메뉴 건너뛰기




Volumn 23, Issue 6, 2012, Pages 2237-2253

Network modeling and evolutionary optimization for scheduling in manufacturing

Author keywords

Advanced planning and scheduling (APS); Evolutionary algorithm (EA); Manufacturing optimization; Network modeling; Service oriented architecture

Indexed keywords

ADVANCED PLANNING AND SCHEDULING; COMPLEX SCHEDULING; EVOLUTIONARY OPTIMIZATIONS; MATHEMATICAL FORMULATION; MULTI-SECTION; NETWORK MODELING; SCHEDULING MODELS; SCHEDULING PROBLEM; SERVICE ORIENTED;

EID: 84870920678     PISSN: 09565515     EISSN: 15728145     Source Type: Journal    
DOI: 10.1007/s10845-011-0569-6     Document Type: Article
Times cited : (32)

References (51)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391-401.
    • (1988) Management Science , vol.34 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0002381223 scopus 로고
    • Machine scheduling via disjunctive graphs: An implicit enumeration algorithm
    • Balas, E. (1969). Machine scheduling via disjunctive graphs: An implicit enumeration algorithm. Operation Research, 17, 941-957.
    • (1969) Operation Research , vol.17 , pp. 941-957
    • Balas, E.1
  • 5
    • 67349263022 scopus 로고    scopus 로고
    • A theoretic and practical framework for scheduling in a stochastic environment
    • Bidot, J., Vidal, T., Laborie, P., & Beck, J. C. (2009). A theoretic and practical framework for scheduling in a stochastic environment. Journal of Scheduling, 12(3), 315-344.
    • (2009) Journal of Scheduling , vol.12 , Issue.3 , pp. 315-344
    • Bidot, J.1    Vidal, T.2    Laborie, P.3    Beck, J.C.4
  • 6
    • 56349117292 scopus 로고    scopus 로고
    • A memetic algorithm with dynamic population management for an integrated production-distribution problem
    • Boudia, M., & Prins, C. (2009). A memetic algorithm with dynamic population management for an integrated production-distribution problem. European Journal of Operational Research, 195(3), 703-715.
    • (2009) European Journal of Operational Research , vol.195 , Issue.3 , pp. 703-715
    • Boudia, M.1    Prins, C.2
  • 7
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • Brandimarte, P. (1993). Routing and scheduling in a flexible job shop by tabu search. Annals of Operations Research, 41, 157-183.
    • (1993) Annals of Operations Research , vol.41 , pp. 157-183
    • Brandimarte, P.1
  • 8
    • 0025531716 scopus 로고
    • Job-shop scheduling with multi-purpose machines
    • Bruker, P., & Schlie, R. (1990). Job-shop scheduling with multi-purpose machines. Computing, 45, 369-375.
    • (1990) Computing , vol.45 , pp. 369-375
    • Bruker, P.1    Schlie, R.2
  • 9
    • 0030242695 scopus 로고    scopus 로고
    • A tutorial survey of jobshop scheduling problems using genetic algorithm, Part I: Representation
    • Cheng, R., Gen, M., & Tsujimura, Y. (1996). A tutorial survey of jobshop scheduling problems using genetic algorithm, Part I: Representation. Computers and Industrial Engineering, 30(4), 983-997.
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.4 , pp. 983-997
    • Cheng, R.1    Gen, M.2    Tsujimura, Y.3
  • 10
    • 0032592184 scopus 로고    scopus 로고
    • A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: Hybrid genetic search strategies
    • Cheng, R., Gen, M., & Tsujimura, Y. (1999). A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: Hybrid genetic search strategies. Computers and Industrial Engineering, 36(2), 343-364.
    • (1999) Computers and Industrial Engineering , vol.36 , Issue.2 , pp. 343-364
    • Cheng, R.1    Gen, M.2    Tsujimura, Y.3
  • 12
    • 0034501331 scopus 로고    scopus 로고
    • A genetic algorithm to solve the general multi-level lot-sizing problem with timevarying costs
    • Dellaert, N., Jeunet, J., & Jornard, N. (2000). A genetic algorithm to solve the general multi-level lot-sizing problem with timevarying costs. International Journal of Production Economy, 68, 241-257.
    • (2000) International Journal of Production Economy , vol.68 , pp. 241-257
    • Dellaert, N.1    Jeunet, J.2    Jornard, N.3
  • 15
    • 0001947856 scopus 로고
    • Probabilistic learning combinations of local jobshop scheduling rules
    • J. F. Muth & G. L. Thompson (Eds.). Englewood Cliffs: Prentice Hall
    • Fisher, H. (1963). Probabilistic learning combinations of local jobshop scheduling rules. In J. F. Muth & G. L. Thompson (Eds.), Industrial scheduling (pp. 225-251). Englewood Cliffs: Prentice Hall.
    • (1963) Industrial Scheduling , pp. 225-251
    • Fisher, H.1
  • 16
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-Time versus discrete-Time approaches for scheduling of chemical processes: A review
    • Floudas, C. A., & Lin, X. (2004). Continuous-Time versus discrete-Time approaches for scheduling of chemical processes: A review. Computers & Chemical Engineering, 28, 2109.
    • (2004) Computers & Chemical Engineering , vol.28 , pp. 2109
    • Floudas, C.A.1    Lin, X.2
  • 17
    • 25144491255 scopus 로고    scopus 로고
    • Mixed integer linear programming in process scheduling: Modeling, algorithms, and applications
    • Floudas, C. A., & Lin, X. (2005). Mixed integer linear programming in process scheduling: Modeling, algorithms, and applications. Annals of Operations Research, 139, 131.
    • (2005) Annals of Operations Research , vol.139 , pp. 131
    • Floudas, C.A.1    Lin, X.2
  • 19
    • 60549100127 scopus 로고    scopus 로고
    • Evolutionary techniques for optimization problems in integrated manufacturing system: State-of-The-Art-survey
    • Gen, M., Lin, L., & Zhang, H. (2009). Evolutionary techniques for optimization problems in integrated manufacturing system: State-of-The-Art- survey. Computers and Industrial Engineering, 56(3), 779-808.
    • (2009) Computers and Industrial Engineering , vol.56 , Issue.3 , pp. 779-808
    • Gen, M.1    Lin, L.2    Zhang, H.3
  • 21
    • 57149129406 scopus 로고    scopus 로고
    • Effective designing chromosome for optimizing advanced planning and scheduling
    • November. C. H. Dagli, et al. (Eds.). New York: ASME Press
    • Gen, M., & Zhang, H. (2006, November). Effective designing chromosome for optimizing advanced planning and scheduling. In C. H. Dagli, et al. (Eds.), Intelligent engineering systems through artificial neural networks (Vol. 16, pp. 61-66). New York: ASME Press.
    • (2006) Intelligent Engineering Systems Through Artificial Neural Networks , vol.16 , pp. 61-66
    • Gen, M.1    Zhang, H.2
  • 23
    • 0036464279 scopus 로고    scopus 로고
    • Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
    • Kacem, I., Hammadi, S., & Borne, P. (2002). Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems. IEEE Transactions on Systems, Man, and Cybernetics-Part C, 32(1), 1-13.
    • (2002) IEEE Transactions on Systems, Man, and Cybernetics-Part C , vol.32 , Issue.1 , pp. 1-13
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 24
    • 0037410965 scopus 로고    scopus 로고
    • A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
    • Kim, Y., Park, K., & Ko, J. (2003). A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research, 30, 1151-1171.
    • (2003) Computers and Operations Research , vol.30 , pp. 1151-1171
    • Kim, Y.1    Park, K.2    Ko, J.3
  • 25
    • 60649093066 scopus 로고    scopus 로고
    • Heuristic factory planning algorithm for advanced planning and scheduling
    • Kung, L.-C., & Chern, C.-C. (2009). Heuristic factory planning algorithm for advanced planning and scheduling. Computers & Operations Research, 36(9), 2513-2530.
    • (2009) Computers & Operations Research , vol.36 , Issue.9 , pp. 2513-2530
    • Kung, L.-C.1    Chern, C.-C.2
  • 26
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • Lee, C. Y., & Chen, Z. L. (2001). Machine scheduling with transportation considerations. Journal of Scheduling, 4, 3-24.
    • (2001) Journal of Scheduling , vol.4 , pp. 3-24
    • Lee, C.Y.1    Chen, Z.L.2
  • 27
    • 62549156316 scopus 로고    scopus 로고
    • Priority-based genetic algorithm for shortest path routing problem in ospf
    • Lin, L., & Gen, M. (2009a). Priority-based genetic algorithm for shortest path routing problem in OSPF. Studies in Computational Intelligence, 187, 91-103.
    • (2009) Studies in Computational Intelligence , vol.187 , pp. 91-103
    • Lin, L.1    Gen, M.2
  • 28
    • 55549088896 scopus 로고    scopus 로고
    • Auto-Tuning strategy for evolutionary algorithms: Balancing between exploration and exploitation
    • Lin, L., & Gen, M. (2009b). Auto-Tuning strategy for evolutionary algorithms: Balancing between exploration and exploitation. Soft Computing, 13(2), 157-168.
    • (2009) Soft Computing , vol.13 , Issue.2 , pp. 157-168
    • Lin, L.1    Gen, M.2
  • 29
    • 33747743029 scopus 로고    scopus 로고
    • Network model and effective evolutionary approach for agv dispatching in manufacturing system
    • Lin, L., Shinn, S. W., Gen, M., & Hwang, H. (2006). Network model and effective evolutionary approach for AGV dispatching in manufacturing system. Journal of Intelligent Manufacturing, 17(4), 465-477.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.4 , pp. 465-477
    • Lin, L.1    Shinn, S.W.2    Gen, M.3    Hwang, H.4
  • 30
    • 21144431907 scopus 로고    scopus 로고
    • A step-based manufacturing information system to share flexible manufacturing resources data
    • Lopez, O., & Ramirez, M. (2005). A STEP-based manufacturing information system to share flexible manufacturing resources data. Journal of Intelligent Manufacturing, 16(3), 287-301.
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.3 , pp. 287-301
    • Lopez, O.1    Ramirez, M.2
  • 33
    • 3142777327 scopus 로고    scopus 로고
    • Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
    • Moon, C., Kim, J. S., & Gen, M. (2004). Advanced planning and scheduling based on precedence and resource constraints for e-plant chains. International Journal of Production Research, 42(15), 2941-2955.
    • (2004) International Journal of Production Research , vol.42 , Issue.15 , pp. 2941-2955
    • Moon, C.1    Kim, J.S.2    Gen, M.3
  • 35
    • 17444396374 scopus 로고    scopus 로고
    • An advanced tabu search algorithm for the job-shop problem
    • Nowicki, E., & Smutnicki, C. (2005). An advanced tabu search algorithm for the job-shop problem. Journal of Scheduling, 8(2), 145-159.
    • (2005) Journal of Scheduling , vol.8 , Issue.2 , pp. 145-159
    • Nowicki, E.1    Smutnicki, C.2
  • 38
    • 33747708081 scopus 로고    scopus 로고
    • Integrated data structure and scheduling approach for manufacturing and transportation using hybrid multistage operation-based genetic algorithm
    • Okamoto, A., Gen, M., & Sugawara, M. (2006a). Integrated data structure and scheduling approach for manufacturing and transportation using hybrid multistage operation-based genetic algorithm. Journal of Intelligent Manufacturing, 17, 411-421.
    • (2006) Journal of Intelligent Manufacturing , vol.17 , pp. 411-421
    • Okamoto, A.1    Gen, M.2    Sugawara, M.3
  • 39
    • 79951835710 scopus 로고    scopus 로고
    • Integrated scheduling problem of manufacturing & transportation with pickup & delivery
    • Okamoto, A., Gen,M.,&Sugawara, M. (2006b). Integrated scheduling problem of manufacturing & transportation with pickup & delivery. International Journal of Logistics andSCMSystems, 1, 19-27.
    • (2006) International Journal of Logistics andSCMSystems , vol.1 , pp. 19-27
    • Okamoto, A.1    Gen, M.2    Sugawara, M.3
  • 40
    • 17444375349 scopus 로고    scopus 로고
    • A robust dynamic planning strategy for lot-sizing problems with stochastic demands
    • Raa, B., & Aghezzaf, E. H. (2005). A robust dynamic planning strategy for lot-sizing problems with stochastic demands. Journal of Intelligent Manufacturing, 16(2), 207-213.
    • (2005) Journal of Intelligent Manufacturing , vol.16 , Issue.2 , pp. 207-213
    • Raa, B.1    Aghezzaf, E.H.2
  • 43
    • 0033885605 scopus 로고    scopus 로고
    • Integration of process planning and scheduling -A review
    • Tan, W. (2000). Integration of process planning and scheduling -A review. Journal of Intelligent Manufacturing, 11(1), 51-63.
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.1 , pp. 51-63
    • Tan, W.1
  • 44
    • 4344620927 scopus 로고    scopus 로고
    • A linearized polynomial mixed integer programming model for the integration of process planning and scheduling
    • Tan, W. (2004). A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. Journal of Intelligent Manufacturing, 15(5), 593-605.
    • (2004) Journal of Intelligent Manufacturing , vol.15 , Issue.5 , pp. 593-605
    • Tan, W.1
  • 46
    • 49249099572 scopus 로고    scopus 로고
    • Integrated operational planning and medium-Term scheduling for largescale industrial batch plants
    • Verderame, P. M., & Christodoulos, A. F. (2008). Integrated operational planning and medium-Term scheduling for largescale industrial batch plants. Industrial & Engineering Chemistry Research, 47(14), 4845-4860.
    • (2008) Industrial & Engineering Chemistry Research , vol.47 , Issue.14 , pp. 4845-4860
    • Verderame, P.M.1    Christodoulos, A.F.2
  • 47
    • 44949261129 scopus 로고    scopus 로고
    • Modeling semiconductor testing job scheduling and dynamic testing machine configuration
    • Wu, Z., & Chien, C. F. (2008). Modeling semiconductor testing job scheduling and dynamic testing machine configuration. Expert Systems with Applications, 35(1), 485-496.
    • (2008) Expert Systems with Applications , vol.35 , Issue.1 , pp. 485-496
    • Wu, Z.1    Chien, C.F.2
  • 48
    • 17444376021 scopus 로고    scopus 로고
    • Multiagent scheduling method with earliness and tardiness objectives in flexible job shops
    • Wu, Z., & Weng, M. X. (2005). Multiagent scheduling method with earliness and tardiness objectives in flexible job shops. IEEE Transactions on System,Man, and Cybernetics-Part B, 35(2), 293-301.
    • (2005) IEEE Transactions on System,Man, and Cybernetics-Part B , vol.35 , Issue.2 , pp. 293-301
    • Wu, Z.1    Weng, M.X.2
  • 49
    • 14044268702 scopus 로고    scopus 로고
    • An effective hybrid optimization approach for muti-objective flexible job-shop scheduling problem
    • Xia, W., & Wu, Z. (2005). An effective hybrid optimization approach for muti-objective flexible job-shop scheduling problem. Computers & Industrial Engineering, 48, 409-425.
    • (2005) Computers & Industrial Engineering , vol.48 , pp. 409-425
    • Xia, W.1    Wu, Z.2
  • 50
    • 0033742040 scopus 로고    scopus 로고
    • Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling
    • Yang, S., & Wang, D. (2000). Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling. IEEE Transactions on Neural Networks, 11(2), 474-486.
    • (2000) IEEE Transactions on Neural Networks , vol.11 , Issue.2 , pp. 474-486
    • Yang, S.1    Wang, D.2
  • 51
    • 33747735942 scopus 로고    scopus 로고
    • Multistage-based genetic algorithm for flexible job-shop scheduling problem
    • Zhang, H., & Gen, M. (2005). Multistage-based genetic algorithm for flexible job-shop scheduling problem. Journal of Complexity International, 11, 223-232.
    • (2005) Journal of Complexity International , vol.11 , pp. 223-232
    • Zhang, H.1    Gen, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.