-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams, J., Balas, E., & Zawack, D. (1988). The shifting bottleneck procedure for job shop scheduling. Management Science, 34, 391-401.
-
(1988)
Management Science
, vol.34
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0002381223
-
Machine scheduling via disjunctive graphs: An implicit enumeration algorithm
-
Balas, E. (1969). Machine scheduling via disjunctive graphs: An implicit enumeration algorithm. Operation Research, 17, 941-957.
-
(1969)
Operation Research
, vol.17
, pp. 941-957
-
-
Balas, E.1
-
5
-
-
67349263022
-
A theoretic and practical framework for scheduling in a stochastic environment
-
Bidot, J., Vidal, T., Laborie, P., & Beck, J. C. (2009). A theoretic and practical framework for scheduling in a stochastic environment. Journal of Scheduling, 12(3), 315-344.
-
(2009)
Journal of Scheduling
, vol.12
, Issue.3
, pp. 315-344
-
-
Bidot, J.1
Vidal, T.2
Laborie, P.3
Beck, J.C.4
-
6
-
-
56349117292
-
A memetic algorithm with dynamic population management for an integrated production-distribution problem
-
Boudia, M., & Prins, C. (2009). A memetic algorithm with dynamic population management for an integrated production-distribution problem. European Journal of Operational Research, 195(3), 703-715.
-
(2009)
European Journal of Operational Research
, vol.195
, Issue.3
, pp. 703-715
-
-
Boudia, M.1
Prins, C.2
-
7
-
-
34250084648
-
Routing and scheduling in a flexible job shop by tabu search
-
Brandimarte, P. (1993). Routing and scheduling in a flexible job shop by tabu search. Annals of Operations Research, 41, 157-183.
-
(1993)
Annals of Operations Research
, vol.41
, pp. 157-183
-
-
Brandimarte, P.1
-
8
-
-
0025531716
-
Job-shop scheduling with multi-purpose machines
-
Bruker, P., & Schlie, R. (1990). Job-shop scheduling with multi-purpose machines. Computing, 45, 369-375.
-
(1990)
Computing
, vol.45
, pp. 369-375
-
-
Bruker, P.1
Schlie, R.2
-
9
-
-
0030242695
-
A tutorial survey of jobshop scheduling problems using genetic algorithm, Part I: Representation
-
Cheng, R., Gen, M., & Tsujimura, Y. (1996). A tutorial survey of jobshop scheduling problems using genetic algorithm, Part I: Representation. Computers and Industrial Engineering, 30(4), 983-997.
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 983-997
-
-
Cheng, R.1
Gen, M.2
Tsujimura, Y.3
-
10
-
-
0032592184
-
A tutorial survey of job-shop scheduling problems using genetic algorithms, Part II: Hybrid genetic search strategies
-
Cheng, R., Gen, M., & Tsujimura, Y. (1999). A tutorial survey of job-shop scheduling problems using genetic algorithms, part II: Hybrid genetic search strategies. Computers and Industrial Engineering, 36(2), 343-364.
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.2
, pp. 343-364
-
-
Cheng, R.1
Gen, M.2
Tsujimura, Y.3
-
11
-
-
0026154176
-
Temporal constraint networks
-
Dechter, R., Meiri, I., & Pearl, J. (1991). Temporal constraint networks. Artificial Intelligence, 49(1-3), 61-95.
-
(1991)
Artificial Intelligence
, vol.49
, Issue.1-3
, pp. 61-95
-
-
Dechter, R.1
Meiri, I.2
Pearl, J.3
-
12
-
-
0034501331
-
A genetic algorithm to solve the general multi-level lot-sizing problem with timevarying costs
-
Dellaert, N., Jeunet, J., & Jornard, N. (2000). A genetic algorithm to solve the general multi-level lot-sizing problem with timevarying costs. International Journal of Production Economy, 68, 241-257.
-
(2000)
International Journal of Production Economy
, vol.68
, pp. 241-257
-
-
Dellaert, N.1
Jeunet, J.2
Jornard, N.3
-
15
-
-
0001947856
-
Probabilistic learning combinations of local jobshop scheduling rules
-
J. F. Muth & G. L. Thompson (Eds.). Englewood Cliffs: Prentice Hall
-
Fisher, H. (1963). Probabilistic learning combinations of local jobshop scheduling rules. In J. F. Muth & G. L. Thompson (Eds.), Industrial scheduling (pp. 225-251). Englewood Cliffs: Prentice Hall.
-
(1963)
Industrial Scheduling
, pp. 225-251
-
-
Fisher, H.1
-
16
-
-
2442583184
-
Continuous-Time versus discrete-Time approaches for scheduling of chemical processes: A review
-
Floudas, C. A., & Lin, X. (2004). Continuous-Time versus discrete-Time approaches for scheduling of chemical processes: A review. Computers & Chemical Engineering, 28, 2109.
-
(2004)
Computers & Chemical Engineering
, vol.28
, pp. 2109
-
-
Floudas, C.A.1
Lin, X.2
-
17
-
-
25144491255
-
Mixed integer linear programming in process scheduling: Modeling, algorithms, and applications
-
Floudas, C. A., & Lin, X. (2005). Mixed integer linear programming in process scheduling: Modeling, algorithms, and applications. Annals of Operations Research, 139, 131.
-
(2005)
Annals of Operations Research
, vol.139
, pp. 131
-
-
Floudas, C.A.1
Lin, X.2
-
19
-
-
60549100127
-
Evolutionary techniques for optimization problems in integrated manufacturing system: State-of-The-Art-survey
-
Gen, M., Lin, L., & Zhang, H. (2009). Evolutionary techniques for optimization problems in integrated manufacturing system: State-of-The-Art- survey. Computers and Industrial Engineering, 56(3), 779-808.
-
(2009)
Computers and Industrial Engineering
, vol.56
, Issue.3
, pp. 779-808
-
-
Gen, M.1
Lin, L.2
Zhang, H.3
-
21
-
-
57149129406
-
Effective designing chromosome for optimizing advanced planning and scheduling
-
November. C. H. Dagli, et al. (Eds.). New York: ASME Press
-
Gen, M., & Zhang, H. (2006, November). Effective designing chromosome for optimizing advanced planning and scheduling. In C. H. Dagli, et al. (Eds.), Intelligent engineering systems through artificial neural networks (Vol. 16, pp. 61-66). New York: ASME Press.
-
(2006)
Intelligent Engineering Systems Through Artificial Neural Networks
, vol.16
, pp. 61-66
-
-
Gen, M.1
Zhang, H.2
-
22
-
-
0028408966
-
Dispatching rules in scheduling: A fuzzy approach
-
Grabot, B., & Geneste, L. (1994). Dispatching rules in scheduling: A fuzzy approach. International Journal of Production Research, 32(4), 903-915.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.4
, pp. 903-915
-
-
Grabot, B.1
Geneste, L.2
-
23
-
-
0036464279
-
Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems
-
Kacem, I., Hammadi, S., & Borne, P. (2002). Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems. IEEE Transactions on Systems, Man, and Cybernetics-Part C, 32(1), 1-13.
-
(2002)
IEEE Transactions on Systems, Man, and Cybernetics-Part C
, vol.32
, Issue.1
, pp. 1-13
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
24
-
-
0037410965
-
A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
-
Kim, Y., Park, K., & Ko, J. (2003). A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Computers and Operations Research, 30, 1151-1171.
-
(2003)
Computers and Operations Research
, vol.30
, pp. 1151-1171
-
-
Kim, Y.1
Park, K.2
Ko, J.3
-
25
-
-
60649093066
-
Heuristic factory planning algorithm for advanced planning and scheduling
-
Kung, L.-C., & Chern, C.-C. (2009). Heuristic factory planning algorithm for advanced planning and scheduling. Computers & Operations Research, 36(9), 2513-2530.
-
(2009)
Computers & Operations Research
, vol.36
, Issue.9
, pp. 2513-2530
-
-
Kung, L.-C.1
Chern, C.-C.2
-
26
-
-
0344427189
-
Machine scheduling with transportation considerations
-
Lee, C. Y., & Chen, Z. L. (2001). Machine scheduling with transportation considerations. Journal of Scheduling, 4, 3-24.
-
(2001)
Journal of Scheduling
, vol.4
, pp. 3-24
-
-
Lee, C.Y.1
Chen, Z.L.2
-
27
-
-
62549156316
-
Priority-based genetic algorithm for shortest path routing problem in ospf
-
Lin, L., & Gen, M. (2009a). Priority-based genetic algorithm for shortest path routing problem in OSPF. Studies in Computational Intelligence, 187, 91-103.
-
(2009)
Studies in Computational Intelligence
, vol.187
, pp. 91-103
-
-
Lin, L.1
Gen, M.2
-
28
-
-
55549088896
-
Auto-Tuning strategy for evolutionary algorithms: Balancing between exploration and exploitation
-
Lin, L., & Gen, M. (2009b). Auto-Tuning strategy for evolutionary algorithms: Balancing between exploration and exploitation. Soft Computing, 13(2), 157-168.
-
(2009)
Soft Computing
, vol.13
, Issue.2
, pp. 157-168
-
-
Lin, L.1
Gen, M.2
-
29
-
-
33747743029
-
Network model and effective evolutionary approach for agv dispatching in manufacturing system
-
Lin, L., Shinn, S. W., Gen, M., & Hwang, H. (2006). Network model and effective evolutionary approach for AGV dispatching in manufacturing system. Journal of Intelligent Manufacturing, 17(4), 465-477.
-
(2006)
Journal of Intelligent Manufacturing
, vol.17
, Issue.4
, pp. 465-477
-
-
Lin, L.1
Shinn, S.W.2
Gen, M.3
Hwang, H.4
-
30
-
-
21144431907
-
A step-based manufacturing information system to share flexible manufacturing resources data
-
Lopez, O., & Ramirez, M. (2005). A STEP-based manufacturing information system to share flexible manufacturing resources data. Journal of Intelligent Manufacturing, 16(3), 287-301.
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.3
, pp. 287-301
-
-
Lopez, O.1
Ramirez, M.2
-
31
-
-
0035719796
-
An integrated greedy heuristic for a flexible job shop scheduling problem
-
Mati, Y., Rezg, N., & Xie, X. (2001). An integrated greedy heuristic for a flexible job shop scheduling problem. IEEE International Conference on Systems, Man, and Cybernetics, 4, 2534-2539.
-
(2001)
IEEE International Conference on Systems, Man, and Cybernetics
, vol.4
, pp. 2534-2539
-
-
Mati, Y.1
Rezg, N.2
Xie, X.3
-
33
-
-
3142777327
-
Advanced planning and scheduling based on precedence and resource constraints for e-plant chains
-
Moon, C., Kim, J. S., & Gen, M. (2004). Advanced planning and scheduling based on precedence and resource constraints for e-plant chains. International Journal of Production Research, 42(15), 2941-2955.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.15
, pp. 2941-2955
-
-
Moon, C.1
Kim, J.S.2
Gen, M.3
-
34
-
-
0038269297
-
A modified simulated annealing method for flexible job shop scheduling problem
-
Najid, N. M., Dauzere-Peres, S., & Zaidat, A. (2002). A modified simulated annealing method for flexible job shop scheduling problem. IEEE International Conference on Systems, Man and Cybernetics, 5(6).
-
(2002)
IEEE International Conference on Systems, Man and Cybernetics
, vol.5
, pp. 6
-
-
Najid, N.M.1
Dauzere-Peres, S.2
Zaidat, A.3
-
35
-
-
17444396374
-
An advanced tabu search algorithm for the job-shop problem
-
Nowicki, E., & Smutnicki, C. (2005). An advanced tabu search algorithm for the job-shop problem. Journal of Scheduling, 8(2), 145-159.
-
(2005)
Journal of Scheduling
, vol.8
, Issue.2
, pp. 145-159
-
-
Nowicki, E.1
Smutnicki, C.2
-
37
-
-
33747701943
-
Aps system based on scheduler moga & xml
-
in Jaanese
-
Okamoto, A., Gen, M., & Sugawara, M. (2005b). APS system based on scheduler moGA & XML. Journal of the Society of Plant Engineers Japan, 17(2), 15-24 (in Japanese).
-
(2005)
Journal of the Society of Plant Engineers Japan
, vol.17
, Issue.2
, pp. 15-24
-
-
Okamoto, A.1
Gen, M.2
Sugawara, M.3
-
38
-
-
33747708081
-
Integrated data structure and scheduling approach for manufacturing and transportation using hybrid multistage operation-based genetic algorithm
-
Okamoto, A., Gen, M., & Sugawara, M. (2006a). Integrated data structure and scheduling approach for manufacturing and transportation using hybrid multistage operation-based genetic algorithm. Journal of Intelligent Manufacturing, 17, 411-421.
-
(2006)
Journal of Intelligent Manufacturing
, vol.17
, pp. 411-421
-
-
Okamoto, A.1
Gen, M.2
Sugawara, M.3
-
39
-
-
79951835710
-
Integrated scheduling problem of manufacturing & transportation with pickup & delivery
-
Okamoto, A., Gen,M.,&Sugawara, M. (2006b). Integrated scheduling problem of manufacturing & transportation with pickup & delivery. International Journal of Logistics andSCMSystems, 1, 19-27.
-
(2006)
International Journal of Logistics andSCMSystems
, vol.1
, pp. 19-27
-
-
Okamoto, A.1
Gen, M.2
Sugawara, M.3
-
40
-
-
17444375349
-
A robust dynamic planning strategy for lot-sizing problems with stochastic demands
-
Raa, B., & Aghezzaf, E. H. (2005). A robust dynamic planning strategy for lot-sizing problems with stochastic demands. Journal of Intelligent Manufacturing, 16(2), 207-213.
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, Issue.2
, pp. 207-213
-
-
Raa, B.1
Aghezzaf, E.H.2
-
41
-
-
0003404021
-
-
Note D.S. no.9 bis, SEMA, Paris, France
-
Roy, B., & Sussmann, B. (1964). Les problems d'ordonnancement avec contraintes disjunctives. Note D.S. no.9 bis, SEMA, Paris, France.
-
(1964)
Les Problems D'ordonnancement Avec Contraintes Disjunctives
-
-
Roy, B.1
Sussmann, B.2
-
42
-
-
5144221178
-
Complexity of flow shop scheduling problems with transportation constraints
-
Soukhal, A., Oulamara, A.,&Martineau, P. (2005). Complexity of flow shop scheduling problems with transportation constraints. European Journal of Operational Research, 161, 32-41.
-
(2005)
European Journal of Operational Research
, vol.161
, pp. 32-41
-
-
Soukhal, A.1
Oulamara, A.2
Martineau, P.3
-
43
-
-
0033885605
-
Integration of process planning and scheduling -A review
-
Tan, W. (2000). Integration of process planning and scheduling -A review. Journal of Intelligent Manufacturing, 11(1), 51-63.
-
(2000)
Journal of Intelligent Manufacturing
, vol.11
, Issue.1
, pp. 51-63
-
-
Tan, W.1
-
44
-
-
4344620927
-
A linearized polynomial mixed integer programming model for the integration of process planning and scheduling
-
Tan, W. (2004). A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. Journal of Intelligent Manufacturing, 15(5), 593-605.
-
(2004)
Journal of Intelligent Manufacturing
, vol.15
, Issue.5
, pp. 593-605
-
-
Tan, W.1
-
45
-
-
26844467313
-
A hybrid method for solving stochastic job shop scheduling problems
-
Tavakkoli-Moghaddam, R., Jolai, F., Vaziri, F., Ahmed, P.K., & Azaron, A. (2005). A hybrid method for solving stochastic job shop scheduling problems. Applied Mathematics and Computation, 170(1), 185-206.
-
(2005)
Applied Mathematics and Computation
, vol.170
, Issue.1
, pp. 185-206
-
-
Tavakkoli-Moghaddam, R.1
Jolai, F.2
Vaziri, F.3
Ahmed, P.K.4
Azaron, A.5
-
46
-
-
49249099572
-
Integrated operational planning and medium-Term scheduling for largescale industrial batch plants
-
Verderame, P. M., & Christodoulos, A. F. (2008). Integrated operational planning and medium-Term scheduling for largescale industrial batch plants. Industrial & Engineering Chemistry Research, 47(14), 4845-4860.
-
(2008)
Industrial & Engineering Chemistry Research
, vol.47
, Issue.14
, pp. 4845-4860
-
-
Verderame, P.M.1
Christodoulos, A.F.2
-
47
-
-
44949261129
-
Modeling semiconductor testing job scheduling and dynamic testing machine configuration
-
Wu, Z., & Chien, C. F. (2008). Modeling semiconductor testing job scheduling and dynamic testing machine configuration. Expert Systems with Applications, 35(1), 485-496.
-
(2008)
Expert Systems with Applications
, vol.35
, Issue.1
, pp. 485-496
-
-
Wu, Z.1
Chien, C.F.2
-
48
-
-
17444376021
-
Multiagent scheduling method with earliness and tardiness objectives in flexible job shops
-
Wu, Z., & Weng, M. X. (2005). Multiagent scheduling method with earliness and tardiness objectives in flexible job shops. IEEE Transactions on System,Man, and Cybernetics-Part B, 35(2), 293-301.
-
(2005)
IEEE Transactions on System,Man, and Cybernetics-Part B
, vol.35
, Issue.2
, pp. 293-301
-
-
Wu, Z.1
Weng, M.X.2
-
49
-
-
14044268702
-
An effective hybrid optimization approach for muti-objective flexible job-shop scheduling problem
-
Xia, W., & Wu, Z. (2005). An effective hybrid optimization approach for muti-objective flexible job-shop scheduling problem. Computers & Industrial Engineering, 48, 409-425.
-
(2005)
Computers & Industrial Engineering
, vol.48
, pp. 409-425
-
-
Xia, W.1
Wu, Z.2
-
50
-
-
0033742040
-
Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling
-
Yang, S., & Wang, D. (2000). Constraint satisfaction adaptive neural network and heuristics combined approaches for generalized job-shop scheduling. IEEE Transactions on Neural Networks, 11(2), 474-486.
-
(2000)
IEEE Transactions on Neural Networks
, vol.11
, Issue.2
, pp. 474-486
-
-
Yang, S.1
Wang, D.2
-
51
-
-
33747735942
-
Multistage-based genetic algorithm for flexible job-shop scheduling problem
-
Zhang, H., & Gen, M. (2005). Multistage-based genetic algorithm for flexible job-shop scheduling problem. Journal of Complexity International, 11, 223-232.
-
(2005)
Journal of Complexity International
, vol.11
, pp. 223-232
-
-
Zhang, H.1
Gen, M.2
|