메뉴 건너뛰기




Volumn 45, Issue 2, 2011, Pages 430-446

Optimizing the demand captured by a railway system with a regular timetable

Author keywords

Branch and bound; Discrete choice model; Modal choice; Regular timetable

Indexed keywords

BRANCH AND BOUND METHOD; HEURISTIC ALGORITHMS; ITERATIVE METHODS; OPTIMIZATION; PIECEWISE LINEAR TECHNIQUES; RAILROADS; SCHEDULING; TRANSPORTATION;

EID: 78650812863     PISSN: 01912615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.trb.2010.09.001     Document Type: Article
Times cited : (65)

References (31)
  • 2
  • 3
    • 78650083580 scopus 로고    scopus 로고
    • in press. Periodic railway timetabling with event flexibility. Networks.
    • Caimi, G., Fuchsberger, M., Laumanns, M., Schüpbach, K., in press. Periodic railway timetabling with event flexibility. Networks, doi:10.1002/net.20379.
    • Caimi, G.1    Fuchsberger, M.2    Laumanns, M.3    Schüpbach, K.4
  • 4
    • 85029870963 scopus 로고    scopus 로고
    • The periodic service intention as a conceptual frame for generating timetables with partial periodicity
    • Proceedings of the 3rd International Seminar on Railway Operations Research (ISROR). Zurich, Switzerland (February 11-13).
    • Caimi, G., Laumanns, M., Schüpbach, K., Wörner, S., Fuchsberger, M., 2009. The periodic service intention as a conceptual frame for generating timetables with partial periodicity. In: Proceedings of the 3rd International Seminar on Railway Operations Research (ISROR). Zurich, Switzerland (February 11-13).
    • (2009)
    • Caimi, G.1    Laumanns, M.2    Schüpbach, K.3    Wörner, S.4    Fuchsberger, M.5
  • 6
    • 85029832761 scopus 로고    scopus 로고
    • Delay management with re-routing of passengers. In: Clausen, J., Stefano, G.D. (Eds.), Proceedings of the 9th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems (ATMOS 2009). Copenhagen, Denmark (September 10).
    • Dollevoet, T., Huisman, D., Schmidt, M., Schöbel, A., 2009. Delay management with re-routing of passengers. In: Clausen, J., Stefano, G.D. (Eds.), Proceedings of the 9th Workshop on Algorithmic Approaches for Transportation Modeling, Optimization, and Systems (ATMOS 2009). Copenhagen, Denmark (September 10).
    • (2009)
    • Dollevoet, T.1    Huisman, D.2    Schmidt, M.3    Schöbel, A.4
  • 8
    • 0039444428 scopus 로고    scopus 로고
    • Decision support systems support the search for win-win solutions in railway network design
    • Hooghiemstra J., Kroon L., Odijk M., Salomon M., Zwaneveld P. Decision support systems support the search for win-win solutions in railway network design. Interfaces 1999, 29(2):15-32.
    • (1999) Interfaces , vol.29 , Issue.2 , pp. 15-32
    • Hooghiemstra, J.1    Kroon, L.2    Odijk, M.3    Salomon, M.4    Zwaneveld, P.5
  • 10
    • 0043207353 scopus 로고    scopus 로고
    • A variable trip time model for cyclic railway timetabling
    • Kroon L., Peeters L. A variable trip time model for cyclic railway timetabling. Transportation Science 2003, 37(2):198-212.
    • (2003) Transportation Science , vol.37 , Issue.2 , pp. 198-212
    • Kroon, L.1    Peeters, L.2
  • 11
    • 18944387053 scopus 로고    scopus 로고
    • Symmetry for periodic railway timetables
    • Elsevier, Budapest, Hungary, (September 15-20), B. Gerards (Ed.) Algorithmic Methods and Models for Optimization of Railways (ATMOS 2003)
    • Liebchen C. Symmetry for periodic railway timetables. Electronic Notes in Theoretical Computer Science 2002, vol. 92:1-103. Elsevier, Budapest, Hungary, (September 15-20). B. Gerards (Ed.).
    • (2002) Electronic Notes in Theoretical Computer Science , vol.92 , pp. 1-103
    • Liebchen, C.1
  • 12
    • 18944407379 scopus 로고    scopus 로고
    • A case study in periodic timetabling
    • Elsevier, Malaga, Spain, (July 7-13), D. Wagner (Ed.) Algorithmic Methods and Models for Optimization of Railways (ATMOS 2002)
    • Liebchen C., Möhring R.H. A case study in periodic timetabling. Electronic Notes in Theoretical Computer Science 2002, vol. 66 (6):18-31. Elsevier, Malaga, Spain, (July 7-13). D. Wagner (Ed.).
    • (2002) Electronic Notes in Theoretical Computer Science , vol.66 , Issue.6 , pp. 18-31
    • Liebchen, C.1    Möhring, R.H.2
  • 13
    • 18944375494 scopus 로고    scopus 로고
    • Some practical aspects of periodic timetabling
    • Springer, Berlin, P. Chamoni, R. Leisten, A. Martin, J. Minnemann, H. Stadtler (Eds.)
    • Liebchen C., Peeters L. Some practical aspects of periodic timetabling. Operations Research Proceedings 2001 2002, 25-32. Springer, Berlin. P. Chamoni, R. Leisten, A. Martin, J. Minnemann, H. Stadtler (Eds.).
    • (2002) Operations Research Proceedings 2001 , pp. 25-32
    • Liebchen, C.1    Peeters, L.2
  • 14
    • 56249113768 scopus 로고    scopus 로고
    • Integral cycle bases for cyclic timetabling
    • Liebchen C., Peeters L. Integral cycle bases for cyclic timetabling. Discrete Optimization 2009, 6(1):98-109.
    • (2009) Discrete Optimization , vol.6 , Issue.1 , pp. 98-109
    • Liebchen, C.1    Peeters, L.2
  • 16
    • 70349864211 scopus 로고    scopus 로고
    • Delay resistant timetabling
    • Liebchen C., Stiller S. Delay resistant timetabling. Public Transport 2009, 1(1):55-72.
    • (2009) Public Transport , vol.1 , Issue.1 , pp. 55-72
    • Liebchen, C.1    Stiller, S.2
  • 17
    • 78650806988 scopus 로고    scopus 로고
    • Accordo di programma per la riqualificazione e il potenziamento della linea ferroviaria Milano-Mortara Technical Report, Politecnico di Milano (in Italian).
    • Maja, R., 1999. Accordo di programma per la riqualificazione e il potenziamento della linea ferroviaria Milano-Mortara. Technical Report, Politecnico di Milano (in Italian).
    • (1999)
    • Maja, R.1
  • 18
    • 78650813220 scopus 로고
    • A Branch and Cut Approach for Periodic Network Programming
    • Technical Report 29, Hildesheimer Informatik-Berichte.
    • Nachtigall, K., 1994. A Branch and Cut Approach for Periodic Network Programming. Technical Report 29, Hildesheimer Informatik-Berichte.
    • (1994)
    • Nachtigall, K.1
  • 19
    • 0012700693 scopus 로고    scopus 로고
    • Periodic network optimization with different arc frequencies
    • Nachtigall K. Periodic network optimization with different arc frequencies. Discrete Applied Mathematics 1996, 69(1-2):1-17.
    • (1996) Discrete Applied Mathematics , vol.69 , Issue.1-2 , pp. 1-17
    • Nachtigall, K.1
  • 20
    • 18844380840 scopus 로고    scopus 로고
    • Periodic Network Optimization and Fixed Interval Timetables
    • Habilitationsschrift, Deutsches Zentrum für Luft-und Raumfahrt, Institut für Flugführung, Braunschweig.
    • Nachtigall, K., 1998. Periodic Network Optimization and Fixed Interval Timetables. Habilitationsschrift, Deutsches Zentrum für Luft-und Raumfahrt, Institut für Flugführung, Braunschweig.
    • (1998)
    • Nachtigall, K.1
  • 21
    • 0030143150 scopus 로고    scopus 로고
    • A genetic algorithm approach to periodic railway synchronization
    • Nachtigall K., Voget S. A genetic algorithm approach to periodic railway synchronization. Computers and Operations Research 1996, 23(5):453-463.
    • (1996) Computers and Operations Research , vol.23 , Issue.5 , pp. 453-463
    • Nachtigall, K.1    Voget, S.2
  • 22
    • 0031351812 scopus 로고    scopus 로고
    • Minimizing waiting times in integrated fixed interval timetables by upgrading railway tracks
    • Nachtigall K., Voget S. Minimizing waiting times in integrated fixed interval timetables by upgrading railway tracks. European Journal of Operational Research 1997, 103(3):610-627.
    • (1997) European Journal of Operational Research , vol.103 , Issue.3 , pp. 610-627
    • Nachtigall, K.1    Voget, S.2
  • 23
    • 0030412990 scopus 로고    scopus 로고
    • A constraint generation algorithm for the construction of periodic railway timetables
    • Odijk M.A. A constraint generation algorithm for the construction of periodic railway timetables. Transportation Research Part B 1996, 30(6):455-464.
    • (1996) Transportation Research Part B , vol.30 , Issue.6 , pp. 455-464
    • Odijk, M.A.1
  • 26
    • 85029825626 scopus 로고    scopus 로고
    • Cyclic Railway Timetable Optimization. Ph.D. Thesis, Erasmus University Rotterdam, Rotterdam, The Netherlands.
    • Peeters, L., 2003. Cyclic Railway Timetable Optimization. Ph.D. Thesis, Erasmus University Rotterdam, Rotterdam, The Netherlands.
    • (2003)
    • Peeters, L.1
  • 27
    • 78650817105 scopus 로고
    • Spoorwegdienstregelingontwikkeling (Timetable Construction). Technical Report, CWI Center for Mathematics and Computer Science, Amsterdam (in Dutch).
    • Schrijver, A., Steenbeek, A., 1993. Spoorwegdienstregelingontwikkeling (Timetable Construction). Technical Report, CWI Center for Mathematics and Computer Science, Amsterdam (in Dutch).
    • (1993)
    • Schrijver, A.1    Steenbeek, A.2
  • 28
    • 0008917539 scopus 로고
    • A mathematical model for periodic scheduling problems
    • Serafini P., Ukovich W. A mathematical model for periodic scheduling problems. SIAM Journal on Discrete Mathematics 1989, 2(4):550-581.
    • (1989) SIAM Journal on Discrete Mathematics , vol.2 , Issue.4 , pp. 550-581
    • Serafini, P.1    Ukovich, W.2
  • 29
    • 0000513120 scopus 로고
    • A pre-test-market evaluation of new packaged goods: a model and measurement methodology
    • Silk A.J., Urban G.L. A pre-test-market evaluation of new packaged goods: a model and measurement methodology. Journal of Marketing Research 1978, 15(2):171-191.
    • (1978) Journal of Marketing Research , vol.15 , Issue.2 , pp. 171-191
    • Silk, A.J.1    Urban, G.L.2
  • 30
    • 85029869948 scopus 로고
    • Rail Scheduling with Discrete Sets. Technical Report, University of Technology, Eindhoven, The Netherlands.
    • Voorhoeve, M., 1993. Rail Scheduling with Discrete Sets. Technical Report, University of Technology, Eindhoven, The Netherlands.
    • (1993)
    • Voorhoeve, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.