-
1
-
-
0020928342
-
An optimal rescheduling for online train traffic control in disturber situations
-
S. Araya, K. Abe, An optimal rescheduling for online train traffic control in disturber situations, Proc. 22nd IEEE Conf. on Decision and Control (1983) 489-494.
-
(1983)
Proc. 22nd IEEE Conf. on Decision and Control
, pp. 489-494
-
-
Araya, S.1
Abe, K.2
-
3
-
-
0022614361
-
An expert-system approach to industrial job-shop scheduling
-
E. Bensana, M. Correge, G. Bel, D. Dubois, An expert-system approach to industrial job-shop scheduling, Proc. IEEE Intl. Conf. on Robotics and Applications (1986) 1645-1650.
-
(1986)
Proc. IEEE Intl. Conf. on Robotics and Applications
, pp. 1645-1650
-
-
Bensana, E.1
Correge, M.2
Bel, G.3
Dubois, D.4
-
7
-
-
0030188989
-
Repair-based railway scheduling system with cycle detection
-
July
-
T.W. Chiang, H.Y. Hau, Repair-based railway scheduling system with cycle detection, IEICE Trans. Inf. & Syst. E79-D(7) (July 1996) 973-979.
-
(1996)
IEICE Trans. Inf. & Syst.
, vol.E79-D
, Issue.7
, pp. 973-979
-
-
Chiang, T.W.1
Hau, H.Y.2
-
8
-
-
0023995303
-
SONIA: a knowledge-based scheduling system
-
A. Collinot, C.L. Pape, G. Pinoteau, SONIA: a knowledge-based scheduling system, Artif. Intell. in Engrg. 3(2) (1988) 86-92.
-
(1988)
Artif. Intell. in Engrg.
, vol.3
, Issue.2
, pp. 86-92
-
-
Collinot, A.1
Pape, C.L.2
Pinoteau, G.3
-
9
-
-
0019009394
-
A methodology for generation of optimal schedules for an underground railway system
-
April
-
J.E. Cury, F.A.C. Gomide, M.J. Mendes, A methodology for generation of optimal schedules for an underground railway system, IEEE Trans. on Automatic Control, AC-25(2) (April 1980) 217-222.
-
(1980)
IEEE Trans. on Automatic Control
, vol.AC-25
, Issue.2
, pp. 217-222
-
-
Cury, J.E.1
Gomide, F.A.C.2
Mendes, M.J.3
-
10
-
-
0028413489
-
Scheduling products with bills of materials using an improved Lagrangian relaxation technique
-
C.S. Czerwinski, P.B. Luh, Scheduling products with bills of materials using an improved Lagrangian relaxation technique, IEEE Trans. on Robotics and Automation 10(2) (1994) 99-111.
-
(1994)
IEEE Trans. on Robotics and Automation
, vol.10
, Issue.2
, pp. 99-111
-
-
Czerwinski, C.S.1
Luh, P.B.2
-
11
-
-
0029338877
-
Dependable reactive event-oriented planning
-
J. Dorn, Dependable reactive event-oriented planning, Data & Knowledge Engrg. 16 (1995) 27-49.
-
(1995)
Data & Knowledge Engrg.
, vol.16
, pp. 27-49
-
-
Dorn, J.1
-
13
-
-
84982522109
-
ISIS - A knowledge-based system for factory scheduling
-
M.S. Fox, S.F. Smith, ISIS - A knowledge-based system for factory scheduling, EXPERT SYSTEMS 1(1) (1984) 25-49.
-
(1984)
EXPERT SYSTEMS
, vol.1
, Issue.1
, pp. 25-49
-
-
Fox, M.S.1
Smith, S.F.2
-
15
-
-
0004234888
-
Knowledge-based technology for controlling railway stations
-
B. Fringuelli, Knowledge-based technology for controlling railway stations, IEEE EXPERT (1992) 45-52.
-
(1992)
IEEE EXPERT
, pp. 45-52
-
-
Fringuelli, B.1
-
16
-
-
0023314948
-
Fundamental algorithm for train scheduling based on artificial intelligence
-
K. Fukumori, H. Sano, Fundamental algorithm for train scheduling based on artificial intelligence, Systems and Computers in Japan 18(3) (1987) 52-63.
-
(1987)
Systems and Computers in Japan
, vol.18
, Issue.3
, pp. 52-63
-
-
Fukumori, K.1
Sano, H.2
-
18
-
-
0027632544
-
Local search for satisfiability (SAT) problem
-
J. Gu, Local search for satisfiability (SAT) problem, IEEE Trans. on. Systems, Man, and Cybernetics 23(4) (1993) 1108-1129.
-
(1993)
IEEE Trans. On. Systems, Man, and Cybernetics
, vol.23
, Issue.4
, pp. 1108-1129
-
-
Gu, J.1
-
19
-
-
0025742409
-
Issues in the design of ai-based schedules: a workshop report
-
Jan.
-
K. Kempf, C.L. Pape, S.F. Simth, B.R. Fox, Issues in the design of ai-based schedules: a workshop report, AI Magazine (Jan. 1991) 37-55.
-
(1991)
AI Magazine
, pp. 37-55
-
-
Kempf, K.1
Pape, C.L.2
Simth, S.F.3
Fox, B.R.4
-
20
-
-
0346219551
-
A knowledge-based approach for railway scheduling
-
K. Komaya, T. Fukuda, A knowledge-based approach for railway scheduling, Proc. CAIA (1991) 405-411.
-
(1991)
Proc. CAIA
, pp. 405-411
-
-
Komaya, K.1
Fukuda, T.2
-
21
-
-
0025503499
-
Railcar distribution at the French railways
-
Oct.
-
P. Lévine and J.C. Pornerol, Railcar distribution at the French railways, IEEE EXPERT (Oct. 1990) 61-69.
-
(1990)
IEEE EXPERT
, pp. 61-69
-
-
Lévine, P.1
Pornerol, J.C.2
-
24
-
-
44049112032
-
Minimizing conflicts: a heuristic repair method for constraint satisfaction and scheduling problems
-
S. Minton, M.D. Johnston, A.B. Philips, P. Laird, Minimizing conflicts: a heuristic repair method for constraint satisfaction and scheduling problems, Artificial Intelligence 58 (1992) 161-205.
-
(1992)
Artificial Intelligence
, vol.58
, pp. 161-205
-
-
Minton, S.1
Johnston, M.D.2
Philips, A.B.3
Laird, P.4
-
25
-
-
0026172827
-
Knowledge-based approaches for scheduling problems: a survey
-
June
-
S.J. Noronha, V.V.S. Sarma, Knowledge-based approaches for scheduling problems: a survey, IEEE Trans. on Knowledge and Data Engrg. 3(2) (June 1991) 160-171.
-
(1991)
IEEE Trans. on Knowledge and Data Engrg.
, vol.3
, Issue.2
, pp. 160-171
-
-
Noronha, S.J.1
Sarma, V.V.S.2
-
26
-
-
0024112269
-
A recent survey of production scheduling
-
F.A. Rodammer, K.P. White, Jr., A recent survey of production scheduling, IEEE Trans. on Systems, Man, and Cybernetics 18(6) (1989) 841-851.
-
(1989)
IEEE Trans. on Systems, Man, and Cybernetics
, vol.18
, Issue.6
, pp. 841-851
-
-
Rodammer, F.A.1
White K.P., Jr.2
-
27
-
-
0022128445
-
An expert system for a resource allocation problem
-
J.R. Slagle, H. Hamburger, An expert system for a resource allocation problem, Communication of ACM 28(9) (1985) 994-1004.
-
(1985)
Communication of ACM
, vol.28
, Issue.9
, pp. 994-1004
-
-
Slagle, J.R.1
Hamburger, H.2
-
28
-
-
0017544789
-
Forward reasoning and dependency-directed backtracking in a system for computer-aided circuit analysis
-
R.M. Stallman, G. J. Sussman, Forward reasoning and dependency-directed backtracking in a system for computer-aided circuit analysis, Artificial Intelligence (1977) 135-196.
-
(1977)
Artificial Intelligence
, pp. 135-196
-
-
Stallman, R.M.1
Sussman, G.J.2
-
29
-
-
0024124003
-
A knowledge-based interactive train scheduling system - Aiming at large-scale complex planning systems
-
S. Tsuruta, K. Matsumoto, A knowledge-based interactive train scheduling system - aiming at large-scale complex planning systems, Proc. Intl. Workshop on Artifi. Intell. for Indus. Appl. (1988) 490-495.
-
(1988)
Proc. Intl. Workshop on Artifi. Intell. for Indus. Appl.
, pp. 490-495
-
-
Tsuruta, S.1
Matsumoto, K.2
-
31
-
-
0027700624
-
Scheduling and rescheduling with iterative repair
-
M. Zweben, E. Davis, B. Daun, M.J. Deale, Scheduling and rescheduling with iterative repair, IEEE Trans. on Systems, Man, and Cybernetics 23(6) (1993) 1588-1596.
-
(1993)
IEEE Trans. on Systems, Man, and Cybernetics
, vol.23
, Issue.6
, pp. 1588-1596
-
-
Zweben, M.1
Davis, E.2
Daun, B.3
Deale, M.J.4
|