GMS considering uncertainty in wind power in a wind-hydrothermal power system

Author keywords

Cost saving; Economic cost function; Generator maintenance scheduling; Smart grid; Uncertainty in wind generation

Indexed keywords

COST SAVING; ECONOMIC COST FUNCTION; GENERATOR MAINTENANCE; SMART GRID; UNCERTAINTY IN WIND GENERATION;

EID: 78649614041     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PES.2010.5589802     Document Type: Conference Paper
Times cited : (5)

References (16)
  • 1
    • 54949110987 scopus 로고    scopus 로고
    • Optimal generator maintenance scheduling using a modified discrete PSO
    • November
    • Y. Yare, G. K. Venayagamoorthy and U. O. Aliyu, "Optimal generator maintenance scheduling using a modified discrete PSO," IET Generation, Transmission & Distribution, vol. 2, no. 6, pp. 834-846, November 2008.
    • (2008) IET Generation, Transmission & Distribution , vol.2 , Issue.6 , pp. 834-846
    • Yare, Y.1    Venayagamoorthy, G.K.2    Aliyu, U.O.3
  • 3
    • 0032138729 scopus 로고    scopus 로고
    • Integrated generation and transmission maintenance scheduling with network constraints
    • August
    • M. K. C. Marwali and S. M. Shahidehpour, "Integrated generation and transmission maintenance scheduling with network constraints," IEEE Transactions on Power Systems, vol. 13, no. 3, pp. 1063-1068, August 1998.
    • (1998) IEEE Transactions on Power Systems , vol.13 , Issue.3 , pp. 1063-1068
    • Marwali, M.K.C.1    Shahidehpour, S.M.2
  • 4
    • 0034186789 scopus 로고    scopus 로고
    • Generation maintenance scheduling considering transmission constraints
    • May
    • E. L. da Silva, M. T. Schilling and M. C. Rafael, "Generation maintenance scheduling considering transmission constraints," IEEE Transactions on Power Systems, vol. 15, no. 2, pp. 838-843, May 2000.
    • (2000) IEEE Transactions on Power Systems , vol.15 , Issue.2 , pp. 838-843
    • Da Silva, E.L.1    Schilling, M.T.2    Rafael, M.C.3
  • 7
    • 84889498628 scopus 로고    scopus 로고
    • ISBN 10: 0-470-85508-8 (H/B), John Wiley & Sons Ltd, The Atrium, Southern Gate, Chichester, West Sussex PO19 8SQ, England
    • T. Ackermann, Wind Power in Power Systems. ISBN 10: 0-470-85508-8 (H/B), John Wiley & Sons Ltd, The Atrium, Southern Gate, Chichester, West Sussex PO19 8SQ, England, 2005.
    • (2005) Wind Power in Power Systems
    • Ackermann, T.1
  • 8
    • 0035451837 scopus 로고    scopus 로고
    • Using neural networks to estimate wind turbine power generation
    • September
    • Li Shuhui and D. C. Wunsch, "Using neural networks to estimate wind turbine power generation," IEEE Transactions on Energy Conversion, vol. 16, Issue 3, pp. 276-282, September 2001.
    • (2001) IEEE Transactions on Energy Conversion , vol.16 , Issue.3 , pp. 276-282
    • Li, S.1    Wunsch, D.C.2
  • 9
    • 34248596049 scopus 로고    scopus 로고
    • Quantifying the total net benefits of grid integrated wind
    • May
    • E. Denny and M. O'Malley, "Quantifying the total net benefits of grid integrated wind," IEEE Transactions on Power Systems, vol. 22, no. 2, pp. 605-615, May 2007.
    • (2007) IEEE Transactions on Power Systems , vol.22 , Issue.2 , pp. 605-615
    • Denny, E.1    O'Malley, M.2
  • 10
    • 77954834157 scopus 로고    scopus 로고
    • Intermittent wind generation in optimal power flow dispatching
    • R. A. Jabr and B. C. Pal, "Intermittent wind generation in optimal power flow dispatching," IET Generation, Transmission & Distribution, vol. 3, no. 1, pp. 66-74, 2008.
    • (2008) IET Generation, Transmission & Distribution , vol.3 , Issue.1 , pp. 66-74
    • Jabr, R.A.1    Pal, B.C.2
  • 11
    • 20544435971 scopus 로고    scopus 로고
    • Reactive compensation techniques to improve the ride-through capability of wind turbine during disturbance
    • May/June
    • C. Chompoo-inwai, C. Yingvivatanapong, K. Methaprayoon and W. Lee, "Reactive compensation techniques to improve the ride-through capability of wind turbine during disturbance," IEEE Transactions on Industry Applications, vol. 41, no. 3, pp. 666-672, May/June 2005.
    • (2005) IEEE Transactions on Industry Applications , vol.41 , Issue.3 , pp. 666-672
    • Chompoo-inwai, C.1    Yingvivatanapong, C.2    Methaprayoon, K.3    Lee, W.4
  • 12
    • 13844299158 scopus 로고    scopus 로고
    • System impact study for the interconnection of wind generation and utility system
    • January/February
    • C. Chompoo-inwai, W. Lee, P. Fuangfoo, M. Williams and J. R. Liao, "System impact study for the interconnection of wind generation and utility system," IEEE Transactions on Industry Applications, vol. 41, no. 1, pp. 163-168, January/February 2005.
    • (2005) IEEE Transactions on Industry Applications , vol.41 , Issue.1 , pp. 163-168
    • Chompoo-inwai, C.1    Lee, W.2    Fuangfoo, P.3    Williams, M.4    Liao, J.R.5
  • 13
    • 34248168515 scopus 로고    scopus 로고
    • Simulated annealing-based optimal wind-thermal coordination scheduling
    • C.-L. Chen, "Simulated annealing-based optimal wind-thermal coordination scheduling," IET Generation, Transmission & Distribution, vol. 1, no. 3, pp. 447-455, 2007.
    • (2007) IET Generation, Transmission & Distribution , vol.1 , Issue.3 , pp. 447-455
    • Chen, C.-L.1
  • 14
    • 70749084707 scopus 로고    scopus 로고
    • July. Available
    • US department of energy. (2009, July). Smart grid system report [Online]. Available: http://www.oe.energy.gov/DocumentsandMedia/SGSRMain-090707-lowres. pdf.
    • (2009) Smart Grid System Report [Online]


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.