Volumn 137, Issue 9, 2011, Pages 663-677

Causes of variation in construction project task starting times and duration

Author keywords

Construction; Factor analysis; Labor productivity; Variation

Indexed keywords

CONSTRUCTION PROCESS; CONSTRUCTION PROJECT MANAGERS; CONSTRUCTION PROJECTS; CRAFT WORKERS; DETAILED DESIGN; EXTERNAL CONDITIONS; FACTOR ANALYSIS; FIELD MANAGERS; LABOR FORCE; LABOR PRODUCTIVITY; PRODUCTIVITY PERFORMANCE; PROJECT MANAGERS; PROJECT PRODUCTIVITY; REDUCE VARIATION; ROOT CAUSE; SITE CONDITIONS; TIME VARIATIONS; TIME-DIFFERENCES; VARIATION;

EID: 80052786621     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000342     Document Type: Article
Times cited : (93)

References (37)
  • 1
    • 0004011301 scopus 로고    scopus 로고
    • Ph.D. thesis, Dept. of Civil Engineering, Univ. of Birmingham, Birmingham, UK
    • Ballard, G. (2000). The last planner system of production control. Ph.D. thesis, Dept. of Civil Engineering, Univ. of Birmingham, Birmingham, UK.
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 2
    • 0019615171 scopus 로고
    • Work force motivation and productivity on large jobs
    • Borcherding, J., and Garner, D. (1981). Work force motivation and productivity on large jobs. J. Constr. Div. JCCEAZ 0569-7948, 107 (3), 443-453. (Pubitemid 11419057)
    • (1981) Journal of the Construction Division , vol.107 , Issue.3 , pp. 443-453
    • Borcherding, J.1    Garner, D.2
  • 4
    • 60449102494 scopus 로고    scopus 로고
    • Construction craft workers' perceptions of the factors affecting their productivity
    • JCEMD4 0733-9364,. 10.1061/(ASCE)0733-9364(2009)135:3(217)
    • Dai, J., Goodrum, P. M., and Maloney, W. F. (2009). Construction craft workers' perceptions of the factors affecting their productivity. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (3), 217-226. 10.1061/(ASCE)0733-9364(2009) 135:3(217)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.3 , pp. 217-226
    • Dai, J.1    Goodrum, P.M.2    Maloney, W.F.3
  • 5
    • 35448954509 scopus 로고    scopus 로고
    • Twinning motivation, productivity and management strategy in construction projects
    • Doloi, H. (2007). Twinning motivation, productivity and management strategy in construction projects. Eng. Manage. J., 19 (3), 30-40. EMAJEP 0960-7919 (Pubitemid 47617980)
    • (2007) EMJ - Engineering Management Journal , vol.19 , Issue.3 , pp. 30-40
    • Doloi, H.1
  • 7
    • 2342443555 scopus 로고    scopus 로고
    • Partial factor productivity and equipment technology change at activity level in U.S. construction industry
    • DOI 10.1061/(ASCE)0733-9364(2002)128:6(463)
    • Goodrum, P. M., and Hass, C. T. (2002). Partial factor productivity and equipment technology change at activity level in U.S. construction industry. J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (6), 463-472. (Pubitemid 40265510)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.6 , pp. 463-472
    • Goodrum, P.M.1    Haas, C.T.2
  • 8
    • 75649150289 scopus 로고    scopus 로고
    • Qualitative research: Application of the Delphi method to CEM research
    • JCEMD4 0733-9364
    • Hallowell, M. R., and Gambatese, J. A. (2010). Qualitative research: application of the Delphi method to CEM research. J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (1), 99-107.
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.1 , pp. 99-107
    • Hallowell, M.R.1    Gambatese, J.A.2
  • 9
    • 0002209085 scopus 로고
    • Research of factors influencing construction productivity
    • 0144-6193
    • Herbsman, Z., and Ellis, R. (1990). Research of factors influencing construction productivity. Constr. Manage. Econ., 8, 49-61. 0144-6193
    • (1990) Constr. Manage. Econ. , vol.8 , pp. 49-61
    • Herbsman, Z.1    Ellis, R.2
  • 10
    • 0003406531 scopus 로고
    • 3rd Ed., University of Chicago Press, Chicago
    • Harmon, H. H. (1976). Modern factor analysis, 3rd Ed., University of Chicago Press, Chicago.
    • (1976) Modern Factor Analysis
    • Harmon, H.H.1
  • 11
    • 23044488934 scopus 로고    scopus 로고
    • Role of inventory buffers in construction labor performance
    • DOI 10.1061/(ASCE)0733-9364(2005)131:7(834)
    • Horman, M. J., and Thomas, H. R. (2005). Role of inventory buffers in construction labor performance. J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (7), 834-843. (Pubitemid 41068305)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.7 , pp. 834-843
    • Horman, M.J.1    Thomas, H.R.2
  • 12
    • 13944266409 scopus 로고
    • Implementing lean construction: Reducing inflow variation
    • Catolica Universidad de Chile, Santiago, Chile
    • Howell, G. A., and Ballard, G. (1994). Implementing lean construction: Reducing inflow variation. 2nd Annual Conf. on Lean Construction, Catolica Universidad de Chile, Santiago, Chile.
    • (1994) 2nd Annual Conf. on Lean Construction
    • Howell, G.A.1    Ballard, G.2
  • 13
    • 13944253291 scopus 로고    scopus 로고
    • Discussion of Reducing variability to improve performance as a lean construction principle
    • JCEMD4 0733-9364,. 10.1061/(ASCE)0733-9364(2004)130:2(299)
    • Howell, G. A., Ballard, G., Tommelein, I. D., and Koskela, I. (2004). Discussion of Reducing variability to improve performance as a lean construction principle. J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (2), 299-304. 10.1061/(ASCE)0733-9364(2004)130:2(299)
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 299-304
    • Howell, G.A.1    Ballard, G.2    Tommelein, I.D.3    Koskela, I.4
  • 14
    • 34250421484 scopus 로고
    • An index of factorial simplicity
    • 0033-3123,. 10.1007/BF02291575
    • Kaiser, H. F. (1974). An index of factorial simplicity. Psychometrika 0033-3123, 39 (1), 31-36. 10.1007/BF02291575
    • (1974) Psychometrika , vol.39 , Issue.1 , pp. 31-36
    • Kaiser, H.F.1
  • 15
    • 27644475222 scopus 로고    scopus 로고
    • Analysis of variability in precasting and installation of pile foundations
    • (CD ROM), ASCE, Reston,VA, (Aug. 25, 2011)
    • Kaplan, H., Elburg, A., and Tommelein, I. D. (2005). Analysis of variability in precasting and installation of pile foundations. Proc., Construction Research Congr. (CD ROM), ASCE, Reston,VA, http://ascelibrary.org/ proceedings/resource/2/ascecp/183/40754?isAuthorized=no (Aug. 25, 2011).
    • (2005) Proc., Construction Research Congr.
    • Kaplan, H.1    Elburg, A.2    Tommelein, I.D.3
  • 16
    • 0003428742 scopus 로고
    • Sage Univ. Paper Series on Quantitative Applications in Social Sciences, No. 07-013, Sage Publications, Newbury Park, CA
    • Kim, J. O., and Mueller, C. W. (1978). Introduction to factor analysis. Sage Univ. Paper Series on Quantitative Applications in Social Sciences, No. 07-013, Sage Publications, Newbury Park, CA.
    • (1978) Introduction to Factor Analysis
    • Kim, J.O.1    Mueller, C.W.2
  • 17
    • 43949112967 scopus 로고    scopus 로고
    • Discriminant analysis for predicting ranges of cost variance in international construction projects. JCEMD4 0733-9364
    • Kim, D. Y., Han, S. H., and Kim, H. (2008). Discriminant analysis for predicting ranges of cost variance in international construction projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (6), 398-411.
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.6 , pp. 398-411
    • Kim, D.Y.1    Han, S.H.2    Kim, H.3
  • 21
    • 2342445207 scopus 로고    scopus 로고
    • Construction productivity improvement: A study of human, management, and external issues
    • ASCE, Reston, Va
    • Liberda, M., Ruwanpura, J., and Jergeas, G. (2003). Construction productivity improvement: A study of human, management, and external issues. Proc., Construction Research Congr., ASCE, Reston, Va.
    • (2003) Proc., Construction Research Congr.
    • Liberda, M.1    Ruwanpura, J.2    Jergeas, G.3
  • 22
    • 56349139173 scopus 로고    scopus 로고
    • Critical success factors for competitiveness of contractors: China study
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:12(972)
    • Lu, W., Shen, L., and Yam, M. C. H. (2008). Critical success factors for competitiveness of contractors: China study. J. Constr. Eng. Manage., 134 (12), 972-982. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:12(972)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.12 , pp. 972-982
    • Lu, W.1    Shen, L.2    Yam, M.C.H.3
  • 25
    • 0001362287 scopus 로고    scopus 로고
    • Neural network model for estimating construction productivity
    • Portas, J., and AbouRizk, S. (1997). Neural network model for estimating construction productivity. J. Constr. Eng. Manage. JCEMD4 0733-9364, 123 (4), 399-410. 10.1061/(ASCE)0733-9364(1997)123:4(399) (Pubitemid 127590582)
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.4 , pp. 399-410
    • Portas, J.1    AbouRizk, S.2
  • 26
    • 0036140878 scopus 로고    scopus 로고
    • The evidence of complex variability in construction labour productivity
    • DOI 10.1080/01446190110098961
    • Radosavljevic, M., and Horner, R. M. W. (2002). The evidence of complex variability in construction labour productivity. Constr. Manage. Econ., 20, 3-12. 0144-6193 10.1080/01446190110098961 (Pubitemid 34057502)
    • (2002) Construction Management and Economics , vol.20 , Issue.1 , pp. 3-12
    • Radosavljevic, M.1    Horner, R.M.W.2
  • 27
    • 11644292659 scopus 로고    scopus 로고
    • Identifying component variability of end product specification tests
    • Rilett, L. R. (1998). Identifying component variability of end product specification tests. J. Constr. Eng. Manage. JCEMD4 0733-9364, 124 (2), 133-138. 10.1061/(ASCE)0733-9364(1998)124:2(133) (Pubitemid 128586394)
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.2 , pp. 133-138
    • Rilett, L.R.1
  • 28
    • 14744289522 scopus 로고    scopus 로고
    • Labor productivity drivers and opportunities in the construction industry
    • DOI 10.1061/(ASCE)0742-597X(2003)19:2(78)
    • Rojas, M., and Aramvareekul, P. (2003). Labor productivity drivers and opportunities in the construction industry. J. Manage. Eng., 19 (2), 78-82. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2003)19:2(78) (Pubitemid 40329328)
    • (2003) Journal of Management in Engineering , vol.19 , Issue.2 , pp. 78-82
    • Rojas, E.M.1    Aramvareekul, P.2
  • 29
    • 0032206731 scopus 로고    scopus 로고
    • Construction labor productivity modeling with neural networks
    • JCEMD4 0733-9364,. 10.1061/(ASCE)0733-9364(1998)124:6(498)
    • Somnez, R., and Rowlings, J. E. (1998). Construction labor productivity modeling with neural networks. J. Constr. Eng. Manage. JCEMD4 0733-9364, 124 (6), 498-504. 10.1061/(ASCE)0733-9364(1998)124:6(498)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 498-504
    • Somnez, R.1    Rowlings, J.E.2
  • 31
    • 0028396033 scopus 로고
    • Forecasting labor productivity using factor model
    • JCEMD4 0733-9364,. 10.1061/(ASCE)0733-9364(1994)120:1(228)
    • Thomas, H. R., and Sakarcan, A. S. (1994). Forecasting labor productivity using factor model. J. Constr. Eng. Manage. JCEMD4 0733-9364, 120 (1), 228-239. 10.1061/(ASCE)0733-9364(1994)120:1(228)
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.1 , pp. 228-239
    • Thomas, H.R.1    Sakarcan, A.S.2
  • 32
    • 0023559504 scopus 로고
    • Factor model of construction productivity
    • JCEMD4 0733-9364
    • Thomas, H. R., and Yiakoumis, I. (1987). Factor model of construction productivity. J. Constr. Eng. Manage. JCEMD4 0733-9364, 113 (4), 623-639.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.4 , pp. 623-639
    • Thomas, H.R.1    Yiakoumis, I.2
  • 34
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • JCEMD4 0733-9364,. 10.1061/(ASCE)0733-9364(1999)125:5(304)
    • Tommelein, I. D., Riley, D. R., and Howell, G. A. (1999). Parade game: Impact of work flow variability on trade performance. J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (5), 304-310. 10.1061/(ASCE)0733-9364(1999)125:5(304)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.A.3
  • 35
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimates using factor analysis and multivariate regression
    • DOI 10.1061/(ASCE)0733-9364(2003)129:2(198)
    • Trost, S. M., and Oberlender, G. D. (2003). Predicting accuracy of early cost estimates using factor analysis and multivariate regression. J. Constr. Eng. Manage. JCEMD4 0733-9364, 129, 198-204. 10.1061/(ASCE)0733-9364(2003)129: 2(198) (Pubitemid 40265489)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.2 , pp. 198-204
    • Trost, S.M.1    Oberlender, G.D.2
  • 36
    • 13944255098 scopus 로고    scopus 로고
    • Quantitative assessment for piles productivity factors. JCEMD4 0733-9364
    • Zayed, T. M., and Halpin, D. W. (2004). Quantitative assessment for piles productivity factors. J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (3), 405-414.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.3 , pp. 405-414
    • Zayed, T.M.1    Halpin, D.W.2
  • 37
    • 33747345626 scopus 로고    scopus 로고
    • Factor analysis of public clients' best-value objective in public-Privately partnered infrastructure projects
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:9(956)
    • Zhang, X. (2006). Factor analysis of public clients' best-value objective in public-Privately partnered infrastructure projects. J. Constr. Eng. Manage., 132 (9), 956-965. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:9(956)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.9 , pp. 956-965
    • Zhang, X.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.