메뉴 건너뛰기




Volumn 12, Issue 1, 2012, Pages 440-452

The periodicity and robustness in a single-track train scheduling problem

Author keywords

Cyclic timetables; Periodic event scheduling problem; Robust timetables; Simulated annealing; Train scheduling

Indexed keywords

ACCELERATION AND DECELERATION; CYCLIC TIMETABLES; FUZZY APPROACH; JOB-SHOP SCHEDULING; LARGE-SCALE PROBLEM; META HEURISTIC ALGORITHM; MINIMUM DELAY; NUMERICAL EXAMPLE; OPERATING PROBLEMS; PERIODIC EVENT SCHEDULING PROBLEM; PERIODIC EVENT SCHEDULING PROBLEMS; RAILWAY INDUSTRY; RAILWAY TRACK; RESEARCH TOPICS; ROBUST SOLUTIONS; ROBUST TIMETABLES; ROBUSTNESS MEASURES; TIME INTERVAL; TRAIN DELAY; TRAIN SCHEDULING; TRAIN TIMETABLES;

EID: 81155155628     PISSN: 15684946     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.asoc.2011.08.026     Document Type: Article
Times cited : (35)

References (36)
  • 2
    • 77649271726 scopus 로고    scopus 로고
    • Stochastic optimization model and solution algorithm for robust double-track train timetabling problem
    • M. Babar Khan, and X. Zhou Stochastic optimization model and solution algorithm for robust double-track train timetabling problem IEEE Transactions on Intelligent Transportation Systems 11 1 2010 81 89
    • (2010) IEEE Transactions on Intelligent Transportation Systems , vol.11 , Issue.1 , pp. 81-89
    • Babar Khan, M.1    Zhou, X.2
  • 3
    • 43949092779 scopus 로고    scopus 로고
    • A column generation approach to train timetabling on a corridor
    • V. Cacchiani, A. Caprara, and P. Toth A column generation approach to train timetabling on a corridor 4OR 6 2008 125 142
    • (2008) 4OR , vol.6 , pp. 125-142
    • Cacchiani, V.1    Caprara, A.2    Toth, P.3
  • 4
    • 33644594453 scopus 로고    scopus 로고
    • A Lagrangian heuristic algorithm for a real-world train timetabling problem
    • A. Caprara, M. Monaci, P. Toth, and P.L. Guida A Lagrangian heuristic algorithm for a real-world train timetabling problem Discrete Applied Mathematics 154 2006 738 753
    • (2006) Discrete Applied Mathematics , vol.154 , pp. 738-753
    • Caprara, A.1    Monaci, M.2    Toth, P.3    Guida, P.L.4
  • 6
    • 34249982545 scopus 로고    scopus 로고
    • A branch and bound algorithm for scheduling trains in a railway network
    • DOI 10.1016/j.ejor.2006.10.034, PII S0377221706010678
    • D'Ariano, D. Pacciarelli, and M. Pranzo A branch and bound algorithm for scheduling trains in a railway network European Journal of Operational Research 183 2007 643 657 (Pubitemid 46891151)
    • (2007) European Journal of Operational Research , vol.183 , Issue.2 , pp. 643-657
    • D'Ariano, A.1    Pacciarelli, D.2    Pranzo, M.3
  • 7
    • 77956330125 scopus 로고    scopus 로고
    • Light robustness, robust and online large-scale optimization
    • M. Fischetti, and M. Monaci Light robustness, robust and online large-scale optimization Lecture Notes in Computer Science 5868 2009 61 84
    • (2009) Lecture Notes in Computer Science , vol.5868 , pp. 61-84
    • Fischetti, M.1    Monaci, M.2
  • 8
    • 70449640336 scopus 로고    scopus 로고
    • Fast approaches to improve the robustness of a railway timetable
    • M. Fischetti, D. Salvagnin, and A. Zanette Fast approaches to improve the robustness of a railway timetable Transportation Science 43 2008 321 335
    • (2008) Transportation Science , vol.43 , pp. 321-335
    • Fischetti, M.1    Salvagnin, D.2    Zanette, A.3
  • 11
    • 70350105167 scopus 로고    scopus 로고
    • A hybrid genetic algorithm for multi-depot homogenous locomotive assignment with time windows
    • K. Ghoseiri, and S.F. Ghannadpour A hybrid genetic algorithm for multi-depot homogenous locomotive assignment with time windows Applied Soft Computing 10 2010 53 65
    • (2010) Applied Soft Computing , vol.10 , pp. 53-65
    • Ghoseiri, K.1    Ghannadpour, S.F.2
  • 15
    • 33748698838 scopus 로고    scopus 로고
    • A traffic management system for real-time traffic optimisation in railways
    • DOI 10.1016/j.trb.2006.02.005, PII S0191261506000245
    • M. Mazzarello, and E. Ottaviani A traffic management system for real-time traffic optimisation in railways Transportation Research: Part B 41 2007 246 274 (Pubitemid 44391252)
    • (2007) Transportation Research Part B: Methodological , vol.41 , Issue.2 , pp. 246-274
    • Mazzarello, M.1    Ottaviani, E.2
  • 16
    • 67349164024 scopus 로고    scopus 로고
    • Real-time scheduling of periodic tasks with processing times and deadlines as parametric fuzzy numbers
    • P.K. Muhuri, and K.K. Shukla Real-time scheduling of periodic tasks with processing times and deadlines as parametric fuzzy numbers Applied Soft Computing 9 2009 936 946
    • (2009) Applied Soft Computing , vol.9 , pp. 936-946
    • Muhuri, P.K.1    Shukla, K.K.2
  • 17
    • 34548478816 scopus 로고    scopus 로고
    • Real-time task scheduling with fuzzy uncertainty in processing times and deadlines
    • DOI 10.1016/j.asoc.2006.06.006, PII S1568494606000597
    • P.K. Muhuri, and K.K. Shukla Real-time task scheduling with fuzzy uncertainty in processing times and deadlines Applied Soft Computing 8 2008 1 13 (Pubitemid 47374544)
    • (2008) Applied Soft Computing Journal , vol.8 , Issue.1 , pp. 1-13
    • Muhuri, P.K.1    Shukla, K.K.2
  • 18
    • 77649235917 scopus 로고    scopus 로고
    • A high performing metaheuristic for job shop scheduling with sequence-dependent setup times
    • B. Naderi, S.M.T. Fatemi Ghomi, and M. Aminnayeri A high performing metaheuristic for job shop scheduling with sequence-dependent setup times Applied Soft Computing 10 3 2010 703 710
    • (2010) Applied Soft Computing , vol.10 , Issue.3 , pp. 703-710
    • Naderi, B.1    Fatemi Ghomi, S.M.T.2    Aminnayeri, M.3
  • 19
    • 29144470142 scopus 로고    scopus 로고
    • Generation of classes of robust periodic railway timetables
    • DOI 10.1016/j.cor.2005.02.004, PII S0305054805000511
    • M.A. Odijk, H.E. Romeijn, and H.V. Maaren Generation of classes of robust periodic railway timetables Computers & Operations Research 33 2006 2283 2299 (Pubitemid 41802290)
    • (2006) Computers and Operations Research , vol.33 , Issue.8 , pp. 2283-2299
    • Odijk, M.A.1    Romeijn, H.E.2    Van Maaren, H.3
  • 21
    • 0032884348 scopus 로고    scopus 로고
    • Railway traffic control and train scheduling based on inter-train conflict management
    • DOI 10.1016/S0191-2615(99)00004-1
    • Sahin Railway traffic control and train scheduling based on inter-train conflict management Transportation Research Part B 33 1999 511 534 (Pubitemid 29424947)
    • (1999) Transportation Research Part B: Methodological , vol.33 , Issue.7 , pp. 511-534
    • Sahin, I.1
  • 24
    • 0008917539 scopus 로고
    • A mathematical model for periodic scheduling problems
    • P. Serafini, and W. Ukovich A mathematical model for periodic scheduling problems SIAM Journal of Discrete Mathematics 2 4 1989 550 581
    • (1989) SIAM Journal of Discrete Mathematics , vol.2 , Issue.4 , pp. 550-581
    • Serafini, P.1    Ukovich, W.2
  • 28
    • 77649231616 scopus 로고    scopus 로고
    • The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem
    • R. Tavakkoli-Moghaddam, B. Javadi, F. Jolai, and A. Ghodratnama The use of a fuzzy multi-objective linear programming for solving a multi-objective single-machine scheduling problem Applied Soft Computing 10 2010 919 925
    • (2010) Applied Soft Computing , vol.10 , pp. 919-925
    • Tavakkoli-Moghaddam, R.1    Javadi, B.2    Jolai, F.3    Ghodratnama, A.4
  • 29
    • 33845266135 scopus 로고    scopus 로고
    • N-tracked railway traffic re-scheduling during disturbances
    • DOI 10.1016/j.trb.2006.06.001, PII S0191261506000749
    • J. Tornquist, and J.A. Persson N-tracked railway traffic re-scheduling during disturbances Transportation Research: Part B 41 2007 342 362 (Pubitemid 44858115)
    • (2007) Transportation Research Part B: Methodological , vol.41 , Issue.3 , pp. 342-362
    • Tornquist, J.1    Persson, J.A.2
  • 32
    • 10644237939 scopus 로고    scopus 로고
    • Simultaneous disruption recovery of a train timetable and crew roster in real time
    • C.G. Walker, J.N. Snowdon, and D.M. Ryan Simultaneous disruption recovery of a train timetable and crew roster in real time Computers & Operations Research 32 8 2005 2077 2094
    • (2005) Computers & Operations Research , vol.32 , Issue.8 , pp. 2077-2094
    • Walker, C.G.1    Snowdon, J.N.2    Ryan, D.M.3
  • 33
    • 70350113814 scopus 로고    scopus 로고
    • A hybrid immune simulated annealing algorithm for the job shop scheduling problem
    • R. Zhang, and C. Wu A hybrid immune simulated annealing algorithm for the job shop scheduling problem Applied Soft Computing 10 2010 79 89
    • (2010) Applied Soft Computing , vol.10 , pp. 79-89
    • Zhang, R.1    Wu, C.2
  • 34
    • 33845274298 scopus 로고    scopus 로고
    • Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds
    • DOI 10.1016/j.trb.2006.05.003, PII S0191261506000737
    • X. Zhou, and M. Zhong Single-track train timetabling with guaranteed optimality: branch-and-bound algorithms with enhanced lower bounds Transportation Research: Part B 41 2007 320 341 (Pubitemid 44858114)
    • (2007) Transportation Research Part B: Methodological , vol.41 , Issue.3 , pp. 320-341
    • Zhou, X.1    Zhong, M.2
  • 35
    • 13544267417 scopus 로고    scopus 로고
    • Bicriteria train scheduling for high-speed passenger railroad planning applications
    • DOI 10.1016/j.ejor.2004.07.019, PII S037722170400476X, Multicriteria Scheduling
    • X. Zhou, and M. Zhong Bicriteria train scheduling for high-speed passenger railroad planning applications European Journal of Operational Research 167 2005 752 771 (Pubitemid 40220089)
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 752-771
    • Zhou, X.1    Zhong, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.