-
1
-
-
0037366641
-
Value stream analysis of a re-engineered construction supply chain
-
Arbulu, R., Tommelein, I., Walsh, K., and Hershauer, J. (2002a). "Value stream analysis of a re-engineered construction supply chain." Building Research and Information, 31(2), 161-171.
-
(2002)
Building Research and Information
, vol.31
, Issue.2
, pp. 161-171
-
-
Arbulu, R.1
Tommelein, I.2
Walsh, K.3
Hershauer, J.4
-
2
-
-
0036932457
-
Contributors to lead time in construction supply chains: Case of pipe supports used in power plants
-
San Diego, CA
-
Arbulu, R.J., Tommelein, I.D., Walsh, K.D., and Hershauer, J.C. (2002b). "Contributors to Lead Time in Construction Supply Chains: Case of Pipe Supports Used In Power Plants." Proc. 2002 Winter Sim. Conf., San Diego, CA, 1745-1751.
-
(2002)
Proc. 2002 Winter Sim. Conf.
, pp. 1745-1751
-
-
Arbulu, R.J.1
Tommelein, I.D.2
Walsh, K.D.3
Hershauer, J.C.4
-
4
-
-
67650208100
-
-
visited May 12, 2008
-
Cochrane (2008). "The Cochrane Collaboration." 〈http://www.cochrane.org/〉 visited May 12, 2008
-
(2008)
The Cochrane Collaboration
-
-
-
5
-
-
0034688387
-
Quantifying benefits of conversion to lean manufacturing with discrete event simulation: A case study
-
DOI 10.1080/002075400189509
-
Detty, R.B. and Yingling, J.C. (2000). "Quantifying benefits of conversion to lean manufacturing with discrete event simulation: a case study." International Journal of Production Research, 38(2), 429-445. (Pubitemid 35395485)
-
(2000)
International Journal of Production Research
, vol.38
, Issue.2
, pp. 429-445
-
-
Detty, R.B.1
Yingling, J.C.2
-
6
-
-
84986024678
-
Dynamic simulation modelling for lean logistics
-
Disney, S.M., Naim, M.M., and Towill, D.R. (1997). "Dynamic simulation modelling for lean logistics." Int'l. J. Phys. Distr. & Logistics Mgmt., 27(3/4), 174-196.
-
(1997)
Int'L. J. Phys. Distr. & Logistics Mgmt.
, vol.27
, Issue.3-4
, pp. 174-196
-
-
Disney, S.M.1
Naim, M.M.2
Towill, D.R.3
-
7
-
-
84986142805
-
Generic implementation of lean concepts in simulation models
-
Farrar, J.M., AbouRizk, S.M., and Mao, X. (2004). "Generic Implementation of Lean Concepts in Simulation Models." Lean Constr. J., 1 (1) 1-23.
-
(2004)
Lean Constr. J.
, vol.1
, Issue.1
, pp. 1-23
-
-
Farrar, J.M.1
Abourizk, S.M.2
Mao, X.3
-
9
-
-
84866126106
-
Case study of the implementation of the Lean Project Delivery System (LPDS) using virtual building technologies on a large healthcare project
-
Sydney, Australia
-
Khanzode, A., Fischer, M., and Reed, D. (2005). "Case Study of the Implementation of the Lean Project Delivery System (LPDS) Using Virtual Building Technologies on a Large Healthcare Project." Proc. IGLC-13, Sydney, Australia, 153-160.
-
(2005)
Proc. IGLC-13
, pp. 153-160
-
-
Khanzode, A.1
Fischer, M.2
Reed, D.3
-
10
-
-
84856650538
-
A subcontractor's lean journey: A case study on Ilyang
-
East Lansing, Michigan, USA
-
Kim, Y.-W., Jang, J.W., and Ballard, G. (2007). "A Subcontractor's Lean Journey: A Case Study on Ilyang." Proc. IGLC-15, East Lansing, Michigan, USA, 135-140.
-
(2007)
Proc. IGLC-15
, pp. 135-140
-
-
Kim, Y.-W.1
Jang, J.W.2
Ballard, G.3
-
11
-
-
84855826727
-
Return on investment in construction innovation-a lean construction case study
-
Sydney, Australia
-
Koerckel, A. and Ballard, G. (2005). "Return on Investment in Construction Innovation-A Lean Construction Case Study." Proc. IGLC-13, Sydney, Australia, 91-98.
-
(2005)
Proc. IGLC-13
, pp. 91-98
-
-
Koerckel, A.1
Ballard, G.2
-
15
-
-
0035705781
-
EZStrobe - General-purpose simulation system based on activity cycle diagrams
-
Martinez, J.C. (2001). "EZStrobe - General-purpose Simulation System Based on Activity Cycle Diagrams." Proc. Winter Sim. Conf., 1556-1564. (Pubitemid 34125029)
-
(2001)
Winter Simulation Conference Proceedings
, vol.2
, pp. 1556-1564
-
-
Martinez, J.C.1
-
16
-
-
0032677122
-
General-purpose systems for effective construction simulation
-
Martinez, J.C. and Ioannou, P.G. (1999). "General-Purpose Systems for Effective Construction Simulation." Journal of Construction Engineering and Management, ASCE, 125(4), 265-276.
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.125
, Issue.4
, pp. 265-276
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
17
-
-
0003474204
-
-
2nd Ed., Lawrence Erlbaum Assoc. Pubs., Mahwah, NJ
-
Myers, J.L. and Well, A.D. (2003). Research Design and Statistical Analysis. 2nd Ed., Lawrence Erlbaum Assoc. Pubs., Mahwah, NJ.
-
(2003)
Research Design and Statistical Analysis
-
-
Myers, J.L.1
Well, A.D.2
-
18
-
-
84856655328
-
Value stream mapping in construction: A case study in brazilian construction company
-
Sydney, Australia
-
Pasqualini, F. and Zawislak, P.A. (2005). "Value Stream Mapping in Construction: A Case Study in Brazilian Construction Company." Proc. IGLC-13, Sydney, Australia, 117-125.
-
(2005)
Proc. IGLC-13
, pp. 117-125
-
-
Pasqualini, F.1
Zawislak, P.A.2
-
19
-
-
33748157247
-
Pull-driven construction of high-rise apartment buildings
-
Sydney, Australia
-
Sacks, R., Goldin, M., and Derin, Z. (2005) "Pull-Driven Construction of High-Rise Apartment Buildings." Proc. IGLC-13, Sydney, Australia, 217-226.
-
(2005)
Proc. IGLC-13
, pp. 217-226
-
-
Sacks, R.1
Goldin, M.2
Derin, Z.3
-
20
-
-
34247224920
-
LEAPCON: Simulation of lean construction of high-rise apartment buildings
-
DOI 10.1061/(ASCE)0733-9364(2007)133:7(529)
-
Sacks, R., Esquenazi, A., and Goldin, M. (2007). "LEAPCON: Simulation of Lean Construction of High-Rise Apartment Buildings." Journal of Construction Engineering and Management, ASCE, 133(7), 529-539. (Pubitemid 46935016)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.7
, pp. 529-539
-
-
Sacks, R.1
Esquenazi, A.2
Goldin, M.3
-
21
-
-
33748795375
-
Lean construction: From theory to implementation
-
DOI 10.1061/(ASCE)0742-597X(2006)22:4(168)
-
Salem, O., Solomon, H., Genaidy, A., and Minkarah, I. (2006). "Lean Construction: From Theory to Implementation." J. of Mgmt. in Engrg., ASCE, 22(4), 168-175. (Pubitemid 44410243)
-
(2006)
Journal of Management in Engineering
, vol.22
, Issue.4
, pp. 168-175
-
-
Salem, O.1
Solomon, J.2
Genaidy, A.3
Minkarah, I.4
-
22
-
-
0027849685
-
Collaborative worldwide overviews of randomized trials
-
Warren, K.S. and F. Mosteller (eds.) New York Acad. of Sci., NY
-
Sandercock, P. (1993). "Collaborative worldwide overviews of randomized trials." In:Doing More Good than Harm: The Evaluation of Health Care Interventions, Warren, K.S. and F. Mosteller (eds.) New York Acad. of Sci., NY, 149-154.
-
(1993)
Doing More Good Than Harm: The Evaluation of Health Care Interventions
, pp. 149-154
-
-
Sandercock, P.1
-
23
-
-
34247263892
-
A case study of line-of-balance based schedule planning and control system
-
Sydney, Austr.
-
Seppanen, O. and Aalto, E. (2005). "A Case Study of Line-of-Balance Based Schedule Planning and Control System." Proc. IGLC-13, Sydney, Austr., 271-279.
-
(2005)
Proc. IGLC-13
, pp. 271-279
-
-
Seppanen, O.1
Aalto, E.2
-
24
-
-
84856633500
-
Industrialization in Swedish bridge engineering: A case study of lean construction
-
East Lansing, Michigan, USA
-
Simonsson, P. and Emborg, M. (2007). "Industrialization in Swedish Bridge Engineering: A Case Study of Lean Construction." Proc. IGLC-15, East Lansing, Michigan, USA, 244-253.
-
(2007)
Proc. IGLC-15
, pp. 244-253
-
-
Simonsson, P.1
Emborg, M.2
-
25
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: Simulation of lean construction technique
-
Tommelein, I.D. (1998). "Pull-driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique." Journal of Construction Engineering and Management, ASCE, 124(4), 279-288. (Pubitemid 128588950)
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
26
-
-
47249157955
-
Lean construction experiments using discrete-event simulation: Techniques and tools for process re-engineering?
-
Tommelein, I.D. (1999). "Lean Construction Experiments using Discrete-event Simulation: Techniques and Tools for Process Re-engineering? " Int'l. Journal of Computer-Integrated Design and Construction, CIDAC, Special Issue on Construction Process Re-engineering, 1(2), 53-63.
-
(1999)
Int'L. Journal of Computer-Integrated Design and Construction, CIDAC, Special Issue on Construction Process Re-engineering
, vol.1
, Issue.2
, pp. 53-63
-
-
Tommelein, I.D.1
-
27
-
-
84855810709
-
Process benefits from use of standard products - Simulation experiments using the pipe spool model
-
25-27 July, Santiago, Chile
-
Tommelein, I.D. (2006). "Process Benefits from Use of Standard Products - Simulation Experiments using the Pipe Spool Model." Proc. IGLC-14, 25-27 July, Santiago, Chile, 177-189.
-
(2006)
Proc. IGLC-14
, pp. 177-189
-
-
Tommelein, I.D.1
-
28
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I.D., Riley, D.R., and Howell, G.A. (1999). "Parade Game: Impact of Work Flow Variability on Trade Performance." Journal of Construction Engineering and Management, ASCE, 125(5), 304-310.
-
(1999)
Journal of Construction Engineering and Management, ASCE
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.A.3
-
29
-
-
39449103484
-
Interventions for preventing injuries in the construction industry
-
DOI 10.1002/14651858.CD006251.pub2
-
van der Molen, H.F., Lehtola, M.M., Lappalainen, J, Hoonakker, P.L.T., Hsiao, H., Haslam, R., and Hale, A.R., and Verbeek, J. (2007). "Interventions for preventing injuries in the construction industry (Review)." COCHRANE DATABASE OF SYSTEMATIC REVIEWS, Issue 4. Art. No.: CD006251. DOI: 10.1002/14651858.CD006251.pub2. (Pubitemid 351805266)
-
(2007)
Cochrane Database of Systematic Reviews
, Issue.4
-
-
Van Der Molen, H.F.1
Lehtola, M.M.2
Lappalainen, J.3
Hoonakker, P.L.T.4
Hsiao, H.5
Haslam, R.6
Hale, A.R.7
Verbeek, J.8
-
31
-
-
84856639353
-
Lean zone production methodologies
-
Visionary Products Inc. Forth Worth, Texas
-
Visionary Products Inc. (2007). "Lean Zone Production Methodologies ["Airplane Game" Instruction Manual]." Forth Worth, Texas.
-
(2007)
Airplane Game" Instruction Manual
-
-
|