-
2
-
-
84946638733
-
Application of the logistic function to bio-assay
-
Berkson J. Application of the logistic function to bio-assay. Journal of the American Statistical Association 1944, 39(227):357-365.
-
(1944)
Journal of the American Statistical Association
, vol.39
, Issue.227
, pp. 357-365
-
-
Berkson, J.1
-
3
-
-
78650083580
-
-
in press. Periodic railway timetabling with event flexibility. Networks.
-
Caimi, G., Fuchsberger, M., Laumanns, M., Schüpbach, K., in press. Periodic railway timetabling with event flexibility. Networks, doi:10.1002/net.20379.
-
-
-
Caimi, G.1
Fuchsberger, M.2
Laumanns, M.3
Schüpbach, K.4
-
4
-
-
85029870963
-
The periodic service intention as a conceptual frame for generating timetables with partial periodicity
-
Proceedings of the 3rd International Seminar on Railway Operations Research (ISROR). Zurich, Switzerland (February 11-13).
-
Caimi, G., Laumanns, M., Schüpbach, K., Wörner, S., Fuchsberger, M., 2009. The periodic service intention as a conceptual frame for generating timetables with partial periodicity. In: Proceedings of the 3rd International Seminar on Railway Operations Research (ISROR). Zurich, Switzerland (February 11-13).
-
(2009)
-
-
Caimi, G.1
Laumanns, M.2
Schüpbach, K.3
Wörner, S.4
Fuchsberger, M.5
-
5
-
-
77950601830
-
Passenger railway optimization
-
Elsevier, (Chapter 3)
-
Caprara A., Kroon L., Monaci M., Peeters M., Toth P. Passenger railway optimization. Transportation of Handbooks in Operations Research & Management Science 2007, vol. 14:129-187. Elsevier, (Chapter 3).
-
(2007)
Transportation of Handbooks in Operations Research & Management Science
, vol.14
, pp. 129-187
-
-
Caprara, A.1
Kroon, L.2
Monaci, M.3
Peeters, M.4
Toth, P.5
-
6
-
-
85029832761
-
-
Delay management with re-routing of passengers. In: Clausen, J., Stefano, G.D. (Eds.), Proceedings of the 9th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems (ATMOS 2009). Copenhagen, Denmark (September 10).
-
Dollevoet, T., Huisman, D., Schmidt, M., Schöbel, A., 2009. Delay management with re-routing of passengers. In: Clausen, J., Stefano, G.D. (Eds.), Proceedings of the 9th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems (ATMOS 2009). Copenhagen, Denmark (September 10).
-
(2009)
-
-
Dollevoet, T.1
Huisman, D.2
Schmidt, M.3
Schöbel, A.4
-
8
-
-
0039444428
-
Decision support systems support the search for win-win solutions in railway network design
-
Hooghiemstra J., Kroon L., Odijk M., Salomon M., Zwaneveld P. Decision support systems support the search for win-win solutions in railway network design. Interfaces 1999, 29(2):15-32.
-
(1999)
Interfaces
, vol.29
, Issue.2
, pp. 15-32
-
-
Hooghiemstra, J.1
Kroon, L.2
Odijk, M.3
Salomon, M.4
Zwaneveld, P.5
-
9
-
-
44249083296
-
Stochastic improvement of cyclic railway timetables
-
Kroon L., Maróti G., Helmrich M.R., Vromans M., Dekker R. Stochastic improvement of cyclic railway timetables. Transportation Research Part B 2008, 42(6):553-570.
-
(2008)
Transportation Research Part B
, vol.42
, Issue.6
, pp. 553-570
-
-
Kroon, L.1
Maróti, G.2
Helmrich, M.R.3
Vromans, M.4
Dekker, R.5
-
10
-
-
0043207353
-
A variable trip time model for cyclic railway timetabling
-
Kroon L., Peeters L. A variable trip time model for cyclic railway timetabling. Transportation Science 2003, 37(2):198-212.
-
(2003)
Transportation Science
, vol.37
, Issue.2
, pp. 198-212
-
-
Kroon, L.1
Peeters, L.2
-
11
-
-
18944387053
-
Symmetry for periodic railway timetables
-
Elsevier, Budapest, Hungary, (September 15-20), B. Gerards (Ed.) Algorithmic Methods and Models for Optimization of Railways (ATMOS 2003)
-
Liebchen C. Symmetry for periodic railway timetables. Electronic Notes in Theoretical Computer Science 2002, vol. 92:1-103. Elsevier, Budapest, Hungary, (September 15-20). B. Gerards (Ed.).
-
(2002)
Electronic Notes in Theoretical Computer Science
, vol.92
, pp. 1-103
-
-
Liebchen, C.1
-
12
-
-
18944407379
-
A case study in periodic timetabling
-
Elsevier, Malaga, Spain, (July 7-13), D. Wagner (Ed.) Algorithmic Methods and Models for Optimization of Railways (ATMOS 2002)
-
Liebchen C., Möhring R.H. A case study in periodic timetabling. Electronic Notes in Theoretical Computer Science 2002, vol. 66 (6):18-31. Elsevier, Malaga, Spain, (July 7-13). D. Wagner (Ed.).
-
(2002)
Electronic Notes in Theoretical Computer Science
, vol.66
, Issue.6
, pp. 18-31
-
-
Liebchen, C.1
Möhring, R.H.2
-
13
-
-
18944375494
-
Some practical aspects of periodic timetabling
-
Springer, Berlin, P. Chamoni, R. Leisten, A. Martin, J. Minnemann, H. Stadtler (Eds.)
-
Liebchen C., Peeters L. Some practical aspects of periodic timetabling. Operations Research Proceedings 2001 2002, 25-32. Springer, Berlin. P. Chamoni, R. Leisten, A. Martin, J. Minnemann, H. Stadtler (Eds.).
-
(2002)
Operations Research Proceedings 2001
, pp. 25-32
-
-
Liebchen, C.1
Peeters, L.2
-
14
-
-
56249113768
-
Integral cycle bases for cyclic timetabling
-
Liebchen C., Peeters L. Integral cycle bases for cyclic timetabling. Discrete Optimization 2009, 6(1):98-109.
-
(2009)
Discrete Optimization
, vol.6
, Issue.1
, pp. 98-109
-
-
Liebchen, C.1
Peeters, L.2
-
15
-
-
70350618926
-
Computing delay-resistant railway timetables
-
Liebchen C., Schachtebeck M., Schöbel A., Stiller S., Prigge A. Computing delay-resistant railway timetables. Computers and Operations Research 2010, 37(5):857-868.
-
(2010)
Computers and Operations Research
, vol.37
, Issue.5
, pp. 857-868
-
-
Liebchen, C.1
Schachtebeck, M.2
Schöbel, A.3
Stiller, S.4
Prigge, A.5
-
16
-
-
70349864211
-
Delay resistant timetabling
-
Liebchen C., Stiller S. Delay resistant timetabling. Public Transport 2009, 1(1):55-72.
-
(2009)
Public Transport
, vol.1
, Issue.1
, pp. 55-72
-
-
Liebchen, C.1
Stiller, S.2
-
17
-
-
78650806988
-
-
Accordo di programma per la riqualificazione e il potenziamento della linea ferroviaria Milano-Mortara Technical Report, Politecnico di Milano (in Italian).
-
Maja, R., 1999. Accordo di programma per la riqualificazione e il potenziamento della linea ferroviaria Milano-Mortara. Technical Report, Politecnico di Milano (in Italian).
-
(1999)
-
-
Maja, R.1
-
18
-
-
78650813220
-
A Branch and Cut Approach for Periodic Network Programming
-
Technical Report 29, Hildesheimer Informatik-Berichte.
-
Nachtigall, K., 1994. A Branch and Cut Approach for Periodic Network Programming. Technical Report 29, Hildesheimer Informatik-Berichte.
-
(1994)
-
-
Nachtigall, K.1
-
19
-
-
0012700693
-
Periodic network optimization with different arc frequencies
-
Nachtigall K. Periodic network optimization with different arc frequencies. Discrete Applied Mathematics 1996, 69(1-2):1-17.
-
(1996)
Discrete Applied Mathematics
, vol.69
, Issue.1-2
, pp. 1-17
-
-
Nachtigall, K.1
-
20
-
-
18844380840
-
Periodic Network Optimization and Fixed Interval Timetables
-
Habilitationsschrift, Deutsches Zentrum für Luft-und Raumfahrt, Institut für Flugführung, Braunschweig.
-
Nachtigall, K., 1998. Periodic Network Optimization and Fixed Interval Timetables. Habilitationsschrift, Deutsches Zentrum für Luft-und Raumfahrt, Institut für Flugführung, Braunschweig.
-
(1998)
-
-
Nachtigall, K.1
-
21
-
-
0030143150
-
A genetic algorithm approach to periodic railway synchronization
-
Nachtigall K., Voget S. A genetic algorithm approach to periodic railway synchronization. Computers and Operations Research 1996, 23(5):453-463.
-
(1996)
Computers and Operations Research
, vol.23
, Issue.5
, pp. 453-463
-
-
Nachtigall, K.1
Voget, S.2
-
22
-
-
0031351812
-
Minimizing waiting times in integrated fixed interval timetables by upgrading railway tracks
-
Nachtigall K., Voget S. Minimizing waiting times in integrated fixed interval timetables by upgrading railway tracks. European Journal of Operational Research 1997, 103(3):610-627.
-
(1997)
European Journal of Operational Research
, vol.103
, Issue.3
, pp. 610-627
-
-
Nachtigall, K.1
Voget, S.2
-
23
-
-
0030412990
-
A constraint generation algorithm for the construction of periodic railway timetables
-
Odijk M.A. A constraint generation algorithm for the construction of periodic railway timetables. Transportation Research Part B 1996, 30(6):455-464.
-
(1996)
Transportation Research Part B
, vol.30
, Issue.6
, pp. 455-464
-
-
Odijk, M.A.1
-
26
-
-
85029825626
-
-
Cyclic Railway Timetable Optimization. Ph.D. Thesis, Erasmus University Rotterdam, Rotterdam, The Netherlands.
-
Peeters, L., 2003. Cyclic Railway Timetable Optimization. Ph.D. Thesis, Erasmus University Rotterdam, Rotterdam, The Netherlands.
-
(2003)
-
-
Peeters, L.1
-
27
-
-
78650817105
-
-
Spoorwegdienstregelingontwikkeling (Timetable Construction). Technical Report, CWI Center for Mathematics and Computer Science, Amsterdam (in Dutch).
-
Schrijver, A., Steenbeek, A., 1993. Spoorwegdienstregelingontwikkeling (Timetable Construction). Technical Report, CWI Center for Mathematics and Computer Science, Amsterdam (in Dutch).
-
(1993)
-
-
Schrijver, A.1
Steenbeek, A.2
-
29
-
-
0000513120
-
A pre-test-market evaluation of new packaged goods: a model and measurement methodology
-
Silk A.J., Urban G.L. A pre-test-market evaluation of new packaged goods: a model and measurement methodology. Journal of Marketing Research 1978, 15(2):171-191.
-
(1978)
Journal of Marketing Research
, vol.15
, Issue.2
, pp. 171-191
-
-
Silk, A.J.1
Urban, G.L.2
-
30
-
-
85029869948
-
-
Rail Scheduling with Discrete Sets. Technical Report, University of Technology, Eindhoven, The Netherlands.
-
Voorhoeve, M., 1993. Rail Scheduling with Discrete Sets. Technical Report, University of Technology, Eindhoven, The Netherlands.
-
(1993)
-
-
Voorhoeve, M.1
-
31
-
-
3242705761
-
Consumer benefits and demand impacts of regular train timetables
-
Wardman M., Shires J., Lythgoe W., Tyler J. Consumer benefits and demand impacts of regular train timetables. International Journal of Transport Management 2004, 2(1):39-49.
-
(2004)
International Journal of Transport Management
, vol.2
, Issue.1
, pp. 39-49
-
-
Wardman, M.1
Shires, J.2
Lythgoe, W.3
Tyler, J.4
|