메뉴 건너뛰기




Volumn 45, Issue 1, 2013, Pages 45-65

Project scheduling: A multi-objective evolutionary algorithm that optimizes the effectiveness of human resources and the project makespan

Author keywords

effectiveness of human resources; human resource assignment; multi objective evolutionary algorithms; multi skilled resources; project scheduling

Indexed keywords

ALGORITHM DESIGN; COMPUTATIONAL EXPERIMENT; FEASIBLE SCHEDULE; MAKESPAN; MULTI OBJECTIVE EVOLUTIONARY ALGORITHMS; MULTI-SKILLED RESOURCES; PARETO SET; PROJECT ACTIVITIES; PROJECT MANAGERS; PROJECT SCHEDULING; PROJECT SCHEDULING PROBLEM; RESOURCE ASSIGNMENT;

EID: 84870912558     PISSN: 0305215X     EISSN: 10290273     Source Type: Journal    
DOI: 10.1080/0305215X.2012.658782     Document Type: Article
Times cited : (28)

References (34)
  • 1
    • 67349180578 scopus 로고    scopus 로고
    • An evolutionary squeaky wheel optimization approach to personnel scheduling
    • Aickelin, U., Burke, E., and, Li, J. 2009. An evolutionary squeaky wheel optimization approach to personnel scheduling. IEEE Transactions on Evolutionary Computation, 13 (2): 433-443.
    • (2009) IEEE Transactions on Evolutionary Computation , vol.13 , Issue.2 , pp. 433-443
    • Aickelin, U.1    Burke, E.2    Li, J.3
  • 2
    • 0041169480 scopus 로고    scopus 로고
    • Relating member ability and personality to work-team processes and team effectiveness. Journal of Applied Psychology
    • Barrick, M. R. 1998. Relating member ability and personality to work-team processes and team effectiveness. Journal of Applied Psychology. et al., 83 (3): 377-391.
    • (1998) Et Al. , vol.83 , Issue.3 , pp. 377-391
    • Barrick, M.R.1
  • 5
    • 33645986632 scopus 로고    scopus 로고
    • Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills
    • Edited by: Burke, E. and Trick, M. sBerlin: Springer
    • Bellenguez, O., and, Néron, E. 2005. Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills. In PATAT 2004, Lecture notes in computer science, Edited by: Burke, E. and Trick, M. Vol. 3616, 229-243. Berlin: Springer.
    • (2005) PATAT 2004, Lecture Notes in Computer Science , vol.3616 , pp. 229-243
    • Bellenguez, O.1    Néron, E.2
  • 6
    • 34547325200 scopus 로고    scopus 로고
    • A branch-and-bound method for solving multi-skill project scheduling problem
    • Bellenguez, O., and, Néron, E. 2007. A branch-and-bound method for solving multi-skill project scheduling problem. RAIROOperations Research, 41 (2): 155-170.
    • (2007) RAIROOperations Research , vol.41 , Issue.2 , pp. 155-170
    • Bellenguez, O.1    Néron, E.2
  • 7
    • 0019342681 scopus 로고
    • Scheduling subject to resource constraints: Classification and complexity
    • Blazewicz, J., Lenstra, J., and, Rinnooy Kan, A. 1983. Scheduling subject to resource constraints: classification and complexity. Discrete Applied Mathematics, 5 (1): 11-24.
    • (1983) Discrete Applied Mathematics , vol.5 , Issue.1 , pp. 11-24
    • Blazewicz, J.1    Lenstra, J.2    Rinnooy Kan, A.3
  • 8
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • Boctor, F. F. 1996. Resource-constrained project scheduling by simulated annealing. International Journal of Production Research, 34 (8): 2335-2351.
    • (1996) International Journal of Production Research , vol.34 , Issue.8 , pp. 2335-2351
    • Boctor, F.F.1
  • 11
    • 33845612806 scopus 로고    scopus 로고
    • Cultural algorithms, an alternative heuristic to solve the job shop scheduling problem
    • Cortés Rivera, D., Landa Becerra, R., and, Coello Coello, C. A. 2007. Cultural algorithms, an alternative heuristic to solve the job shop scheduling problem. Engineering Optimization, 39 (1): 69-85.
    • (2007) Engineering Optimization , vol.39 , Issue.1 , pp. 69-85
    • Cortés Rivera, D.1    Landa Becerra, R.2    Coello Coello, C.A.3
  • 13
    • 38749139204 scopus 로고    scopus 로고
    • A project scheduling problem with labour constraints and time-dependent activities requirements
    • Drezet, L. E., and, Billaut, J. C. 2008. A project scheduling problem with labour constraints and time-dependent activities requirements. International Journal of Production Economics, 112 (1): 217-225.
    • (2008) International Journal of Production Economics , vol.112 , Issue.1 , pp. 217-225
    • Drezet, L.E.1    Billaut, J.C.2
  • 17
    • 52149104922 scopus 로고    scopus 로고
    • Competence-driven project portfolio selection, scheduling and staff assignment
    • Gutjahr, W. J. 2008. Competence-driven project portfolio selection, scheduling and staff assignment. Central European Journal of Operations Research, 16 (3): 281-306.
    • (2008) Central European Journal of Operations Research , vol.16 , Issue.3 , pp. 281-306
    • Gutjahr, W.J.1
  • 18
    • 13544263209 scopus 로고    scopus 로고
    • A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects
    • Hanne, T., and, Nickel, S. 2005. A multiobjective evolutionary algorithm for scheduling and inspection planning in software development projects. European Journal of Operational Research, 167 (3): 663-678.
    • (2005) European Journal of Operational Research , vol.167 , Issue.3 , pp. 663-678
    • Hanne, T.1    Nickel, S.2
  • 19
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • Hartmann, S. 1998. A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics, 45 (7): 733-750.
    • (1998) Naval Research Logistics , vol.45 , Issue.7 , pp. 733-750
    • Hartmann, S.1
  • 21
    • 77349123567 scopus 로고    scopus 로고
    • Scheduling and staffing multiple projects with a multi-skilled workforce
    • Heimerl, C., and, Kolisch, R. 2010. Scheduling and staffing multiple projects with a multi-skilled workforce. OR Spectrum, 32 (4): 343-368.
    • (2010) OR Spectrum , vol.32 , Issue.4 , pp. 343-368
    • Heimerl, C.1    Kolisch, R.2
  • 22
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • Edited by: Weglarz, J. New York: Kluwer Academic
    • Kolisch, R., and, Hartmann, S. 1999. Heuristic algorithms for solving the resource-constrained project scheduling problem: classification and computational analysis. In Project scheduling: recent models, algorithms and applications, Edited by: Weglarz, J. 147-178. New York: Kluwer Academic.
    • (1999) Project Scheduling: Recent Models, Algorithms and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 23
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • Kolisch, R., and, Hartmann, S. 2006. Experimental investigation of heuristics for resource-constrained project scheduling: an update. European Journal of Operational Research, 174 (1): 23-37.
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 25
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • Kolisch, R., Sprecher, A., and, Drexl, A. 1995. Characterization and generation of a general class of resource-constrained project scheduling problems. Management Science, 41 (10): 1693-1703.
    • (1995) Management Science , vol.41 , Issue.10 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 26
    • 33745727034 scopus 로고    scopus 로고
    • Multi-objective optimization using genetic algorithms: A tutorial
    • Konak, A., Coit, D., and, Smith, A. 2006. Multi-objective optimization using genetic algorithms: a tutorial. Reliability Engineering and System Safety, 91 (9): 992-1007.
    • (2006) Reliability Engineering and System Safety , vol.91 , Issue.9 , pp. 992-1007
    • Konak, A.1    Coit, D.2    Smith, A.3
  • 28
    • 67349093890 scopus 로고    scopus 로고
    • Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm
    • Li, H., and, Womer, K. 2009. Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm. Journal of Scheduling, 12 (3): 281-298.
    • (2009) Journal of Scheduling , vol.12 , Issue.3 , pp. 281-298
    • Li, H.1    Womer, K.2
  • 31
    • 79952447681 scopus 로고    scopus 로고
    • Project scheduling optimization in service centre management
    • Valls, V. 2007. Project scheduling optimization in service centre management. Tijdschrift voor Economie en Management, 52 (3): 341-366.
    • (2007) Tijdschrift voor Economie en Management , vol.52 , Issue.3 , pp. 341-366
    • Valls, V.1
  • 33
    • 69649103114 scopus 로고    scopus 로고
    • A resource-constrained assembly job shop scheduling problem with lot streaming technique
    • Wong, T. C., Chan, F. T.S., and, Chan, L. Y. 2009. A resource-constrained assembly job shop scheduling problem with lot streaming technique. Computers and Industrial Engineering, 57 (3): 983-995.
    • (2009) Computers and Industrial Engineering , vol.57 , Issue.3 , pp. 983-995
    • Wong, T.C.1    Chan, F.T.S.2    Chan, L.Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.