-
2
-
-
0012501920
-
"Classical and Flexible Job Shop Scheduling by Tabu Search"
-
Ph.D. dissertation, Univ. Texas at Austin, Austin, TX
-
J. B. Chambers, "Classical and Flexible Job Shop Scheduling by Tabu Search," Ph.D. dissertation, Univ. Texas at Austin, Austin, TX, 1996.
-
(1996)
-
-
Chambers, J.B.1
-
3
-
-
0002577337
-
"Effective neighborhood functions for the flexible job shop problem"
-
M. Mastrolilli and L. M. Gambardella, "Effective neighborhood functions for the flexible job shop problem," J. Sched., vol. 3, pp. 3-20, 2000.
-
(2000)
J. Sched.
, vol.3
, pp. 3-20
-
-
Mastrolilli, M.1
Gambardella, L.M.2
-
4
-
-
0037146442
-
"Linguistic-based meta-heuristic optimization model for flexible job shop scheduling"
-
A. Baykasoglu, "Linguistic-based meta-heuristic optimization model for flexible job shop scheduling," Int. J. Prod. Res., vol. 40, pp. 4523-4543, 2002.
-
(2002)
Int. J. Prod. Res.
, vol.40
, pp. 4523-4543
-
-
Baykasoglu, A.1
-
5
-
-
0036464279
-
"Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems"
-
Feb
-
I. Kacem, S. Hammadi, and P. Borne, "Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems," IEEE Trans. Syst., Man, Cybern. C, Appl. Rev. vol. 31, no. 1, pp. 1-13, Feb. 2002.
-
(2002)
IEEE Trans. Syst., Man, Cybern. C, Appl. Rev.
, vol.31
, Issue.1
, pp. 1-13
-
-
Kacem, I.1
Hammadi, S.2
Borne, P.3
-
6
-
-
79251627866
-
"A progressive approach for the integration of process planning and scheduling"
-
S. H. Huang, H. Zhang, and M. L. Smith, "A progressive approach for the integration of process planning and scheduling," IIE Trans., vol. 27, pp. 456-464, 1995.
-
(1995)
IIE Trans.
, vol.27
, pp. 456-464
-
-
Huang, S.H.1
Zhang, H.2
Smith, M.L.3
-
7
-
-
0036165350
-
"Concurrent process planning and scheduling in distributed virtual manufacturing"
-
S. H. Wu, J. Y. H. Fuh, and A. Y. C. Nee, "Concurrent process planning and scheduling in distributed virtual manufacturing," IIE Trans., vol. 34, pp. 77-89, 2002.
-
(2002)
IIE Trans.
, vol.34
, pp. 77-89
-
-
Wu, S.H.1
Fuh, J.Y.H.2
Nee, A.Y.C.3
-
8
-
-
0033341387
-
"Scheduling with alternatives: A link between process planning and scheduling"
-
A. J. Weintraub, D. Cormier, T. J. Hodgson, R. E. King, J. Wilson, and A. Zozom Jr., "Scheduling with alternatives: A link between process planning and scheduling," IIE Trans., vol. 31, pp. 1093-1102, 1999.
-
(1999)
IIE Trans.
, vol.31
, pp. 1093-1102
-
-
Weintraub, A.J.1
Cormier, D.2
Hodgson, T.J.3
King, R.E.4
Wilson, J.5
Zozom Jr., A.6
-
9
-
-
0034627943
-
"Workshop scheduling using practical (inaccurate) data-Part 3: A framework to integrate job release, routing and scheduling functions to create a robust predictive schedule"
-
R. Shafaei and P. Brunn, "Workshop scheduling using practical (inaccurate) data-Part 3: A framework to integrate job release, routing and scheduling functions to create a robust predictive schedule," Int. J. Prod. Res., vol. 38, pp. 85-99, 2000.
-
(2000)
Int. J. Prod. Res.
, vol.38
, pp. 85-99
-
-
Shafaei, R.1
Brunn, P.2
-
10
-
-
0030216517
-
"Multi-agent mediator architecture for distributed manufacturing"
-
F. Maturana and D. H. Norde, "Multi-agent mediator architecture for distributed manufacturing," J. Intell. Manuf., vol. 7, pp. 257-270, 1996.
-
(1996)
J. Intell. Manuf.
, vol.7
, pp. 257-270
-
-
Maturana, F.1
Norde, D.H.2
-
11
-
-
0033132543
-
"Design of negotiation protocols for multi-agent manufacturing systems"
-
N. K. C. Krothapalli and A. V. Deshmukh, "Design of negotiation protocols for multi-agent manufacturing systems," Int. J. Prod. Res. vol. 37, pp. 1601-1624, 1999.
-
(1999)
Int. J. Prod. Res.
, vol.37
, pp. 1601-1624
-
-
Krothapalli, N.K.C.1
Deshmukh, A.V.2
-
12
-
-
0031142080
-
"Coordination mechanisms for multi-agent manufacturing systems: Applications to integrated manufacturing scheduling"
-
May
-
R. Sikora and M. J. Shaw, "Coordination mechanisms for multi-agent manufacturing systems: Applications to integrated manufacturing scheduling," IEEE Trans. Eng. Manage., vol. 44, no. 2, pp. 175-187, May 1997.
-
(1997)
IEEE Trans. Eng. Manage.
, vol.44
, Issue.2
, pp. 175-187
-
-
Sikora, R.1
Shaw, M.J.2
-
13
-
-
0035838752
-
"An agent-based production control framework for multiple-line collaborative manufacturing"
-
T. P. Lu and Y. Yih, "An agent-based production control framework for multiple-line collaborative manufacturing," Int. J. Prod. Res., vol. 39, pp. 2155-2176, 2001.
-
(2001)
Int. J. Prod. Res.
, vol.39
, pp. 2155-2176
-
-
Lu, T.P.1
Yih, Y.2
-
14
-
-
85008031856
-
"Performance evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems"
-
A. Saad, K. Kawamura, and G. Biswas, "Performance evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems," Intell. Autom. Soft Comput., vol. 3, pp. 229-248, 1997.
-
(1997)
Intell. Autom. Soft Comput.
, vol.3
, pp. 229-248
-
-
Saad, A.1
Kawamura, K.2
Biswas, G.3
-
15
-
-
0141885118
-
"Negotiation-based routing in job shops via collaborative agents"
-
J. M. Usher, "Negotiation-based routing in job shops via collaborative agents," J. Intell. Manuf., vol. 14, pp. 485-499, 2003.
-
(2003)
J. Intell. Manuf.
, vol.14
, pp. 485-499
-
-
Usher, J.M.1
-
16
-
-
0002414592
-
"Defining critical elements in JIT implementation: A survey"
-
Z. Zhu and P. H. Meredith, "Defining critical elements in JIT implementation: A survey," Ind. Manage. Data Syst., vol. 95, pp. 21-28, 1995.
-
(1995)
Ind. Manage. Data Syst.
, vol.95
, pp. 21-28
-
-
Zhu, Z.1
Meredith, P.H.2
-
17
-
-
0025211593
-
"Sequencing with earliness and tardiness penalties: A review"
-
K. R. Baker and G. D. Scudder, "Sequencing with earliness and tardiness penalties: A review," Oper. Res., vol. 38, pp. 22-36, 1990.
-
(1990)
Oper. Res.
, vol.38
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
18
-
-
0036507578
-
"Optimal idle time insertion in early-tardy parallel machines scheduling with precedence constraints"
-
F. D. Croce and M. Trubian, "Optimal idle time insertion in early-tardy parallel machines scheduling with precedence constraints," Prod. Plan. Control, vol. 13, pp. 133-142, 2002.
-
(2002)
Prod. Plan. Control
, vol.13
, pp. 133-142
-
-
Croce, F.D.1
Trubian, M.2
-
19
-
-
0037290066
-
"Single machine scheduling with symmetric earliness and tardiness penalties"
-
J. A. Ventura and S. Radhakrishnan, "Single machine scheduling with symmetric earliness and tardiness penalties," Eur. J. Oper. Res., vol. 144, pp. 598-612, 2003.
-
(2003)
Eur. J. Oper. Res.
, vol.144
, pp. 598-612
-
-
Ventura, J.A.1
Radhakrishnan, S.2
-
20
-
-
0032095739
-
"Minimizing the sum of job earliness and tardiness in a multimachine system"
-
R. B. Heady and Z. Zhu, "Minimizing the sum of job earliness and tardiness in a multimachine system," Int. J. Prod. Res., vol. 36, pp. 1619-1632, 1998.
-
(1998)
Int. J. Prod. Res.
, vol.36
, pp. 1619-1632
-
-
Heady, R.B.1
Zhu, Z.2
-
21
-
-
0034228084
-
"Minimizing the sum of earliness/tardiness in multi-machine scheduling: A mixed integer programming approach"
-
Z. Zhu and R. B. Heady, "Minimizing the sum of earliness/tardiness in multi-machine scheduling: A mixed integer programming approach," Comput. Ind. Eng., vol. 38, pp. 297-305, 2000.
-
(2000)
Comput. Ind. Eng.
, vol.38
, pp. 297-305
-
-
Zhu, Z.1
Heady, R.B.2
-
22
-
-
0036722157
-
"Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling"
-
S. H. Yoon and J. A. Ventura, "Minimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling," Comput. Oper. Res., vol. 29, pp. 1301-1315, 2002.
-
(2002)
Comput. Oper. Res.
, vol.29
, pp. 1301-1315
-
-
Yoon, S.H.1
Ventura, J.A.2
-
23
-
-
0038060712
-
"Scheduling unit processing time jobs on an m-machine flow-shop"
-
G. Mosheiov, "Scheduling unit processing time jobs on an m-machine flow-shop," J. Oper. Res. Soc., vol. 54, pp. 437-444, 2003.
-
(2003)
J. Oper. Res. Soc.
, vol.54
, pp. 437-444
-
-
Mosheiov, G.1
-
24
-
-
0041417617
-
"Optimization-based manufacturing scheduling with multiple resources, setup requirements, and transfer lots"
-
D. Chen, P. B. Luh, L. S. Thakur, and J. Moreno Jr., "Optimization-based manufacturing scheduling with multiple resources, setup requirements, and transfer lots," IIE Trans., vol. 35, pp. 973-985, 2003.
-
(2003)
IIE Trans.
, vol.35
, pp. 973-985
-
-
Chen, D.1
Luh, P.B.2
Thakur, L.S.3
Moreno Jr., J.4
-
25
-
-
84987014183
-
"Minimizing absolute and squared deviation of completion times from due dates"
-
B. Alidee, "Minimizing absolute and squared deviation of completion times from due dates," Prod. Oper. Manag., vol. 3, pp. 133-147, 1994.
-
(1994)
Prod. Oper. Manag.
, vol.3
, pp. 133-147
-
-
Alidee, B.1
-
26
-
-
0028734441
-
"Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates"
-
Y. D. Kim and C. A. Yano, "Minimizing mean tardiness and earliness in single-machine scheduling problems with unequal due dates," Nav. Res. Log., vol. 41, pp. 913-933, 1994.
-
(1994)
Nav. Res. Log.
, vol.41
, pp. 913-933
-
-
Kim, Y.D.1
Yano, C.A.2
-
27
-
-
84977334714
-
"Optimal timing schedules in earliness-tardiness single machine sequencing"
-
W. Szwarc and S. K. Mukhopadhyay, "Optimal timing schedules in earliness-tardiness single machine sequencing," Nav. Res. Log., vol. 42, pp. 1109-1114, 1995.
-
(1995)
Nav. Res. Log.
, vol.42
, pp. 1109-1114
-
-
Szwarc, W.1
Mukhopadhyay, S.K.2
-
28
-
-
0032784020
-
"An analysis of heuristics in a dynamic job shop with weighted tardiness objectives"
-
E. Kutanoglu and I. Sabuncuoglu, "An analysis of heuristics in a dynamic job shop with weighted tardiness objectives," Int. J. Prod. Res., vol. 37, pp. 165-187, 1999.
-
(1999)
Int. J. Prod. Res.
, vol.37
, pp. 165-187
-
-
Kutanoglu, E.1
Sabuncuoglu, I.2
-
29
-
-
0034135514
-
"On satisfying due dates in large job shops: Idle time insertion"
-
T. J. Hodgson, R. E. King, K. Thoney, N. Stanislaw, A. J. Weintraub, and A. Zozom Jr., "On satisfying due dates in large job shops: Idle time insertion," IIE Trans., vol. 32, pp. 177-180, 2000.
-
(2000)
IIE Trans.
, vol.32
, pp. 177-180
-
-
Hodgson, T.J.1
King, R.E.2
Thoney, K.3
Stanislaw, N.4
Weintraub, A.J.5
Zozom Jr., A.6
-
30
-
-
0035192727
-
"A heuristic for single machine scheduling with early and tardy costs"
-
R. Mazzini and V. A. Armentano, "A heuristic for single machine scheduling with early and tardy costs," Eur. J. Oper. Res., vol. 128, pp. 129-146, 2001.
-
(2001)
Eur. J. Oper. Res.
, vol.128
, pp. 129-146
-
-
Mazzini, R.1
Armentano, V.A.2
-
31
-
-
0021496929
-
"Sequencing rules and due date assignments in a job shop"
-
K. R. Baker, "Sequencing rules and due date assignments in a job shop," Manage. Sci., vol. 30, pp. 1093-1104, 1984.
-
(1984)
Manage. Sci.
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
|