메뉴 건너뛰기




Volumn 26, Issue 13, 2006, Pages 14-19

Hydro-thermal generator maintenance scheduling based on credibility theory

Author keywords

Benders decomposition; Credibility theory; Cumulants method; Generator maintenance scheduling; Hydro thermal power system

Indexed keywords

HYDROELECTRIC POWER; INTEGER PROGRAMMING; MAINTENANCE; MATHEMATICAL MODELS; OUTAGES; SCHEDULING;

EID: 33747824444     PISSN: 02588013     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (30)

References (27)
  • 2
    • 0142261075 scopus 로고    scopus 로고
    • Research on the optimized planned-maintenance period of turbo-generator
    • Chinese source
    • Peng Hui, Zhang Yan, Zhang Yankui, et al. Research on the Optimized Planned-maintenance Period of Turbo-generator[J]. Proceedings of the CSEE, 2003, 23(7): 41-45 (in Chinese).
    • (2003) Proceedings of the CSEE , vol.23 , Issue.7 , pp. 41-45
    • Peng, H.1    Zhang, Y.2    Zhang, Y.3
  • 4
    • 85009308333 scopus 로고    scopus 로고
    • Chinese source
  • 5
    • 18744395780 scopus 로고    scopus 로고
    • Theory and model of engineering variable fuzzy set-mathematical basis for fuzzy hydrology and water resources
    • Chinese source
    • Chen Shouyu. Theory and model of engineering variable fuzzy set-mathematical basis for fuzzy hydrology and water resources[J]. Journal of Dalian University of Technology, 2005, 45(2): 308-312 (in Chinese).
    • (2005) Journal of Dalian University of Technology , vol.45 , Issue.2 , pp. 308-312
    • Chen, S.1
  • 6
    • 33644956659 scopus 로고    scopus 로고
    • Power system operation risk evaluation based on credibility theory
    • Chinese source
    • Feng Yongqing, Zhang Boming, Wu Wenchuan, et al. Power system operation risk evaluation based on credibility theory[J]. Automation of Electric Power Systems, 2006, 30(1): 17-23 (in Chinese).
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.1 , pp. 17-23
    • Feng, Y.1    Zhang, B.2    Wu, W.3
  • 7
    • 23744515645 scopus 로고    scopus 로고
    • A preliminary investigation on power system operation risk evaluation in the modem energy control center
    • Chinese source
    • Feng Yongqing, Wu Wenchuan, Sun Hongbin, et al. A preliminary investigation on power system operation risk evaluation in the modem energy control center[J]. Proceedings of the CSEE, 2005, 25(13): 73-79 (in Chinese).
    • (2005) Proceedings of the CSEE , vol.25 , Issue.13 , pp. 73-79
    • Feng, Y.1    Wu, W.2    Sun, H.3
  • 8
    • 85009331828 scopus 로고    scopus 로고
    • Chinese source
  • 10
    • 0345330176 scopus 로고    scopus 로고
    • ATC calculation with static security constraints using benders decomposition
    • Chinese source
    • Mohamed Shaaban, Liu Haoming, Li Weixing, et al. ATC Calculation with Static Security Constraints using Benders Decomposition[J]. Proceedings of the CSEE, 2003, 23(8): 7-11 (in Chinese).
    • (2003) Proceedings of the CSEE , vol.23 , Issue.8 , pp. 7-11
    • Shaaban, M.1    Liu, H.2    Li, W.3
  • 11
    • 0025432615 scopus 로고
    • Optimal scheduling of large hydro-thermal power systems
    • Chinese source
    • Bai Xiaomin, Yu Erkeng, Li Chaoan, et al. Optimal scheduling of large hydro-thermal power systems[J]. Proceedings of the CSEE, 1990, 10(3): 19-26 (in Chinese).
    • (1990) Proceedings of the CSEE , vol.10 , Issue.3 , pp. 19-26
    • Bai, X.1    Yu, E.2    Li, C.3
  • 12
    • 0026868528 scopus 로고
    • A decomposition approach to unit maintenance scheduling
    • Yellen J, Al-Khamis T M, Vemuri S, et al. A decomposition approach to unit maintenance scheduling[J]. IEEE Trans. on Power Systems, 1992, 7(2): 726-733.
    • (1992) IEEE Trans. on Power Systems , vol.7 , Issue.2 , pp. 726-733
    • Yellen, J.1    Al-Khamis, T.M.2    Vemuri, S.3
  • 13
    • 0034186789 scopus 로고    scopus 로고
    • Generation maintenance scheduling considering transmission constraints
    • da Silva E L, Th Schilling M, Rafael M C. Generation maintenance scheduling considering transmission constraints[J]. IEEE Trans on Power Systems, 2000, 15(2): 838-843.
    • (2000) IEEE Trans on Power Systems , vol.15 , Issue.2 , pp. 838-843
    • da Silva, E.L.1    Schilling, M.Th.2    Rafael, M.C.3
  • 15
    • 3142573007 scopus 로고    scopus 로고
    • Research on the modeling and algorithm to global generator and transmission maintenance scheduling
    • Chinese source
    • Ding Ming, Feng Yongqing. Research on the modeling and algorithm to global generator and transmission maintenance scheduling[J]. Proceedings of the CSEE, 2004, 24(5): 18-23 (in Chinese).
    • (2004) Proceedings of the CSEE , vol.24 , Issue.5 , pp. 18-23
    • Ding, M.1    Feng, Y.2
  • 16
    • 19644363594 scopus 로고    scopus 로고
    • Fast algorithm of generator maintenance scheduling in electricity market
    • Chinese source
    • Feng Yongqing, Zhang Boming, Wu Wenchuan, et al. Fast algorithm of generator maintenance scheduling in electricity market[J]. Automation of Electric Power Systems, 2004, 28(16): 41-44 (in Chinese).
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.16 , pp. 41-44
    • Feng, Y.1    Zhang, B.2    Wu, W.3
  • 17
    • 33747815368 scopus 로고
    • The cumulant method using available capacity distribution for two-area power system
    • Chinese source
    • Li Yuzeng, Yan Maosong, Fan Risheng. The cumulant method using available capacity distribution for two-area power system[J]. Proceedings of the CSEE, 1994, 14(6): 11-16 (in Chinese).
    • (1994) Proceedings of the CSEE , vol.14 , Issue.6 , pp. 11-16
    • Li, Y.1    Yan, M.2    Fan, R.3
  • 18
    • 85009321044 scopus 로고    scopus 로고
    • Chinese source
  • 19
    • 0023346057 scopus 로고
    • The mathematical model in multi-area reliability analysis
    • Chinese source
    • Ding Ming. The mathematical model in multi-area reliability analysis[J]. Proceedings of the CSEE, 1987, 7(3): 35-42 (in Chinese).
    • (1987) Proceedings of the CSEE , vol.7 , Issue.3 , pp. 35-42
    • Ding, M.1
  • 20
    • 0030143746 scopus 로고    scopus 로고
    • Probabilistic modeling for interconnected power systems based on the equivalent energy function approach
    • Chinese source
    • Li Linchuan, Wang xifan, Wang xiuli. Probabilistic modeling for interconnected power systems based on the equivalent energy function approach[J]. Proceedings of the CSEE, 1996, 16(3): 180-184 (in Chinese).
    • (1996) Proceedings of the CSEE , vol.16 , Issue.3 , pp. 180-184
    • Li, L.1    Wang, X.2    Wang, X.3
  • 21
    • 0036553298 scopus 로고    scopus 로고
    • Sequence-based analysis of probabilistic production cost simulation
    • Chinese source
    • Kang Chongqing, Xia Qing, Xiang Niande, et al. Sequence-based Analysis of Probabilistic Production Cost Simulation[J]. Proceedings of the CSEE, 2002, 22(4): 8-12 (in Chinese).
    • (2002) Proceedings of the CSEE , vol.22 , Issue.4 , pp. 8-12
    • Kang, C.1    Xia, Q.2    Xiang, N.3
  • 22
    • 0036757691 scopus 로고    scopus 로고
    • Implement of probabilistic production cost simulation algorithm based on sequence operation theory
    • Chinese source
    • Kang Chongqing, Bai Lichao, Xia Qing, et al. Implement of probabilistic production cost simulation algorithm based on sequence operation theory[J]. Proceedings of the CSEE, 2002, 22(9): 6-11 (in Chinese).
    • (2002) Proceedings of the CSEE , vol.22 , Issue.9 , pp. 6-11
    • Kang, C.1    Bai, L.2    Xia, Q.3
  • 23
    • 0034156385 scopus 로고    scopus 로고
    • Reliability model of wind power plants and its application
    • Chinese source
    • Chen Shuyong, Dai Huizhu, Bai xiaomin, et al. Reliability model of wind power plants and its application[J]. Proceedings of the CSEE, 2000, 20(3): 26-29 (in Chinese).
    • (2000) Proceedings of the CSEE , vol.20 , Issue.3 , pp. 26-29
    • Chen, S.1    Dai, H.2    Bai, X.3
  • 24
    • 0029276278 scopus 로고
    • Investigation of fuzzy real power flow modeling with probabilistic based information
    • Ling Jeengmin, Lin Chin E, Huang ChingLien. Investigation of fuzzy real power flow modeling with probabilistic based information[J]. Electric Power Systems Research, 1995, 32(3): 175-186.
    • (1995) Electric Power Systems Research , vol.32 , Issue.3 , pp. 175-186
    • Ling, J.1    Lin, C.E.2    Huang, C.3
  • 25
    • 0034335195 scopus 로고    scopus 로고
    • The evaluation method of fuzzy reliability in electric power network planning
    • Chinese source
    • Zhang Yan. The Evaluation method of fuzzy reliability in electric power network planning[J]. Proceedings of the CSEE, 2000, 20(11): 77-80 (in Chinese).
    • (2000) Proceedings of the CSEE , vol.20 , Issue.11 , pp. 77-80
    • Zhang, Y.1
  • 26
    • 0036473861 scopus 로고    scopus 로고
    • Including uncertainty in lole calculation using fuzzy set theory
    • Kim Jin O, Singh Chanan. Including uncertainty in lole calculation using fuzzy set theory[J]. IEEE Trans on Power Systems, 2002, 17(1): 19-25.
    • (2002) IEEE Trans on Power Systems , vol.17 , Issue.1 , pp. 19-25
    • Kim, J.O.1    Chanan, S.2
  • 27
    • 0035425559 scopus 로고    scopus 로고
    • A flexible unit maintenance scheduling considering uncertainties
    • Rong Ceng Leou. A flexible unit maintenance scheduling considering uncertainties[J]. IEEE Transactions on Power Systems, 2001, 16(3): 552-559.
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.3 , pp. 552-559
    • Leou, R.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.