tommelein, I.D.4
-
21
-
-
33748795375
-
Lean construction: From theory to implementation
-
Salem, O., Solomon, J., Genaidy, A., and Minkarah, I. (2006). "Lean construction: from theory to implementation. " J. Constr. Eng. Manage., 22(4), 168-175.
-
(2006)
J. Constr. Eng. Manage.
, vol.22
, Issue.4
, pp. 168-175
-
-
Salem, O.1
Solomon, J.2
Genaidy, A.3
Minkarah, I.4
-
22
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). "Parade game: impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
-
23
-
-
80052786621
-
Causes of variation in construction project task starting times and duration
-
Wambeke, B. W., Hsiang, S. M., and Liu, M. (2011). "Causes of variation in construction project task starting times and duration. " J. Constr. Eng. Manage., 137(9), 663-677.
-
(2011)
J. Constr. Eng. Manage.
, vol.137
, Issue.9
, pp. 663-677
-
-
Wambeke, B.W.1
Hsiang, S.M.2
Liu, M.3
-
24
-
-
0003463029
-
-
Rawson and Associates, New York
-
Womack, J. P., Jones, D. T., and Roos, D. (1990). The machine that changed the world, Rawson and Associates, New York.
-
(1990)
The Machine That Changed the World
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
|