-
1
-
-
79959733999
-
-
Chinese source
-
1990: 1-10.
-
(1990)
, pp. 1-10
-
-
-
2
-
-
79959692808
-
-
Chinese source
-
1983(1):83-93.
-
(1983)
, Issue.1
, pp. 83-93
-
-
-
3
-
-
79959709389
-
Multi-objective optimization of unit maintenance scheduling based on improved GA
-
(in Chinese)
-
Su Huiling, Wang Chun, Qin Rujing, et al. Multi-objective optimization of unit maintenance scheduling based on improved GA[J]. Proceedings of the CSU-EPSA, 2008, 20(6):27-30(in Chinese).
-
(2008)
Proceedings of the CSU-EPSA
, vol.20
, Issue.6
, pp. 27-30
-
-
Su, H.1
Wang, C.2
Qin, R.3
-
4
-
-
79959735937
-
Improved multi-ant colony virtual parallel optimization algorithm of generator maintenance schedule
-
(in Chinese)
-
Li Chuan, Yao Jiangang, Zhang Hongxu. Improved multi-ant colony virtual parallel optimization algorithm of generator maintenance schedule[J]. Proceedings of the CSU-EPSA, 2009, 21(4):120-124(in Chinese).
-
(2009)
Proceedings of the CSU-EPSA
, vol.21
, Issue.4
, pp. 120-124
-
-
Li, C.1
Yao, J.2
Zhang, H.3
-
5
-
-
67651064389
-
A generator maintenance scheduling model considering unexpected unit failures
-
(in Chinese)
-
Feng Changyou, Wang Xifan, Bie Zhaohong, et al. A generator maintenance scheduling model considering unexpected unit failures [J]. Automation of Electric Power Systems, 2009, 33(13):32-36(in Chinese).
-
(2009)
Automation of Electric Power Systems
, vol.33
, Issue.13
, pp. 32-36
-
-
Feng, C.1
Wang, X.2
Bie, Z.3
-
6
-
-
70350608292
-
Stochastic unit maintenance scheduling model for a power producer considering risk in power market
-
(in Chinese)
-
Feng Changyou, Wang Xifan, Wang Xiuli, et al. Stochastic unit maintenance scheduling model for a power producer considering risk in power market[J]. Proceedings of the CSEE, 2009, 29(28): 95-101(in Chinese).
-
(2009)
Proceedings of the CSEE
, vol.29
, Issue.28
, pp. 95-101
-
-
Feng, C.1
Wang, X.2
Wang, X.3
-
7
-
-
78651542455
-
A minimum power deficiency model for optimization of unit maintenance scheduling
-
(in Chinese)
-
Liao Shengli, Cheng Chuntian, Li Gang, et al. A minimum power deficiency model for optimization of unit maintenance scheduling[J]. Power System Technology, 2010, 34(10):38-42 (in Chinese).
-
(2010)
Power System Technology
, vol.34
, Issue.10
, pp. 38-42
-
-
Liao, S.1
Cheng, C.2
Li, G.3
-
8
-
-
78651525905
-
Solving unit maintenance scheduling problem by use of improved ant colony algorithm
-
(in Chinese)
-
Yuan Xiaotao, Yao Jiangang, Chen Liangji. Solving unit maintenance scheduling problem by use of improved ant colony algorithm[J]. Power System Technology, 2008, 32(21):42-46(in Chinese).
-
(2008)
Power System Technology
, vol.32
, Issue.21
, pp. 42-46
-
-
Yuan, X.1
Yao, J.2
Chen, L.3
-
9
-
-
78651528416
-
A bilevel programming model and partition searching algorithm for integrated maintenance scheduling
-
(in Chinese)
-
Yu Dayang, Han Xueshan, Zhao Jianguo. A bilevel programming model and partition searching algorithm for integrated maintenance scheduling[J]. Power System Technology, 2010, 34(4):88-93(in Chinese).
-
(2010)
Power System Technology
, vol.34
, Issue.4
, pp. 88-93
-
-
Yu, D.1
Han, X.2
Zhao, J.3
-
10
-
-
0035387284
-
Review of reliability and economy problems in generator maintenance scheduling
-
(in Chinese)
-
Ding Ming, Feng Yongqing. Review of reliability and economy problems in generator maintenance scheduling[J]. Electric Power, 2001, 34(7):22-25(in Chinese).
-
(2001)
Electric Power
, vol.34
, Issue.7
, pp. 22-25
-
-
Ding, M.1
Feng, Y.2
-
12
-
-
0024875551
-
Cumulant based probabilistic power system simulation using Laguerre polynomials
-
Tian W D, Sutanto D, Lee Y B, et al. Cumulant based probabilistic power system simulation using Laguerre polynomials[J]. IEEE Transactions on Energy Conversion, 1989, 4(4):567-574.
-
(1989)
IEEE Transactions on Energy Conversion
, vol.4
, Issue.4
, pp. 567-574
-
-
Tian, W.D.1
Sutanto, D.2
Lee, Y.B.3
-
14
-
-
0015281960
-
Power system simulation model based on probability analysis
-
Booth R R. Power system simulation model based on probability analysis[J]. IEEE Trans on Power Apparatus and Systems, 1972, 91(1):62-69.
-
(1972)
IEEE Trans on Power Apparatus and Systems
, vol.91
, Issue.1
, pp. 62-69
-
-
Booth, R.R.1
-
15
-
-
0019062868
-
Expected energy production costs by the method of moments
-
Rau N S, Toy P, Schenk K F. Expected energy production costs by the method of moments[J]. IEEE Trans on Power Apparatus and Systems, 1980, 99(5):1908-1917.
-
(1980)
IEEE Trans on Power Apparatus and Systems
, vol.99
, Issue.5
, pp. 1908-1917
-
-
Rau, N.S.1
Toy, P.2
Schenk, K.F.3
-
16
-
-
0024662288
-
A new method of generating unit maintenance scheduling for isolated and radically interconnected systems
-
(in Chinese)
-
Chen Gang. A new method of generating unit maintenance scheduling for isolated and radically interconnected systems[J]. Proceedings of the CSEE, 1989, 9(3):34-40(in Chinese).
-
(1989)
Proceedings of the CSEE
, vol.9
, Issue.3
, pp. 34-40
-
-
Chen, G.1
|