메뉴 건너뛰기




Volumn 138, Issue 9, 2012, Pages 1035-1043

Effects of production control strategy and duration variance on productivity and work in process: Simulation-based investigation

Author keywords

Duration variance; Productivity; Simulation; Work in process

Indexed keywords

COEFFICIENT OF VARIANCE; CONSTRUCTION ACTIVITIES; CONSTRUCTION MANAGER; CONSTRUCTION PROCESS; DURATION VARIANCE; PRODUCTION CONTROL STRATEGIES; PROJECT PERFORMANCE; RESOURCE-BASED; SEQUENTIAL TASK; SERIAL PRODUCTION LINE; SIMULATION; WORK IN PROCESS;

EID: 84873654790     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000517     Document Type: Article
Times cited : (9)

References (24)
  • 2
    • 0018159874 scopus 로고
    • The SCRAPESIM computer simulation
    • Clemmens, J. R, and Willenbrock, J. H. (1978). "The SCRAPESIM computer simulation. " J. Constr. Div., 104(4), 419-435.
    • (1978) J. Constr. Div. , vol.104 , Issue.4 , pp. 419-435
    • Clemmens, J.R.1    Willenbrock, J.H.2
  • 3
    • 0028452701 scopus 로고
    • Simulation verifies queuing program for selecting loader-truck fleets
    • Farid, F., and Koning, T. L. (1994). "Simulation verifies queuing program for selecting loader-truck fleets." J. Constr. Eng. Manage., 120 (2). 386-404.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.2 , pp. 386-404
    • Farid, F.1    Koning, T.L.2
  • 7
    • 0000290973 scopus 로고    scopus 로고
    • Comparison of construction alternatives using matched simulation experiments
    • Ioannou, P. G., and Martinez, J. C. (1996). "Comparison of construction alternatives using matched simulation experiments." J. Constr. Eng. Manage., 122(3), 231-241.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.3 , pp. 231-241
    • Ioannou, P.G.1    Martinez, J.C.2
  • 10
    • 12244286007 scopus 로고    scopus 로고
    • The theory of project management: Explanation to novel methods
    • Lean Construction Institute, San Diego, CA
    • Koskela, L. (2002). "The theory of project management: explanation to novel methods." Proc., 10th Int. Annual Conf. of the Int. Group for Lean Construction, Lean Construction Institute, San Diego, CA, 1-11.
    • (2002) Proc., 10th Int. Annual Conf. of the Int. Group for Lean Construction , pp. 1-11
    • Koskela, L.1
  • 12
    • 0000861722 scopus 로고
    • A proof of the queuing formula: L = λW
    • Little, J. D. C. (1961). "A proof of the queuing formula: L = λW." Oper. Res., 9(3), 383-387.
    • (1961) Oper. Res. , vol.9 , Issue.3 , pp. 383-387
    • Little, J.D.C.1
  • 13
    • 0034225611 scopus 로고    scopus 로고
    • Probability distribution functions for construction simulation
    • Maio, C., Schexnayder, C., Knutson, K., and Weber, S. (2000). "Probability distribution functions for construction simulation. " J. Constr. Eng. Manage., 126(4), 285-292.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 285-292
    • Maio, C.1    Schexnayder, C.2    Knutson, K.3    Weber, S.4
  • 16
    • 0031371933 scopus 로고    scopus 로고
    • State-based probabilistic scheduling using STROBOSCOPE'S CPM add-on
    • ASCE, Reston, VA
    • Martinez, J. C., and Ioannou, P. G. (1997). "State-based probabilistic scheduling using STROBOSCOPE'S CPM add-on. " Proc, Construction Congress V, ASCE, Reston, VA, 438-445.
    • (1997) Proc, Construction Congress V , pp. 438-445
    • Martinez, J.C.1    Ioannou, P.G.2
  • 17
    • 0032677122 scopus 로고    scopus 로고
    • General-purpose systems for effective construction simulation
    • Martinez, J. C., and Ioannou, P. G. (1999). "General-purpose systems for effective construction simulation. " J. Constr. Eng. Manage., 125(4), 256-276.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.4 , pp. 256-276
    • Martinez, J.C.1    Ioannou, P.G.2
  • 20
    • 84856683531 scopus 로고    scopus 로고
    • Using controlled experiments to calibrate computer models: The airplane game as a lean simulation exercise
    • Lean Construction Institute, San Diego, CA
    • Rybkowski, Z. K., Wong, J., Ballard, G., and Tommelein, I. D. (2008). "Using controlled experiments to calibrate computer models: The airplane game as a lean simulation exercise." Proc. 16th Int. Annual Conf. of the Int. Group for Lean Construction, Lean Construction Institute, San Diego, CA, 1-10.
    • (2008) Proc. 16th Int. Annual Conf. of the Int. Group for Lean Construction , pp. 1-10
    • Rybkowski, Z.K.1    Wong, J.2    Ballard, G.3    Tommelein, I.D.4
  • 22
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). "Parade game: impact of work flow variability on trade performance." J. Constr. Eng. Manage., 125(5), 304-310.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.A.3
  • 23
    • 80052786621 scopus 로고    scopus 로고
    • Causes of variation in construction project task starting times and duration
    • Wambeke, B. W., Hsiang, S. M., and Liu, M. (2011). "Causes of variation in construction project task starting times and duration. " J. Constr. Eng. Manage., 137(9), 663-677.
    • (2011) J. Constr. Eng. Manage. , vol.137 , Issue.9 , pp. 663-677
    • Wambeke, B.W.1    Hsiang, S.M.2    Liu, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.