-
4
-
-
33644594453
-
A Lagrangian heuristic algorithm for a real-world train timetabling problem
-
A. Caprara, M. Monaci, P. Toth, and P.L. Guida A Lagrangian heuristic algorithm for a real-world train timetabling problem Discrete Appl. Math. 154 2006 738 753
-
(2006)
Discrete Appl. Math.
, vol.154
, pp. 738-753
-
-
Caprara, A.1
Monaci, M.2
Toth, P.3
Guida, P.L.4
-
5
-
-
56349124838
-
A hybrid electromagnetism-like algorithm for single machine scheduling problem
-
P.C. Chang, S.H. Chen, and C.Y. Fan A hybrid electromagnetism-like algorithm for single machine scheduling problem Expert Sys. Appl. 36 2009 1259 1267
-
(2009)
Expert Sys. Appl.
, vol.36
, pp. 1259-1267
-
-
Chang, P.C.1
Chen, S.H.2
Fan, C.Y.3
-
6
-
-
0032203702
-
A survey of optimization models for train routing and scheduling
-
J.-F. Cordeau, P. Toth, and D. Vigo A survey of optimization models for train routing and scheduling Transp. Sci. 32 1998 380 404
-
(1998)
Transp. Sci.
, vol.32
, pp. 380-404
-
-
Cordeau, J.-F.1
Toth, P.2
Vigo, D.3
-
7
-
-
34249982545
-
A branch and bound algorithm for scheduling trains in a railway network
-
A. DAriano, D. Pacciarelli, and M. Pranzo A branch and bound algorithm for scheduling trains in a railway network Eur. J. Oper. Res. 183 2007 643 657
-
(2007)
Eur. J. Oper. Res.
, vol.183
, pp. 643-657
-
-
Dariano, A.1
Pacciarelli, D.2
Pranzo, M.3
-
8
-
-
0016952078
-
The complexity of flowshop and job-shop scheduling
-
M.R. Garey, D.S. Johnson, and R. Sethi The complexity of flowshop and job-shop scheduling Math. Oper. Res. 1 1976 117 129
-
(1976)
Math. Oper. Res.
, vol.1
, pp. 117-129
-
-
Garey, M.R.1
Johnson, D.S.2
Sethi, R.3
-
9
-
-
84859428558
-
An ant colony system heuristic for train scheduling problem
-
K. Ghoseiri, and F. Morshedsolouk An ant colony system heuristic for train scheduling problem J. Transp. Res. 2 4 2006 257 270
-
(2006)
J. Transp. Res.
, vol.2
, Issue.4
, pp. 257-270
-
-
Ghoseiri, K.1
Morshedsolouk, F.2
-
11
-
-
84859422276
-
Train scheduling with the application of simulated annealing algorithm
-
in Persian Language
-
A. Jamili, and F. Kianfar Train scheduling with the application of simulated annealing algorithm J. Transp. Res. 6 1 2009 13 27 in Persian Language
-
(2009)
J. Transp. Res.
, vol.6
, Issue.1
, pp. 13-27
-
-
Jamili, A.1
Kianfar, F.2
-
12
-
-
0029535737
-
Particle swarm optimization
-
IEEE service Center, Piscataway, N.J.
-
Kennedy, J., Eberhart, R.C., 1995. Particle swarm optimization. In: Proceedings of the IEEE International Conference on Neural Networks, IEEE service Center, Piscataway, N.J., 4, pp. 19421948.
-
(1995)
Proceedings of the IEEE International Conference on Neural Networks
, vol.4
, pp. 19421948
-
-
Kennedy, J.1
Eberhart, R.C.2
-
16
-
-
34250708985
-
An efficient stochastic hybrid heuristic for flowshop scheduling
-
D. Laha, and U.K. Chakraborty An efficient stochastic hybrid heuristic for flowshop scheduling Eng. Appl. Artif. Intell. 20 2007 851 856
-
(2007)
Eng. Appl. Artif. Intell.
, vol.20
, pp. 851-856
-
-
Laha, D.1
Chakraborty, U.K.2
-
18
-
-
18944375494
-
Some practical aspects of periodic timetabling
-
P. Chamoni, Springer
-
C. Liebchen, and L. Peeters Some practical aspects of periodic timetabling P. Chamoni, Operational Research Proceedings 2001 2002 Springer 25 32
-
(2002)
Operational Research Proceedings
, vol.2001
, pp. 25-32
-
-
Liebchen, C.1
Peeters, L.2
-
19
-
-
70449529496
-
An efficient job-shop scheduling algorithm based on particle swarm optimization
-
10.1016/j.eswa.2009.08.015
-
T.-L. Lin, S.-J. Horng, T.-W. Kao, Y.-H. Chen, R.-S. Run, R.-J. Chen, J.-L. Lai, and I.-H. Kuo An efficient job-shop scheduling algorithm based on particle swarm optimization Expert Sys. Appl 2009 10.1016/j.eswa.2009.08.015
-
(2009)
Expert Sys. Appl
-
-
Lin, T.-L.1
Horng, S.-J.2
Kao, T.-W.3
Chen, Y.-H.4
Run, R.-S.5
Chen, R.-J.6
Lai, J.-L.7
Kuo, I.-H.8
-
20
-
-
33748698838
-
A traffic management system for real-time traffic optimisation in railways
-
M. Mazzarello, and E. Ottaviani A traffic management system for real-time traffic optimisation in railways Transp. Res. - Part B 41 2007 246 274
-
(2007)
Transp. Res. - Part B
, vol.41
, pp. 246-274
-
-
Mazzarello, M.1
Ottaviani, E.2
-
22
-
-
2942589074
-
A novel metaheuristic approach for the flow shop scheduling problem
-
A.C. Nearchou A novel metaheuristic approach for the flow shop scheduling problem Eng. Appl. Artif. Intell. 17 2004 289 300
-
(2004)
Eng. Appl. Artif. Intell.
, vol.17
, pp. 289-300
-
-
Nearchou, A.C.1
-
23
-
-
29144470142
-
Generation of classes of robust periodic railway timetables
-
M.A. Odijk, H.E. Romeijn, and H.V. Maaren Generation of classes of robust periodic railway timetables Comput. Oper. Res. 33 2006 2283 2299
-
(2006)
Comput. Oper. Res.
, vol.33
, pp. 2283-2299
-
-
Odijk, M.A.1
Romeijn, H.E.2
Maaren, H.V.3
-
25
-
-
0032884348
-
Railway traffic control and train scheduling based on inter-train conflict management
-
I. Sahin Railway traffic control and train scheduling based on inter-train conflict management Transp. Res. - Part B 33 1999 511 534
-
(1999)
Transp. Res. - Part B
, vol.33
, pp. 511-534
-
-
Sahin, I.1
-
26
-
-
81155138525
-
Train scheduling in single-track routes
-
in Persian Language
-
M.-M. Sepehri, and M. Pourseyed-Aghaee Train scheduling in single-track routes J. Fac. Eng. 33 20 1999 in Persian Language
-
(1999)
J. Fac. Eng.
, vol.33
, Issue.20
-
-
Sepehri, M.-M.1
Pourseyed-Aghaee, M.2
-
27
-
-
0008917539
-
A mathematical model for periodic scheduling problems
-
P. Serafini, and W. Ukovich A mathematical model for periodic scheduling problems SIAM J. Discrete Math. 2 4 1989 550 581
-
(1989)
SIAM J. Discrete Math.
, vol.2
, Issue.4
, pp. 550-581
-
-
Serafini, P.1
Ukovich, W.2
-
28
-
-
84857788279
-
Robust Train Timetabling problem: Mathematical model and Branch and bound algorithm
-
M.A. Shafia, M. Pourseyed Aghaee, S.J. Sadjadi, and A. Jamili Robust Train Timetabling problem: Mathematical model and Branch and bound algorithm IEEE Trans. Intell. Trans. Systems 13 1 2012 307 317
-
(2012)
IEEE Trans. Intell. Trans. Systems
, vol.13
, Issue.1
, pp. 307-317
-
-
Shafia, M.A.1
Pourseyed Aghaee, M.2
Sadjadi, S.J.3
Jamili, A.4
-
29
-
-
81155155628
-
The periodicity and robustness in a single-track train scheduling problem
-
doi.org/10.1016/j.asoc.2011.08.026 in press
-
Shafia, M.A., Sadjadi, S.J., Jamili A., Tavakkoli-Moghaddam, R., Pourseyed Aghaee M. The periodicity and robustness in a single-track train scheduling problem, Appl. Soft Comput. doi:10.1016/j.asoc.2011.08.026, in press.
-
Appl. Soft Comput.
-
-
Shafia, M.A.1
Sadjadi, S.J.2
Jamili, A.3
Tavakkoli-Moghaddam, R.4
Pourseyed Aghaee, M.5
-
30
-
-
64549118766
-
A hybridization of simulated annealing and electromagnetic-like mechanism for job shop problems with machine availability and sequence-dependent setup times to minimize total weighted tardiness
-
R. Tavakkoli-Moghaddam, M. Khalili, and B. Naderi A hybridization of simulated annealing and electromagnetic-like mechanism for job shop problems with machine availability and sequence-dependent setup times to minimize total weighted tardiness Soft Comput. 13 2009 995 1006
-
(2009)
Soft Comput.
, vol.13
, pp. 995-1006
-
-
Tavakkoli-Moghaddam, R.1
Khalili, M.2
Naderi, B.3
-
31
-
-
36448977879
-
Railway traffic disturbance management - An experimental analysis of disturbance complexity, management objectives and limitations in planning horizon
-
J. Tornquist Railway traffic disturbance management - an experimental analysis of disturbance complexity, management objectives and limitations in planning horizon Transp. Res. - Part A 41 2007 249 266
-
(2007)
Transp. Res. - Part A
, vol.41
, pp. 249-266
-
-
Tornquist, J.1
-
32
-
-
33845266135
-
N-tracked railway traffic re-scheduling during disturbances
-
J. Tornquist, and J.A. Persson N-tracked railway traffic re-scheduling during disturbances Transp. Res. - Part B 41 2007 342 362
-
(2007)
Transp. Res. - Part B
, vol.41
, pp. 342-362
-
-
Tornquist, J.1
Persson, J.A.2
-
33
-
-
10644237939
-
Simultaneous disruption recovery of a train timetable and crew roster in real time
-
C.G. Walker, J.N. Snowdon, and D.M. Ryan Simultaneous disruption recovery of a train timetable and crew roster in real time Comput. Oper. Res. 32 80 2005 2077 2094
-
(2005)
Comput. Oper. Res.
, vol.32
, Issue.80
, pp. 2077-2094
-
-
Walker, C.G.1
Snowdon, J.N.2
Ryan, D.M.3
-
34
-
-
67349174559
-
An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem
-
G. Zhang, X. Shao, P. Li, and L. Gao An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem Comput. Ind. Eng. 56 2009 1309 1318
-
(2009)
Comput. Ind. Eng.
, vol.56
, pp. 1309-1318
-
-
Zhang, G.1
Shao, X.2
Li, P.3
Gao, L.4
-
35
-
-
13544267417
-
Bicriteria train scheduling for high-speed passenger railroad planning applications
-
X. Zhou, and M. Zhong Bicriteria train scheduling for high-speed passenger railroad planning applications Eur. J. Oper. Res. 167 2005 752 771
-
(2005)
Eur. J. Oper. Res.
, vol.167
, pp. 752-771
-
-
Zhou, X.1
Zhong, M.2
-
36
-
-
33845274298
-
Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds
-
X. Zhou, and M. Zhong Single-track train timetabling with guaranteed optimality: Branch-and-bound algorithms with enhanced lower bounds Transp. Res. - Part B 41 2007 320 341
-
(2007)
Transp. Res. - Part B
, vol.41
, pp. 320-341
-
-
Zhou, X.1
Zhong, M.2
|