메뉴 건너뛰기




Volumn 35, Issue 5, 2011, Pages 97-102

Generation unit maintenance scheduling based on minimum cumulative risk algorithm for power system containing wind farms

Author keywords

Equivalent risk principle; Generator maintenance scheduling; Gram Charlier series; Minimum cumulative risk algorithm; Semi invariant; Wind farm

Indexed keywords

EQUIVALENT RISK PRINCIPLE; GENERATOR MAINTENANCE; GRAM-CHARLIER SERIES; MINIMUM CUMULATIVE RISK ALGORITHM; SEMI-INVARIANT; WIND FARM;

EID: 79959730246     PISSN: 10003673     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (15)

References (17)
  • 1
    • 79959733999 scopus 로고
    • Chinese source
    • 1990: 1-10.
    • (1990) , pp. 1-10
  • 2
    • 79959692808 scopus 로고
    • Chinese source
    • 1983(1):83-93.
    • (1983) , Issue.1 , pp. 83-93
  • 3
    • 79959709389 scopus 로고    scopus 로고
    • Multi-objective optimization of unit maintenance scheduling based on improved GA
    • (in Chinese)
    • Su Huiling, Wang Chun, Qin Rujing, et al. Multi-objective optimization of unit maintenance scheduling based on improved GA[J]. Proceedings of the CSU-EPSA, 2008, 20(6):27-30(in Chinese).
    • (2008) Proceedings of the CSU-EPSA , vol.20 , Issue.6 , pp. 27-30
    • Su, H.1    Wang, C.2    Qin, R.3
  • 4
    • 79959735937 scopus 로고    scopus 로고
    • Improved multi-ant colony virtual parallel optimization algorithm of generator maintenance schedule
    • (in Chinese)
    • Li Chuan, Yao Jiangang, Zhang Hongxu. Improved multi-ant colony virtual parallel optimization algorithm of generator maintenance schedule[J]. Proceedings of the CSU-EPSA, 2009, 21(4):120-124(in Chinese).
    • (2009) Proceedings of the CSU-EPSA , vol.21 , Issue.4 , pp. 120-124
    • Li, C.1    Yao, J.2    Zhang, H.3
  • 5
    • 67651064389 scopus 로고    scopus 로고
    • A generator maintenance scheduling model considering unexpected unit failures
    • (in Chinese)
    • Feng Changyou, Wang Xifan, Bie Zhaohong, et al. A generator maintenance scheduling model considering unexpected unit failures [J]. Automation of Electric Power Systems, 2009, 33(13):32-36(in Chinese).
    • (2009) Automation of Electric Power Systems , vol.33 , Issue.13 , pp. 32-36
    • Feng, C.1    Wang, X.2    Bie, Z.3
  • 6
    • 70350608292 scopus 로고    scopus 로고
    • Stochastic unit maintenance scheduling model for a power producer considering risk in power market
    • (in Chinese)
    • Feng Changyou, Wang Xifan, Wang Xiuli, et al. Stochastic unit maintenance scheduling model for a power producer considering risk in power market[J]. Proceedings of the CSEE, 2009, 29(28): 95-101(in Chinese).
    • (2009) Proceedings of the CSEE , vol.29 , Issue.28 , pp. 95-101
    • Feng, C.1    Wang, X.2    Wang, X.3
  • 7
    • 78651542455 scopus 로고    scopus 로고
    • A minimum power deficiency model for optimization of unit maintenance scheduling
    • (in Chinese)
    • Liao Shengli, Cheng Chuntian, Li Gang, et al. A minimum power deficiency model for optimization of unit maintenance scheduling[J]. Power System Technology, 2010, 34(10):38-42 (in Chinese).
    • (2010) Power System Technology , vol.34 , Issue.10 , pp. 38-42
    • Liao, S.1    Cheng, C.2    Li, G.3
  • 8
    • 78651525905 scopus 로고    scopus 로고
    • Solving unit maintenance scheduling problem by use of improved ant colony algorithm
    • (in Chinese)
    • Yuan Xiaotao, Yao Jiangang, Chen Liangji. Solving unit maintenance scheduling problem by use of improved ant colony algorithm[J]. Power System Technology, 2008, 32(21):42-46(in Chinese).
    • (2008) Power System Technology , vol.32 , Issue.21 , pp. 42-46
    • Yuan, X.1    Yao, J.2    Chen, L.3
  • 9
    • 78651528416 scopus 로고    scopus 로고
    • A bilevel programming model and partition searching algorithm for integrated maintenance scheduling
    • (in Chinese)
    • Yu Dayang, Han Xueshan, Zhao Jianguo. A bilevel programming model and partition searching algorithm for integrated maintenance scheduling[J]. Power System Technology, 2010, 34(4):88-93(in Chinese).
    • (2010) Power System Technology , vol.34 , Issue.4 , pp. 88-93
    • Yu, D.1    Han, X.2    Zhao, J.3
  • 10
    • 0035387284 scopus 로고    scopus 로고
    • Review of reliability and economy problems in generator maintenance scheduling
    • (in Chinese)
    • Ding Ming, Feng Yongqing. Review of reliability and economy problems in generator maintenance scheduling[J]. Electric Power, 2001, 34(7):22-25(in Chinese).
    • (2001) Electric Power , vol.34 , Issue.7 , pp. 22-25
    • Ding, M.1    Feng, Y.2
  • 12
    • 0024875551 scopus 로고
    • Cumulant based probabilistic power system simulation using Laguerre polynomials
    • Tian W D, Sutanto D, Lee Y B, et al. Cumulant based probabilistic power system simulation using Laguerre polynomials[J]. IEEE Transactions on Energy Conversion, 1989, 4(4):567-574.
    • (1989) IEEE Transactions on Energy Conversion , vol.4 , Issue.4 , pp. 567-574
    • Tian, W.D.1    Sutanto, D.2    Lee, Y.B.3
  • 14
    • 0015281960 scopus 로고
    • Power system simulation model based on probability analysis
    • Booth R R. Power system simulation model based on probability analysis[J]. IEEE Trans on Power Apparatus and Systems, 1972, 91(1):62-69.
    • (1972) IEEE Trans on Power Apparatus and Systems , vol.91 , Issue.1 , pp. 62-69
    • Booth, R.R.1
  • 16
    • 0024662288 scopus 로고
    • A new method of generating unit maintenance scheduling for isolated and radically interconnected systems
    • (in Chinese)
    • Chen Gang. A new method of generating unit maintenance scheduling for isolated and radically interconnected systems[J]. Proceedings of the CSEE, 1989, 9(3):34-40(in Chinese).
    • (1989) Proceedings of the CSEE , vol.9 , Issue.3 , pp. 34-40
    • Chen, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.