메뉴 건너뛰기




Volumn 31, Issue 6, 2007, Pages 955-970

FMS scheduling based on timed Petri Net model and reactive graph search

Author keywords

Due date problem; Model based scheduling; RTA*; Supervisor; Timed Petri Net

Indexed keywords

KNOWLEDGE BASED SYSTEMS; MATHEMATICAL MODELS; OPTIMIZATION; PETRI NETS; SUPERVISORY AND EXECUTIVE PROGRAMS;

EID: 33846121916     PISSN: 0307904X     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.apm.2006.10.023     Document Type: Article
Times cited : (50)

References (32)
  • 1
    • 33846178762 scopus 로고    scopus 로고
    • P.B. Luh, D.J. Hoitomt, Scheduling of manufacturing systems using the Lagrangean relaxation techniques, in: Proc. IFAC Workshop Discrete Event Syst. Theory Appl., Shenyang, China, 1991.
  • 2
    • 33846179427 scopus 로고    scopus 로고
    • D.J. Hoitomt, P.B. Luh, K.R. Pattipati, Job shop scheduling, in: Proc. 1st Int. Conf. Automat. Technol.,Taipei, Taiwan, ROC, 1990, pp. 565-574.
  • 4
    • 0029224911 scopus 로고
    • A genetic algorithm for the job shop problem
    • Croce F., Tadei R., and Volta G. A genetic algorithm for the job shop problem. Comput. Oper. Res. 22 (1995) 15-24
    • (1995) Comput. Oper. Res. , vol.22 , pp. 15-24
    • Croce, F.1    Tadei, R.2    Volta, G.3
  • 5
    • 0027906589 scopus 로고
    • Minimizing flow time variance in a single machine system using genetic algorithms
    • Gupta M.C., Gupta Y.P., and Kumar A. Minimizing flow time variance in a single machine system using genetic algorithms. Eur. J. Oper. Res. 70 (1993) 289-303
    • (1993) Eur. J. Oper. Res. , vol.70 , pp. 289-303
    • Gupta, M.C.1    Gupta, Y.P.2    Kumar, A.3
  • 7
    • 0031258003 scopus 로고    scopus 로고
    • Design of assembly systems for modular products
    • He D.W., and Kusiak A. Design of assembly systems for modular products. IEEE Trans. Robot. Automat. 13 5 (1997)
    • (1997) IEEE Trans. Robot. Automat. , vol.13 , Issue.5
    • He, D.W.1    Kusiak, A.2
  • 8
    • 34250074609 scopus 로고
    • Applying tabu-search to the job shop scheduling problem
    • Dell'sAmico M., and Trubian M. Applying tabu-search to the job shop scheduling problem. Ann. Oper. Res. 41 (1991) 231-252
    • (1991) Ann. Oper. Res. , vol.41 , pp. 231-252
    • Dell'sAmico, M.1    Trubian, M.2
  • 9
    • 0032045960 scopus 로고    scopus 로고
    • Tabu search for resource constrained scheduling
    • Verhoeven M.G.A. Tabu search for resource constrained scheduling. Eur. J. Oper. Res. 106 (1998) 266-276
    • (1998) Eur. J. Oper. Res. , Issue.106 , pp. 266-276
    • Verhoeven, M.G.A.1
  • 10
    • 5244278595 scopus 로고    scopus 로고
    • A fast taboo search algorithm for the job shop problem
    • Nowicki E., and Smutnicki C. A fast taboo search algorithm for the job shop problem. Manage. Sci. 42 (1996) 797-813
    • (1996) Manage. Sci. , vol.42 , pp. 797-813
    • Nowicki, E.1    Smutnicki, C.2
  • 11
    • 0029288391 scopus 로고
    • Solving the job shop scheduling problem with Tabu search
    • Barnes J.W., and Chambers J.B. Solving the job shop scheduling problem with Tabu search. IIE Trans. 27 (1995) 257-263
    • (1995) IIE Trans. , Issue.27 , pp. 257-263
    • Barnes, J.W.1    Chambers, J.B.2
  • 12
    • 0031258004 scopus 로고    scopus 로고
    • Dynamic global path planning with uncertainty for mobile robot in manufacturing
    • Hu H., and Brady M. Dynamic global path planning with uncertainty for mobile robot in manufacturing. IEEE Trans. Robot. Automat. 13 5 (1997)
    • (1997) IEEE Trans. Robot. Automat. , vol.13 , Issue.5
    • Hu, H.1    Brady, M.2
  • 13
    • 0000460052 scopus 로고
    • A dynamic programming approach to sequencing problem
    • Held M., and Karp R.M. A dynamic programming approach to sequencing problem. J. Soc. Ind. Appl. Math. 10 (1962) 196-210
    • (1962) J. Soc. Ind. Appl. Math. , vol.10 , pp. 196-210
    • Held, M.1    Karp, R.M.2
  • 14
    • 0022023671 scopus 로고
    • A branch and bound algorithm for the total weighted tardiness problem
    • Potts C.N., and Van Wassenhove L.N. A branch and bound algorithm for the total weighted tardiness problem. Oper. Res. 33 (1985) 363-377
    • (1985) Oper. Res. , vol.33 , pp. 363-377
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 16
    • 0000165767 scopus 로고
    • An algorithm for solving the job-shop problem
    • Adams J., Balas E., and Zawack D. An algorithm for solving the job-shop problem. Manage. Sci. 35 (1989) 164-176
    • (1989) Manage. Sci. , vol.35 , pp. 164-176
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 17
    • 0023399009 scopus 로고
    • Priority rules for job shop with weighted tardiness costs
    • Vepsalainen A.P.J., and Morton T.E. Priority rules for job shop with weighted tardiness costs. Manage. Sci. 33 (1987) 1035-1047
    • (1987) Manage. Sci. , vol.33 , pp. 1035-1047
    • Vepsalainen, A.P.J.1    Morton, T.E.2
  • 18
    • 0028546121 scopus 로고
    • One machine scheduling problem with fuzzy due dates
    • Han S., Ishii H., and Fujii S. One machine scheduling problem with fuzzy due dates. Eur. J. Oper. Res. 79 (1994) 1-12
    • (1994) Eur. J. Oper. Res. , vol.79 , pp. 1-12
    • Han, S.1    Ishii, H.2    Fujii, S.3
  • 19
    • 0028197847 scopus 로고
    • Local search algorithms for flow shop scheduling with fuzzy due dates
    • Ishibuchi H., Yamamoto N., and Masaki S. Local search algorithms for flow shop scheduling with fuzzy due dates. Int. J. Prod. Econom. 33 1 (1994) 53-66
    • (1994) Int. J. Prod. Econom. , vol.33 , Issue.1 , pp. 53-66
    • Ishibuchi, H.1    Yamamoto, N.2    Masaki, S.3
  • 20
    • 0028413979 scopus 로고
    • Scheduling flexible manufacturing systems using petri nets and heuristic search
    • Lee D.Y., and DiCesare F. Scheduling flexible manufacturing systems using petri nets and heuristic search. IEEE Trans. Robot. Automat. 10 2 (1994) 123-132
    • (1994) IEEE Trans. Robot. Automat. , vol.10 , Issue.2 , pp. 123-132
    • Lee, D.Y.1    DiCesare, F.2
  • 21
    • 0032049823 scopus 로고    scopus 로고
    • Timed petri net based scheduling for mechanical assembly integration of planning and scheduling
    • Inaba A., Fujiwara F., Suzuki T., and Okuma S. Timed petri net based scheduling for mechanical assembly integration of planning and scheduling. IEICE Trans. Fundam. E81-A 4 (1998) 615-625
    • (1998) IEICE Trans. Fundam. , vol.E81-A , Issue.4 , pp. 615-625
    • Inaba, A.1    Fujiwara, F.2    Suzuki, T.3    Okuma, S.4
  • 22
    • 33846161682 scopus 로고    scopus 로고
    • C.A. Petri, Communication with Automata, Tech. Rep. RADC-TR-65-377, Griffiss Air Force Base, New York, vol. 1, suppl. 1, 1966.
  • 23
    • 0028698360 scopus 로고
    • Integrated scheduling of flexible manufacturing system employing automated guided vehicles
    • Lee D.Y., and DiCesare F. Integrated scheduling of flexible manufacturing system employing automated guided vehicles. IEEE Trans. Ind. Electron. 41 6 (1994) 602-610
    • (1994) IEEE Trans. Ind. Electron. , vol.41 , Issue.6 , pp. 602-610
    • Lee, D.Y.1    DiCesare, F.2
  • 24
    • 0025400088 scopus 로고
    • Real Time heuristic search
    • Korf R.E. Real Time heuristic search. Artif. Intell. 42 (1990) 189-211
    • (1990) Artif. Intell. , vol.42 , pp. 189-211
    • Korf, R.E.1
  • 27
    • 33846164177 scopus 로고
    • An on-line scheduling method for flexible manufacturing systems by a hierarchical decision making system
    • Mori K., Tsukiyama M., and Fukuda T. An on-line scheduling method for flexible manufacturing systems by a hierarchical decision making system. Trans. IEE Jpn. 113-D 9 (1993) 1054-1060
    • (1993) Trans. IEE Jpn. , vol.113 -D , Issue.9 , pp. 1054-1060
    • Mori, K.1    Tsukiyama, M.2    Fukuda, T.3
  • 28
    • 0038620624 scopus 로고
    • Scheduling and re-scheduling of AGVs for flexible and agile manufacturing
    • Zhou M. (Ed), Kluwer Academic Publishers, Dordrecht, NL
    • Li S., Takamori T., and Tadokoro S. Scheduling and re-scheduling of AGVs for flexible and agile manufacturing. In: Zhou M. (Ed). Petri nets and Agile Automation (1995), Kluwer Academic Publishers, Dordrecht, NL 189-205
    • (1995) Petri nets and Agile Automation , pp. 189-205
    • Li, S.1    Takamori, T.2    Tadokoro, S.3
  • 29
    • 33645282912 scopus 로고
    • Distributed real-time scheduling for flexible manufacturing
    • Hatono I., Tachibana K., Umano M., and Tamura H. Distributed real-time scheduling for flexible manufacturing. Trans. SICE 31 1 (1995) 108-115
    • (1995) Trans. SICE , vol.31 , Issue.1 , pp. 108-115
    • Hatono, I.1    Tachibana, K.2    Umano, M.3    Tamura, H.4
  • 30
    • 33846156293 scopus 로고    scopus 로고
    • Object-orient data management and distribution for real-time command and control systems
    • Bestavros A.A., Lin K.J., and Son S.H. (Eds), Kluwer Academic Publishers
    • Ginis R., Hughes E., Wohlever S., Thuraisingham B., Krupp P., and Maurer J. Object-orient data management and distribution for real-time command and control systems. In: Bestavros A.A., Lin K.J., and Son S.H. (Eds). Real-Time Database Systems Issues and Applications (1997), Kluwer Academic Publishers
    • (1997) Real-Time Database Systems Issues and Applications
    • Ginis, R.1    Hughes, E.2    Wohlever, S.3    Thuraisingham, B.4    Krupp, P.5    Maurer, J.6
  • 31
    • 0023104549 scopus 로고
    • Supervisory control of a class of discrete event processes
    • Ramadge P.J., and Wonham W.M. Supervisory control of a class of discrete event processes. SIAM J. Control Optim. 25 1 (1987) 206-230
    • (1987) SIAM J. Control Optim. , vol.25 , Issue.1 , pp. 206-230
    • Ramadge, P.J.1    Wonham, W.M.2
  • 32
    • 0023347999 scopus 로고
    • On the supremal controllable sublanguage of a given language
    • Wonham W.M., and Ramadge P.J. On the supremal controllable sublanguage of a given language. SIAM J. Control Optim. 25 3 (1987) 637-659
    • (1987) SIAM J. Control Optim. , vol.25 , Issue.3 , pp. 637-659
    • Wonham, W.M.1    Ramadge, P.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.