메뉴 건너뛰기




Volumn 36, Issue 11, 2012, Pages 94-100

A unit maintenance scheduling model considering peak regulation pressure balance for power system containing wind farms

Author keywords

Grid integration of wind farms; Peak regulation pressure balance; Peak regulation pressure constraint; Peak regulation pressure evaluation criteria; Unit maintenance scheduling

Indexed keywords

PRESSURE BALANCE; PRESSURE CONSTRAINTS; PRESSURE EVALUATION; UNIT MAINTENANCE SCHEDULING; WIND FARM;

EID: 84870732702     PISSN: 10003673     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (11)

References (20)
  • 1
    • 78149290666 scopus 로고    scopus 로고
    • Impact of large-scale wind farm connecting with power grid on peak load regulation demand
    • (in Chinese).
    • Zhang Ning, Zhou Tianrui, Duan Changgang, et al. Impact of large-scale wind farm connecting with power grid on peak load regulation demand[J]. Power System Technology, 2010, 34(1): 152-158 (in Chinese).
    • (2010) Power System Technology , vol.34 , Issue.1 , pp. 152-158
    • Zhang, N.1    Zhou, T.2    Duan, C.3
  • 2
    • 78149354084 scopus 로고    scopus 로고
    • Generation maintenance scheduling with significant wind power penetration
    • (in Chinese).
    • Fang Chen, Xia Qing, Sun Xin. Generation maintenance scheduling with significant wind power penetration[J]. Automation of Electric Power Systems, 2010, 34(19): 20-24 (in Chinese).
    • (2010) Automation of Electric Power Systems , vol.34 , Issue.19 , pp. 20-24
    • Fang, C.1    Xia, Q.2    Sun, X.3
  • 3
    • 0015398090 scopus 로고
    • Adjusting maintenance schedules to levelize risk
    • Garver L L. Adjusting maintenance schedules to levelize risk [J]. IEEE Trans on Power Apparatus and Systems, 1972, 91(5): 2057-2063.
    • (1972) IEEE Trans on Power Apparatus and Systems , vol.91 , Issue.5 , pp. 2057-2063
    • Garver, L.L.1
  • 5
    • 0032592963 scopus 로고    scopus 로고
    • Goal programming approach to maintenance scheduling of generating units in large scale power systems
    • Lucia M M, Andr C R. Goal programming approach to maintenance scheduling of generating units in large scale power systems[J]. IEEE Transactions on Power Systems, 1999, 14(3): 1021-1028.
    • (1999) IEEE Transactions on Power Systems , vol.14 , Issue.3 , pp. 1021-1028
    • Lucia, M.M.1    Andr, C.R.2
  • 7
    • 0032592928 scopus 로고    scopus 로고
    • Long-term transmission and generation maintenance scheduling with network, fuel and emission constraints
    • Marwali M K C, Shahidehpour S M. Long-term transmission and generation maintenance scheduling with network, fuel and emission constraints[J]. IEEE Transactions on Power Systems, 1999, 14(3): 1160-1165.
    • (1999) IEEE Transactions on Power Systems , vol.14 , Issue.3 , pp. 1160-1165
    • Marwali, M.K.C.1    Shahidehpour, S.M.2
  • 8
    • 33747824444 scopus 로고    scopus 로고
    • Hydrothermal generator maintenance scheduling based on credibility theory
    • (in Chinese).
    • Feng Yongqing, Wu Wenchuan, Zhang Boming, et al. Hydrothermal generator maintenance scheduling based on credibility theory [J]. Proceedings of the CSEE, 2006, 26(13): 14-19 (in Chinese).
    • (2006) Proceedings of the CSEE , vol.26 , Issue.13 , pp. 14-19
    • Feng, Y.1    Wu, W.2    Zhang, B.3
  • 9
    • 78651542455 scopus 로고    scopus 로고
    • A minimum power deficiency model for optimization of unit maintenance scheduling
    • (in Chinese).
    • Liao Shengli, Cheng Chuntian, Li Gang, et al. A minimum power deficiency model for optimization of unit maintenance scheduling [J]. Power System Technology, 2010, 34(10): 38-42 (in Chinese).
    • (2010) Power System Technology , vol.34 , Issue.10 , pp. 38-42
    • Liao, S.1    Cheng, C.2    Li, G.3
  • 10
    • 78651525905 scopus 로고    scopus 로고
    • Solving unit maintenance scheduling problem by use of improved ant colony algorithm
    • (in Chinese).
    • Yuan Xiaotao, Yao Jiangang, Chen Liang. Solving unit maintenance scheduling problem by use of improved ant colony algorithm [J]. Power System Technology, 2008, 32(21): 42-46 (in Chinese).
    • (2008) Power System Technology , vol.32 , Issue.21 , pp. 42-46
    • Yuan, X.1    Yao, J.2    Chen, L.3
  • 11
    • 84870759993 scopus 로고    scopus 로고
    • Chinese source
    • 2001.
    • (2001)
  • 12
    • 79959730246 scopus 로고    scopus 로고
    • Generation unit maintenance scheduling based on minimum cumulative risk algorithm for power system containing wind farms
    • (in Chinese).
    • Zhang Jietan, Wang Maochun, Xu Yourui, et al. Generation unit maintenance scheduling based on minimum cumulative risk algorithm for power system containing wind farms[J]. Power System Technology, 2011, 35(5): 97-102 (in Chinese).
    • (2011) Power System Technology , vol.35 , Issue.5 , pp. 97-102
    • Zhang, J.1    Wang, M.2    Xu, Y.3
  • 13
    • 78649614041 scopus 로고    scopus 로고
    • GMS considering uncertainty in wind power in a wind-hydrothermal power system
    • Minneapolis, MN USA: IEEE
    • Yare Y, Venayagamoorthy G K. GMS considering uncertainty in wind power in a wind-hydrothermal power system[C]//IEEE Power and Energy Society General Meeting. Minneapolis, MN USA: IEEE, 2010: 1-7.
    • (2010) IEEE Power and Energy Society General Meeting , pp. 1-7
    • Yare, Y.1    Venayagamoorthy, G.K.2
  • 14
    • 34347235458 scopus 로고    scopus 로고
    • Determination of pumped storage plant capacity with peak regulation proportion
    • (in Chinese).
    • Cao Fang, Zhang Lizi. Determination of pumped storage plant capacity with peak regulation proportion[J]. Electric Power Automation Equipment, 2007, 27(6): 47-59 (in Chinese).
    • (2007) Electric Power Automation Equipment , vol.27 , Issue.6 , pp. 47-59
    • Cao, F.1    Zhang, L.2
  • 15
    • 70350599654 scopus 로고    scopus 로고
    • Power system probabilistic production simulation including wind farms
    • (in Chinese).
    • Zhang Jietan, Cheng Haozhong, Hu Zechun, et al. Power system probabilistic production simulation including wind farms [J]. Proceedings of the CSEE, 2009, 29(28): 34-39 (in Chinese).
    • (2009) Proceedings of the CSEE , vol.29 , Issue.28 , pp. 34-39
    • Zhang, J.1    Cheng, H.2    Hu, Z.3
  • 16
    • 67651064389 scopus 로고    scopus 로고
    • A generator maintenance scheduling model considering unexpected unit failures
    • (in Chinese).
    • Feng Changyou, Wang Xifan, Bie Zhaohong, et al. A generator maintenance scheduling model considering unexpected unit failures [J]. Automation of Electric Power Systems, 2009, 33(13): 32-36 (in Chinese).
    • (2009) Automation of Electric Power Systems , vol.33 , Issue.13 , pp. 32-36
    • Feng, C.1    Wang, X.2    Bie, Z.3
  • 17
    • 11144242416 scopus 로고    scopus 로고
    • Combination of GA and SA for generator maintenance scheduling
    • (in Chinese).
    • Zuo Zhengmin, Wu Yaowu, Xiong Xinyin, et al. Combination of GA and SA for generator maintenance scheduling[J]. International Journal Hydroelectric Energy, 2001, 19(4): 63-66 (in Chinese).
    • (2001) International Journal Hydroelectric Energy , vol.19 , Issue.4 , pp. 63-66
    • Zuo, Z.1    Wu, Y.2    Xiong, X.3
  • 18
    • 49649085433 scopus 로고    scopus 로고
    • Optimization model for distribution equipment maintenance scheduling based on network topology and genetic algorithm
    • (in Chinese).
    • Liu Yongmei, Sheng Wanxing. Optimization model for distribution equipment maintenance scheduling based on network topology and genetic algorithm[J]. Power System Technology, 2007, 31(21): 11-15 (in Chinese).
    • (2007) Power System Technology , vol.31 , Issue.21 , pp. 11-15
    • Liu, Y.1    Sheng, W.2
  • 19
    • 84870768238 scopus 로고    scopus 로고
    • Wind dataset
    • 2011-01-08
    • DOE/NREL/Alliance. Wind dataset[DB/OL]. 2011-01-08. http://www.nrel.gov/wind/integrationdatasets/eastern/methodology.html.
  • 20
    • 0032592961 scopus 로고    scopus 로고
    • The IEEE reliability test system-1996: a report prepared by the reliability test system task force of the application of probability methods subcommittee
    • Grigg C, Wong P, Albrecht P, et al. The IEEE reliability test system-1996: a report prepared by the reliability test system task force of the application of probability methods subcommittee[J]. IEEE Trans on Power Systems, 1999, 14(3): 1010-1020.
    • (1999) IEEE Trans on Power Systems , vol.14 , Issue.3 , pp. 1010-1020
    • Grigg, C.1    Wong, P.2    Albrecht, P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.